VJ IndiLife Wakad
By Vilas Javdekar Lifestyle Developers Pvt. Ltd.
RG-MH-67326 · RERA P52100050594 · Last updated on MahaRERA portal: 15 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 1 complaint at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
VJ IndiLife Wakad is a Others project by Vilas Javdekar Lifestyle Developers Pvt. Ltd. in Pune, Maharashtra, registered with MahaRERA as P52100050594 on 21 Apr 2023. Possession is promised by 30 Jun 2027. 470 of the 476 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.
At a glance
Project
- NameVJ IndiLife Wakad
- TypeOthers
- Location
- Pune Bangalore Highway
- Opposite Sayaji Hotel
- Wakad
- Mulshi
- Pune
- 411057
- Pincode411057
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100050594
- ReraGenie IDRG-MH-67326
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on21 Apr 2023
- Promised completion30 Jun 2027
- Revised completionNone
- Buildings1 building record
- Documents filed183 files
Current status
Figures as on 15 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Residential and Commercial Building | NA | 36 | 34 | 476 | 0 | 476 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 15 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
9 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 97%.
Residential and Commercial Building: 91% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 97% |
Progress on shared amenities15
As on 15 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 95% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 95% |
| Aggregate area of recreational Open Space | Yes | 90% |
| Open Parking | Yes | 0% |
Parking filed558
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Mr. Ravi Ghanshyam Sukhwani | Pimpri Chinchawad (M Corp.) | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Residential and Commercial Building | NA | Rs 61.25 cr | Rs 61.06 cr |
| - | NA | Rs 4.70 cr | Rs 4.50 cr |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Sameer Murari Valimbe |
| Architect | Deepali Patidar |
| Architect | Asad Jawed Ahmed |
| Engineer | Sagar Kale |
| Chartered Accountant | Abhijit Mundada |
| Chartered Accountant | Sunil Shamrao Nimbalkar |
| Partner | Role in project |
|---|---|
| Vilas Javdekar Lifestyle Developers Pvt. Ltd. | - |
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12603893 | Ritesh Jha | Vilas Javdekar Lifestyle Developers Pvt. Ltd. | 23/06/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 6 Apr 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 14 Jul 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 14 Jul 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 14 Jul 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Jun 2027
Documents filed183
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 183 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 5 (FY 2023-2024)File: 21_Form 5 VJ IndiLife Wakad_signed.pdf | 15 Jul 2026 |
| Withdrawal Update Form 1File: Architect certificate VJ Indilife Wakad 30-06-26.pdf | 13 Jul 2026 |
| Withdrawal Update Form 2File: Engineer certiifcate VJ Indilife waakd 30-06-26 .pdf | 13 Jul 2026 |
| Withdrawal Update Form 3File: CA certificate VJ Indilife Wakad_30-06-2026.pdf | 13 Jul 2026 |
| Withdrawal Update Form 1File: Architect Certificate Indilife wakad 22-06-26.pdf | 11 Jul 2026 |
| Withdrawal Update Form 2File: Engineer Certifcate Indilife wakad 22-06-26.pdf | 11 Jul 2026 |
| Withdrawal Update Form 3File: CA certificate VJ Indilife Wakad_22-06-2026.pdf | 11 Jul 2026 |
| Withdrawal Update Form 1File: Architect Certificate Indilife wakad 29-05-2026.pdf | 22 Jun 2026 |
| Withdrawal Update Form 2File: Engineer Certificate VJ Indilife Wakad 08-06-26.pdf | 22 Jun 2026 |
| Withdrawal Update Form 3File: CA certificate VJ Indilife Wakad_08-06-2026.pdf | 22 Jun 2026 |
| Withdrawal Update Form 1File: Architect Certificate Indilife wakad 29-05-2026.pdf | 11 Jun 2026 |
| Withdrawal Update Form 2File: Enginner Certiifcate VJ Indilife wakad 29-05-26.pdf | 11 Jun 2026 |
| Withdrawal Update Form 3File: CA Certificate VJ Indilife Wakad 30-05-26.pdf | 11 Jun 2026 |
| Withdrawal Update Form 1File: Architect Certificate Indilife wakad 11-05-26 .pdf | 22 May 2026 |
| Withdrawal Update Form 2File: Engineer certificate VJ Indilife wakad 11-05-26.pdf | 22 May 2026 |
| Withdrawal Update Form 3File: CA certificate VJ Indilife Wakad_11-05-2026_.pdf | 22 May 2026 |
| Form 2A (FY 2025-2026)File: Form 2 A VJ Indilife Wakad Signed.pdf | 30 Apr 2026 |
| Withdrawal Update Form 1File: Architect Certificate Indilife Wakad 31-03-26.pdf | 20 Apr 2026 |
| Withdrawal Update Form 2File: Engg certi_VJ Indilife Kharadi_30032026 Signed.pdf | 20 Apr 2026 |
| Withdrawal Update Form 3File: Scanned Copy of VJ Indilife Wakad.pdf | 20 Apr 2026 |
| Withdrawal Update Form 1File: Architect certificate VJ Indilife Wakad 10-02-26.pdf | 25 Feb 2026 |
| Withdrawal Update Form 2File: Enginner certificate VJ Indilife wakad 10-02-26 .pdf | 25 Feb 2026 |
| Withdrawal Update Form 3File: CA Certificate Indilife wakad 11-02-26.pdf | 25 Feb 2026 |
| Withdrawal Update Form 1File: Architect Certificate VJ Indilife wakad 23-01-26.pdf | 12 Feb 2026 |
| Withdrawal Update Form 2File: Engineer Certiifcate Indilife Wakad 23-01-26.pdf | 12 Feb 2026 |
| Withdrawal Update Form 3File: CA Certificate VJ Indilife Wakad 24-01-2026.pdf | 12 Feb 2026 |
| Withdrawal Update Form 1File: Architect Certificate Indilife Wakad31-12-25.pdf | 13 Jan 2026 |
| Withdrawal Update Form 2File: Engineer Certificate Indilife Wakad 31-12-25.pdf | 13 Jan 2026 |
| Withdrawal Update Form 3File: CA Certiifcate VJ Indilife Wakad 31-12-25.pdf | 13 Jan 2026 |
| Withdrawal Update Form 1File: Architect Certificate Indilife Wakad 15-12-2025.pdf | 24 Dec 2025 |
| Withdrawal Update Form 2File: Engineer certificate Indilife wakad 15-12-25.pdf | 24 Dec 2025 |
| Withdrawal Update Form 3File: CA Certificate VJ INDILIFE WAKAD 15-12-2025.pdf | 24 Dec 2025 |
| Withdrawal Update Form 1File: Architect Certificate Indilife wakad 01-12-25.pdf | 8 Dec 2025 |
| Withdrawal Update Form 2File: Engineer Certificate Indilife wakad 01-12-25.pdf | 8 Dec 2025 |
| Withdrawal Update Form 3File: CA Certificate Indilife wakad 01-12-25.pdf | 8 Dec 2025 |
| Withdrawal Update Form 1File: Architect Certificate Indilife Wakad 09-11-25.pdf | 1 Dec 2025 |
| Withdrawal Update Form 2File: Engineer Certificate Indilife waakd 09-11-25 Signed.pdf | 1 Dec 2025 |
| Withdrawal Update Form 3File: CA Certificate VJILW 10-11-25 Signed.pdf | 1 Dec 2025 |
| Withdrawal Update Form 1File: Architect certificate Indilife wakad 30-09-25.pdf | 11 Oct 2025 |
| Withdrawal Update Form 2File: Engineer certificate Indilife Wakad 30-09-25.pdf | 11 Oct 2025 |
| Withdrawal Update Form 3File: CA Certificate VJ indilife Wakad 30-09-25.pdf | 11 Oct 2025 |
| Form 5 (FY 2024-2025)File: VJLDPL_Form 5_P52100050594_VJILW.pdf | 30 Sep 2025 |
| Withdrawal Update Form 1File: Architect certificate Indilife Wakad 21-09-25.pdf | 29 Sep 2025 |
| Withdrawal Update Form 2File: Engineer certificate VJ Indilife Wakad 21-09-25.pdf | 29 Sep 2025 |
| Withdrawal Update Form 3File: CA certificate Indilife wakad 22-09-25.pdf | 29 Sep 2025 |
| Withdrawal Update Form 1File: Architect certificate Indilife Wakad 08-09-25.pdf | 12 Sep 2025 |
| Withdrawal Update Form 2File: Engineer certificate VJILW 08-09-25.pdf | 12 Sep 2025 |
| Withdrawal Update Form 3File: CA certificate Indilife Wakad 09-09-25.pdf | 12 Sep 2025 |
| Withdrawal Update Form 1File: Architech certificate Indilife wakad 18-08-25.pdf | 22 Aug 2025 |
| Withdrawal Update Form 2File: Engineer certificate Indilife wakad 18-08-25.pdf | 22 Aug 2025 |
| Withdrawal Update Form 3File: CA certificate (Form 3)_VJ Indilife Wakad_stamp and signed.pdf | 22 Aug 2025 |
| Withdrawal Update Form 1File: Architech certificate Indilife wakad 27-07-25.pdf | 5 Aug 2025 |
| Withdrawal Update Form 2File: Engineer certificate Indilife wakad 27-07-25.pdf | 5 Aug 2025 |
| Withdrawal Update Form 3File: CA Certificate Indilife wakad 28-07-25.pdf | 5 Aug 2025 |
| Withdrawal Update Form 1File: Architech Certificate Indilife wakad 30-06-25.pdf | 11 Jul 2025 |
| Withdrawal Update Form 2File: Engineer certiifcate Indilife wakad 30-06-25.pdf | 11 Jul 2025 |
| Withdrawal Update Form 3File: VJLDPL- VJ INDILIFE WAKAD.pdf | 11 Jul 2025 |
| Form 2A (FY 2024-2025)File: VJILW_Form2A_31032025_Signed.pdf | 26 Jun 2025 |
| Form 1File: VJILW_Deepali_31-03-25_Signed (1).pdf | 6 May 2025 |
| Form 2File: Engineer certificate VJILW 31-3-25- (1).pdf | 6 May 2025 |
| Form 3File: VJILW_CA_ 31032025_Signed.pdf | 6 May 2025 |
| Disclosure of Sold and Booked InventoryFile: VJILW_Sold Inventory_31032025_Signed.pdf | 6 May 2025 |
| OthersFile: VJILW_Form2A_31032025_Signed.pdf | 6 May 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: VJILW_Form2A_31032025_Signed.pdf | 26 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: VJILW_Sold Inventory_31032025_Signed.pdf | 22 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: VJILW_Deepali_31-03-25_Signed.pdf | 7 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate VJILW 31-3-25-.pdf | 4 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate (Form 3)_VJ Indilife Wakad_ Signed-.pdf | 3 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate VJ Indilife Wakad__signed.pdf | 21 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate VILW 19-03-25_signed.pdf | 21 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech Certificate_VJILW_Deepali_19-03-25_signed.pdf | 20 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect VJILW_Deepali_03-03-25_signed.pdf | 10 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate (Form 3)_VJ Indilife Wakad_signed.pdf | 10 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate Indilife wakad 07-03-25_signed.pdf | 10 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech certificate Indilife wakad 24-02-25_signed.pdf | 28 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate VJ Indilife Wakadsigned.pdf | 28 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate VJIW 24-02-25_signed.pdf | 28 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech certificate Indilife wakad 17-02-25_signed.pdf | 20 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Enginner certificate VJILW 17-02-25_signed.pdf | 20 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate Indilife Wakad.pdf | 18 Feb 2025 |
Promoter's earlier projects3
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Yashwin Encore | S No 146 1A 1 to 5 Wakad Pune 411057 | 518 | Completed | Dec 2023 | Jun 2022 |
| MHADA Yashwin Encore | S No 146 1A 1 Binsheti Part Wakad Pune 411057 | 64 | Completed | Dec 2023 | Oct 2021 |
| Portia | S.NO. 270 1 11 PALLOD FARM IN FRONT OF BHARAT PETROLEUM PETROL PUMP BANER PUNE 411045 | 32 | Completed | Dec 2018 | Late, Sep 2019 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 5 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 183 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep VJ IndiLife Wakad on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Opposite Sayaji Hotel13,700+ in Pune
Filed coordinates, straight-line distance. 261 registered projects within 2 km.
Godrej Evergreen Square
Godrej Projects Development Limited
The Aqua Retreat at Godrej Park World
Maan-Hinje Township Developers Private Lim
The Gale at Godrej Park World
Maan-Hinje Township Developers LLP
VTP BELLISSIMO PHASE 1
MAGNITE DEVELOPERS PRIVATE LIMITED
Life Republic Sector R1 - 1st Avenue
KOLTE-PATIL DEVELOPERS LIMITED
The Greenfront at Godrej Park World
Maan Hinje Township Developers Private Lim
Builder: Vilas Javdekar Lifestyle Developers Pvt. Ltd.
Vilas Javdekar Lifestyle Developers Pvt. Ltd. has 6 registrations on MahaRERA, including Portia and Yashwin Encore. Its filings disclose 3 earlier MahaRERA projects: declares 2 of 3 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if VJ IndiLife Wakad is delayed beyond 30 Jun 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of VJ IndiLife Wakad?
The registered promoter entity is Vilas Javdekar Lifestyle Developers Pvt. Ltd., a company as per the filing. Its CIN U45200PN2012PTC144265 and GSTIN 27AAECV1331J1ZE can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in VJ IndiLife Wakad?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against VJ IndiLife Wakad?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for VJ IndiLife Wakad?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at VJ IndiLife Wakad?
The professionals named in the filing: Architect: Sameer Murari Valimbe; Architect: Deepali Patidar; Architect: Asad Jawed Ahmed; Engineer: Sagar Kale; Chartered Accountant: Abhijit Mundada; Chartered Accountant: Sunil Shamrao Nimbalkar. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in VJ IndiLife Wakad?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback