ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / VIVANTA S BLISS

Registration lapsed No litigation declared Others project

VIVANTA S BLISS

By JAI BHAWANI ORCHID INFRA LLP

RG-MH-89166 · RERA P51700014993 · Last updated on MahaRERA portal: 9 Nov 2024

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 40 months past the filed date
  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Jun 2023Possession promised40 months past this date
0 of 44Construction stages doneacross 4 buildings; furthest along: Excavation, 0%
0Complaints at MahaRERAon this registration
Jump to the 86 documents Report an error

VIVANTA S BLISS is a Others project by JAI BHAWANI ORCHID INFRA LLP in Thane, Maharashtra, registered with MahaRERA as P51700014993 on 15 Jan 2018. Possession was promised by 30 Jun 2023 and is now 40 months past that date. The completion date has moved by 12 months from the original filing.

At a glance

Project

  • NameVIVANTA S BLISS
  • TypeOthers
  • Location
    • JAI MATADI COMPOUND
    • KALHER
    • Kalher (CT)
    • Bhiwandi
    • Thane
    • 421302
  • Pincode421302
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700014993
  • ReraGenie IDRG-MH-89166

Builder

  • NameJAI BHAWANI ORCHID INFRA LLP
  • Entity typePartnership
  • PartnersMAHESH JAGAN SALVI, VINOD BALARAM SALVI, JIGNESH MAGANLAL GADA, AJITKUMAR MADANRAJ CHOPDA, SATISH KIRANRAJ PUNAMIYA, CHIRAG SHAMJI GADA
  • Other registrations3 more →
  • Completed1 of 4
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

40 months past promisethis monthRegisteredJan 2018First promiseJun 2022Revised toJun 2023

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on15 Jan 2018
  • Promised completion30 Jun 2023
  • Revised completionRevised to 30 Jun 2023 (originally 30 Jun 2022)
  • Buildings4 building records
  • Documents filed86 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING ANA110000
WING BNA110000
WING CNA90000
WING DNA90000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 9 Nov 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Excavation, at 0%.

WING A0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING B0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING C0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING D0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 9 Nov 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed51

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots51
Closed/Covered51
BuildingClosed/CoveredTotal
WING A2222
WING B2222
WING C33
WING D44

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area5,312 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
RAMNIKLAL J SHAHThane (M Corp.)Thane

Approvals and building plan

Permissible FSI7675.08
Proposed, not sanctioned4,928 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchTHANE

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSHRI SUDHIR THORAT
PartnerRole in project
JAI BHAWANI ORCHID INFRA LLP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700012158Jun 2022 → Jun 2023

Reason as filed by the promoterDue to Pandemic First wave and second wave of Covid Outbreak, project was delayed due to unforseen circumstances and hence extension is required

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Dec 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 12 Mar 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 28 Dec 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 12 Mar 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 18 Feb 2023

Documents filed86

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 86 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: FORM 4 signed .pdf9 Nov 2024
Architect’s Certificate on Completion of Project (Form 4)File: FORM 4 signed .pdf8 Nov 2024
Certificates of CA (Form 3)File: JBD RERA_compressed.pdf12 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 18042018uploaded on webpage.pdf31 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf27 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf27 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf27 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf27 Mar 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM-2A March 2022.pdf27 Mar 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM-2A March 2021.pdf27 Mar 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM-2A March 2022.pdf27 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 March 2021 BUILDING 1 WING A AND B.PDF8 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 March 2021 BUILDING 2 WING D.PDF8 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 March 2022 BUILDING 1 WING A AND B.PDF8 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 March 2022 BUILDING 2 WING D.PDF8 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 04032023.pdf8 Mar 2023
Certificates of CA (Form 3)File: JBD April 20 - March 21.pdf8 Mar 2023
Certificates of CA (Form 3)File: Signed form 5 FY 20-21_compressed.pdf18 Feb 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupancy Certificate AB Wing.pdf18 Feb 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupancy Certificate D Wing.pdf18 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: form 5.pdf4 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Signed form 5 JBD FY 2019-20_compressed.pdf3 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Signed form 5 FY 20-21_compressed.pdf3 Feb 2023
Layout approvalFile: Approved Layout Plan dt 04032022.pdf12 Mar 2022
Layout approvalFile: 2 Approved Layout Plan dt 04032022.pdf12 Mar 2022
Layout approvalFile: 3 Approved Plan Wing c dt 04032022.pdf12 Mar 2022
Layout approvalFile: 4 Approved Plan Wing c dt 04032022.pdf12 Mar 2022
Layout approvalFile: 5Approved Plan Wing D dt 04032022.pdf12 Mar 2022
Layout approvalFile: 6 Approved Plan Wing D dt 04032022.pdf12 Mar 2022
Copy of Layout Approval (in case of layout)File: Approved Layout Plan dt 04032022.pdf12 Mar 2022
Copy of Layout Approval (in case of layout)File: 2 Approved Layout Plan dt 04032022.pdf12 Mar 2022
Copy of Layout Approval (in case of layout)File: 3 Approved Plan Wing c dt 04032022.pdf12 Mar 2022
Copy of Layout Approval (in case of layout)File: 4 Approved Plan Wing c dt 04032022.pdf12 Mar 2022
Copy of Layout Approval (in case of layout)File: 5Approved Plan Wing D dt 04032022.pdf12 Mar 2022
Copy of Layout Approval (in case of layout)File: 6 Approved Plan Wing D dt 04032022.pdf12 Mar 2022
Commencement Certificates / NA Order for plotted developmentFile: Revised Commencement Certificate 4 Mar 2022_compressed.pdf12 Mar 2022
Certificates of CA (Form 3)File: FINAL JBD RERA Certificate March 2020.pdf5 Oct 2020
Certificates of CA (Form 3)File: RERA DEC 19 JAI BHAWANI.pdf4 Mar 2020
Certificates of CA (Form 3)File: JUNE RERA JBOILLP Certificate COMPRESSED.pdf25 Nov 2019
Certificates of CA (Form 3)File: SEPT RERA of JBOILLP Certificate.pdf25 Nov 2019
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: jai bhawani orchid infra llp_reduce.pdf22 Nov 2019
Certificates of CA (Form 3)File: VIVANTA_CERT_March 2019-compressed.pdf12 Jul 2019
Certificates of CA (Form 3)File: VIVANTA_CERT-compressed.pdf11 Feb 2019
Certificates of CA (Form 3)File: jai bhawani rera mar 18 cert.pdf28 Jan 2019
Certificates of CA (Form 3)File: jai bhawani rera June 18 cert.pdf28 Jan 2019
Certificates of CA (Form 3)File: Jaibhawani Rera Sept 2018.pdf28 Jan 2019
Certificates of CA (Form 5)File: Form 5 Jai Bhawani Infra LLP.pdf17 Jan 2019
Certificates of CA (Form 3)File: FORM 3 CA Certificate.pdf10 Jan 2018
Layout approvalFile: VIVANTA'S BLISS CC-ilovepdf-compressed (1).pdf29 Dec 2017
Layout approvalFile: VIVANTA S BLISS CC 1.pdf29 Dec 2017
Layout approvalFile: VIVANTA'S BLISS CC 2.pdf29 Dec 2017
Layout approvalFile: VIVANTA'S BLISS CC 3.pdf29 Dec 2017
Layout approvalFile: VIVANTA'S BLISS CC 4.pdf29 Dec 2017
Layout approvalFile: VIVANTA'S BLISS CC 5.pdf29 Dec 2017
Layout approvalFile: VIVANTA'S BLISS CC 6.pdf29 Dec 2017
Layout approvalFile: VIVANTA'S BLISS CC 7.pdf29 Dec 2017
Details of encumbrancesFile: Scan Declaration of encumbrances.pdf29 Dec 2017
Copy of Layout Approval (in case of layout)File: VIVANTA'S BLISS CC-ilovepdf-compressed (1).pdf29 Dec 2017
Copy of Layout Approval (in case of layout)File: VIVANTA S BLISS CC 1.pdf29 Dec 2017
Copy of Layout Approval (in case of layout)File: VIVANTA'S BLISS CC 2.pdf29 Dec 2017
Copy of Layout Approval (in case of layout)File: VIVANTA'S BLISS CC 3.pdf29 Dec 2017
Copy of Layout Approval (in case of layout)File: VIVANTA'S BLISS CC 4.pdf29 Dec 2017
Copy of Layout Approval (in case of layout)File: VIVANTA'S BLISS CC 5.pdf29 Dec 2017
Copy of Layout Approval (in case of layout)File: VIVANTA'S BLISS CC 6.pdf29 Dec 2017
Copy of Layout Approval (in case of layout)File: VIVANTA'S BLISS CC 7.pdf29 Dec 2017
Commencement Certificates / NA Order for plotted developmentFile: VIVANTA'S BLISS CC-ilovepdf-compressed (1).pdf29 Dec 2017
Declaration in FORM BFile: Form B Promoter Compressed.pdf29 Dec 2017
Declaration in FORM BFile: Land Owner compressed.pdf29 Dec 2017
Proforma of Allotment letterFile: Scan Declaration of Agreement for Sale.pdf29 Dec 2017
Proforma of Allotment letterFile: Scan Declaration of Allottment Letter.pdf29 Dec 2017
Building plan approvalFile: VIVANTA S BLISS CC 1.pdf28 Dec 2017
Building plan approvalFile: VIVANTA'S BLISS CC 2.pdf28 Dec 2017
Building plan approvalFile: VIVANTA'S BLISS CC 3.pdf28 Dec 2017
Building plan approvalFile: VIVANTA'S BLISS CC 4.pdf28 Dec 2017
Building plan approvalFile: VIVANTA'S BLISS CC 5.pdf28 Dec 2017
Building plan approvalFile: VIVANTA'S BLISS CC 6.pdf28 Dec 2017
Building plan approvalFile: VIVANTA'S BLISS CC 7.pdf28 Dec 2017
PAN CardFile: Scan PAN Jai Bhavani.pdf28 Dec 2017
Copy of the legal title reportFile: title clearance certificate-min.pdf28 Dec 2017
Building Plan Approval (IOD)File: VIVANTA S BLISS CC 1.pdf28 Dec 2017

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
VIVANTA BLISSVillage Kalher Bihwandi132CompletedJun 2023Sep 2022

How this compares with Thane

24%of Thane projects moved their completion datethis one moved by 12 months
23%of Thane registrations have lapsed or been cancelledthis one is among them

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep VIVANTA S BLISS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KALHER7,600+ in Thane

2 kmVIVANTA S BLISSCompleted 1Lapsed / revoked 5Other 22Dot size: filed unitsN

Filed coordinates, straight-line distance. 28 registered projects within 2 km.

Builder: JAI BHAWANI ORCHID INFRA LLP

JAI BHAWANI ORCHID INFRA LLP has 4 registrations on MahaRERA, including VIVANTA S BLISS and Olivia Bliss. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What does it mean that VIVANTA S BLISS shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if VIVANTA S BLISS is delayed beyond 30 Jun 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VIVANTA S BLISS?

The registered promoter entity is JAI BHAWANI ORCHID INFRA LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VIVANTA S BLISS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for VIVANTA S BLISS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VIVANTA S BLISS?

The professionals named in the filing: Architect: SHRI SUDHIR THORAT. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VIVANTA S BLISS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VIVANTA S BLISS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VIVANTA S BLISS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.