Red flags

  • 10 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
0 of 44Construction stages doneacross 4 buildings; furthest along: Excavation, 90%
10Complaints at MahaRERAon this registration
Jump to the 208 documents Report an error

VKG ESTATES is a Residential / Group Housing project by Greenery Rock LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800001980 on 31 Jul 2017. Possession is promised by 30 Dec 2026. 10 complaints are on record with the regulator.

At a glance

Project

  • NameVKG ESTATES
  • TypeResidential / Group Housing
  • Location
    • Andheri East
    • Near Police Camp
    • Andheri
    • Mumbai Suburban
    • 400059
  • Pincode400059
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800001980
  • ReraGenie IDRG-MH-09872

Builder

  • NameGreenery Rock LLP
  • Entity typePartnership
  • GSTIN27AANFG8150E1ZA
  • PartnersAnushree Devesh Gupta, Vijay Shreegopal Khetan, Meena Vijay Khetan

Key dates

this monthRegisteredJul 2017PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on31 Jul 2017
  • Promised completion30 Dec 2026
  • Revised completionNone
  • Buildings4 building records
  • Documents filed208 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
PALM APARTMENTS WING BNA180000
OAK APARTMENTS WING ANA180000
MAPLE APARTMENTS WING CNA180000
WILLOW APARTMENTS WING DNA180000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 23 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Excavation, at 90%.

PALM APARTMENTS WING B10%
ActivityProgress
Excavation90%
Basement (if any)10%
Podiums (if any)0%
Plinth10%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
OAK APARTMENTS WING A9%
ActivityProgress
Excavation90%
Basement (if any)5%
Podiums (if any)0%
Plinth5%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
MAPLE APARTMENTS WING C15%
ActivityProgress
Excavation90%
Basement (if any)40%
Podiums (if any)0%
Plinth40%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WILLOW APARTMENTS WING D15%
ActivityProgress
Excavation90%
Basement (if any)40%
Podiums (if any)0%
Plinth40%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 23 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed133

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots133
Closed/Covered132
Open Space1
BuildingClosed/CoveredOpen SpaceTotal
PALM APARTMENTS WING B22022
OAK APARTMENTS WING A37138
MAPLE APARTMENTS WING C33033
WILLOW APARTMENTS WING D40040

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,400 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityBrihanmumbai Municipal Corporation (BMC)
Permissible FSI11821.53
Proposed, not sanctioned4,180 sq m
Buildings approved5
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchA1 MUKUND NAGAR SOCIETY ANDHERI KURLA ROAD MAROL ANDHERI EAST MUMBAI 400059

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPRIYANK BHATT
EngineerJW CONSULTANTS LLP
Chartered AccountantVarma And Associates
Chartered AccountantSanjay Kothari
PartnerRole in project
Greenery Rock LLP-

Litigation declared1

CaseCourtStatus
1132/2017High CourtPending

Complaints filed with MahaRERA10

Case no.ComplainantRespondentFiled
CC006000000012157Viren V JadhavVijay Khetan & Greenery Rock LLP27/11/2017
CC006000000397871Greenary Rock LlpKamlesh Jain30/10/2023
CC12502164Huzefa Saifuddin VasadwalaGreenery Rock LLP30/06/2025
CC12503314Nisar Ahmed Mohamed Sharif ShaikhGreenery Rock LLP16/09/2025
CC12503953Shubhransu Prava BeheraGreenery Rock LLP11/11/2025
CC12503958YASHODHARA BEHERAGreenery Rock LLP11/11/2025
CC12600337Vijendra Bhikaji SawantVKG Greenery Rock LLP (Vijay Khetan Group)17/01/2026
CC12601291Ashok Acchelal GuptaGreenery Rock LLP10/03/2026
CC12601385LOPMUDRA BEHERAGreenery Rock LLP12/03/2026
CC12602441MAYANK ShuklaGreenery Rock LLP26/04/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 11 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 22 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 13 Oct 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 20 Apr 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Dec 2026

Documents filed208

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 208 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1.pdf23 Jun 2026
Form 2File: Form 2.pdf23 Jun 2026
Form 3File: Form 3.pdf23 Jun 2026
Disclosure of Sold and Booked InventoryFile: EST_DISCLOSURE OF SOLD_1_Jan_to_31_Mar_2026.pdf23 Jun 2026
Self-declaration of Quarterly ProgressFile: DECLARATION ABOUT COMMENCEMNT CERTIFICATE 1_Jan_to_31_Mar_2026.pdf23 Jun 2026
Form 1File: Q3_Architect_RERA CERTIFICATE.pdf23 Mar 2026
Form 2File: Q3 Engineer certificate.pdf23 Mar 2026
Disclosure of Sold and Booked InventoryFile: EST_DISCLOSURE OF SOLD_1_Oct_to_31_Dec_2025.pdf23 Mar 2026
Form 3File: Q3_CA_GRLLP RERA Form-3.pdf23 Mar 2026
Self-declaration of Quarterly ProgressFile: DECLARATION ABOUT COMMENCEMNT CERTIFICATE 1_Oct_to_31_Dec_2025.pdf23 Mar 2026
Form 1File: Architect_Q1-1-april to 30-june-2025.pdf21 Mar 2026
Form 2File: Engineer Certificate 1_April_30_June_2025.pdf21 Mar 2026
Disclosure of Sold and Booked InventoryFile: EST_DISCLOSURE OF SOLD_1_April_30_June_2025.pdf21 Mar 2026
Self-declaration of Quarterly ProgressFile: DECLARATION ABOUT COMMENCEMNT CERTIFICATE 1_April_To_30_June_2025.pdf21 Mar 2026
Form 3File: CA_Certificate_1_April_30_June_2025.pdf21 Mar 2026
Form 1File: Architect_Q2_RERA CERTIFICATE (1).pdf21 Mar 2026
Form 2File: Engginer_Certificate Form I_1_Jul_30_Sept_2025.pdf21 Mar 2026
OthersFile: Engineer Certificate --1_April_30_June_2025.pdf21 Mar 2026
Form 3File: GRLLP RERA Form-3 Sept 2025.pdf21 Mar 2026
Disclosure of Sold and Booked InventoryFile: EST_DISCLOSURE OF SOLD_1_Jul_30_Sep_2025.pdf21 Mar 2026
Self-declaration of Quarterly ProgressFile: DECLARATION ABOUT COMMENCEMNT CERTIFICATE 1_Jul_To_30_Sept_2025.pdf21 Mar 2026
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: EST_Engginer_Certificate Form I_1_July_to_30_Sept_2024.pdf24 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: EST_Engginer_Certificate Form I_1_Oct_to_31_Dec_2024.pdf24 Feb 2025
Certificates of CA (Form 3)File: Form3_VKG Estate.pdf22 Feb 2025
Certificates of CA (Form 3)File: CA_FORM No_3_1_July_to_30_Sept_2024.pdf22 Feb 2025
Certificates of CA (Form 3)File: CA_FORM No_3_1_Oct_to_31_Dec_2024.pdf22 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: EST_Engginer_Certificate Form I_1_Aprli_to_30_June_2024.pdf22 Feb 2025
Disclosure of sold/ booked inventoryFile: EST_DISCLOSURE OF SOLD_1_Aprli_to_30_June_2024.pdf22 Feb 2025
Disclosure of sold/ booked inventoryFile: EST_DISCLOSURE OF SOLD_1_July_to_30_Sept_2024.pdf22 Feb 2025
Disclosure of sold/ booked inventoryFile: EST_DISCLOSURE OF SOLD_1_Oct_to_31_Dec_2024.pdf22 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: EST_ Architect_CERTIFICATE 1_July_to_30_Sept_2024.pdf20 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate 30Sept 2024.pdf20 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate 31DEC2024.pdf20 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCH RERA CERTIFICATE.pdf23 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: EST_Engginer_Certificate Form 2_1_Jan_to_31_Mar_2024.pdf24 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: EST_Engginer_Certificate Form 2A_1_Jan_to_31_Mar_2024.pdf24 May 2024
Certificates of CA (Form 3)File: Form3_VKG Estate.pdf4 May 2024
Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMNT CERTIFICATE.pdf29 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCH RERA CERTIFICATE.pdf29 Apr 2024
Disclosure of sold/ booked inventoryFile: EST_DISCLOSURE OF SOLD_1_Jan_to_31_Mar_2024.pdf29 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect_1_Oct_to_31_Dec_2023.pdf25 Jan 2024
Certificates of CA (Form 3)File: CA Rera Certificate.pdf25 Jan 2024
Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMNT CERTIFICATE 1_Oct_to_31_Dec_2023.pdf20 Jan 2024
Disclosure of sold/ booked inventoryFile: EST_DISCLOSURE OF SOLD_1_Oct_to_31_Dec_2023.pdf20 Jan 2024
Disclosure of sold/ booked inventoryFile: EST_DISCLOSURE OF SOLD_1_Oct_to_31_Dec_2023.pdf20 Jan 2024
Certificates of CA (Form 3)File: EST_ CA_CERTIFICATE 1_July_to_30_Sept_2023.pdf2 Nov 2023
Disclosure of sold/ booked inventoryFile: EST_DISCLOSURE OF SOLD_1_July_to_30_Sept_2023.pdf21 Oct 2023
Declaration about Commencement CertificateFile: VKG_ESTATE_FurtherCC.pdf19 Oct 2023
Building plan approvalFile: 1-2AMENDED.pdf13 Oct 2023
Building plan approvalFile: 3-6AMENDED.pdf13 Oct 2023
Building plan approvalFile: 7-10.pdf13 Oct 2023
Building plan approvalFile: 11-12.pdf13 Oct 2023
Building plan approvalFile: Amended Letter.pdf13 Oct 2023
Building Plan Approval (IOD)File: 1-2AMENDED.pdf13 Oct 2023
Building Plan Approval (IOD)File: 3-6AMENDED.pdf13 Oct 2023
Building Plan Approval (IOD)File: 7-10.pdf13 Oct 2023
Building Plan Approval (IOD)File: 11-12.pdf13 Oct 2023
Building Plan Approval (IOD)File: Amended Letter.pdf13 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT RERA CERTIFICATE.pdf8 Aug 2023
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD_1_April_to_30June_2023.pdf8 Aug 2023
Certificates of CA (Form 3)File: Form 3 CA Certificate_1_April_to_30_June_2023.pdf8 Aug 2023
Declaration about Commencement CertificateFile: Declaration of CC.pdf6 Jun 2023
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD_01_01_2023_31_05_2023.pdf6 Jun 2023
Certificates of CA (Form 3)File: CA_Form_III_1 Jan_to_31 March.pdf6 Jun 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: GRLLP 2021-2022Form 5.pdf22 Apr 2023
Disclosure of sold/ booked inventoryFile: Revised DISCLOSURE OF SOLD.pdf11 Feb 2023
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD.pdf28 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Marol Form 2.pdf27 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Marol Form 2A.pdf27 Jan 2023
Certificates of CA (Form 3)File: RERA Form 3.pdf27 Jan 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RERA CERTIFICATE.pdf24 Jan 2023
Certificates of CA (Form 5)File: 2022 Form 5.pdf20 Dec 2022
Disclosure of sold/ booked inventoryFile: rers sold unsold_rotated.pdf30 Sep 2022
Certificates of CA (Form 3)File: GRPL RERA Form 3 CA Certificate.pdf29 Sep 2022
Building plan approvalFile: 1.pdf5 May 2022
Building plan approvalFile: 2.pdf5 May 2022
Building plan approvalFile: 3.pdf5 May 2022
Building plan approvalFile: 4.pdf5 May 2022
Building plan approvalFile: 5.pdf5 May 2022
Building plan approvalFile: 6.pdf5 May 2022

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep VKG ESTATES on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Near Police Camp6,700+ in Mumbai Suburban

2 kmVKG ESTATESCompleted 105Lapsed / revoked 49Other 48Dot size: filed unitsN

Filed coordinates, straight-line distance. 202 registered projects within 2 km.

Builder: Greenery Rock LLP

Greenery Rock LLP has 1 registration on MahaRERA, including VKG ESTATES. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if VKG ESTATES is delayed beyond 30 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VKG ESTATES?

The registered promoter entity is Greenery Rock LLP, a partnership as per the filing. Its GSTIN 27AANFG8150E1ZA can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VKG ESTATES?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against VKG ESTATES?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for VKG ESTATES?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VKG ESTATES?

The professionals named in the filing: Architect: PRIYANK BHATT; Engineer: JW CONSULTANTS LLP; Chartered Accountant: Varma And Associates; Chartered Accountant: Sanjay Kothari. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VKG ESTATES?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VKG ESTATES. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VKG ESTATES to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.