Home / Browse projects / Thane, Maharashtra / Vivanta Phase - I

Completed No litigation declared Residential / Group Housing project

Vivanta Phase - I

By Riddhish Realtors LLP

RG-MH-34559 · RERA P51700047140 · Last updated on MahaRERA portal: 18 Jul 2025

Source: official MahaRERA filing

Red flags

  • Completion date moved by 60 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2029Possession promisedregistration recorded completed
27 of 44Construction stages doneacross 4 buildings; furthest along: Slabs of Super Structure, 10%
0Complaints at MahaRERAon this registration
Jump to the 82 documents Report an error

Vivanta Phase - I is a Residential / Group Housing project by Riddhish Realtors LLP in Thane, Maharashtra, registered with MahaRERA as P51700047140 on 10 Oct 2022. The registration is recorded completed; possession was promised by 31 Dec 2029. The completion date has moved by 60 months from the original filing.

At a glance

Project

  • NameVivanta Phase - I
  • TypeResidential / Group Housing
  • Location
    • Javsai Gaon Road
    • Javsai
    • Ambarnath(M Cl)
    • Ambarnath
    • Thane
    • 421501
  • Pincode421501
  • RERA no.P51700047140
  • ReraGenie IDRG-MH-34559

Builder

  • NameRiddhish Realtors LLP
  • Entity typePartnership
  • PartnersRaju Thakurdas Jaisinghani, Mukesh Thakurdas Jaisinghani, Rahul Jaisinghani

Key dates

this monthRegisteredOct 2022First promiseDec 2024Revised toDec 2029Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on10 Oct 2022
  • Promised completion31 Dec 2029
  • Revised completionRevised to 31 Dec 2029 (originally 31 Dec 2024)
  • Buildings4 building records
  • Documents filed82 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Hill Crest - Type III/1NA80000
Alpha - Type II/1NA80000
Asta - Type II/2NA80000
Vista - Type I/1NA80000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 18 Jul 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

27 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Slabs of Super Structure, at 10%.

Hill Crest - Type III/182%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Alpha - Type II/137%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure10%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Asta - Type II/237%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure10%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Vista - Type I/191%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 18 Jul 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes70%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes50%
Electrical meter room, sub-station, receiving stationYes70%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed180

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots180
Closed/Covered180
BuildingClosed/CoveredTotal
Hill Crest - Type III/14040
Alpha - Type II/14040
Asta - Type II/24040
Vista - Type I/16060

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,896 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
Mahashiv Developers LLPKalyan-Dombivali (M Corp.)Thane
Savita Vasant TambeAmbarnath(M Cl)Thane

Approvals and building plan

Permissible FSI5600.1
Proposed, not sanctioned5,600 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchAmit Apartment, Near Anil Cinema, Kalyan Ambernath Road, Ulhasnagar 421003

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectThorat Mathew & Associates
EngineerVinayak Chopdekar & Associates
Chartered AccountantR. G. Pinjani & Associates
PartnerRole in project
Riddhish Realtors LLP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700028237Dec 2024 → Dec 2029

Reason as filed by the promoterSir, We are the developers of the proposed real estate project and hereby apply for seeking extension of the registration of project under RERA Act. The project consists of 4 wings out of which we have completed 2 wings and obtained OC for same within the validity of registration. However, out of 80 units in the completed wings only 2 units have been sold and no bookings could be done in balance wings (yet to be constructed). We think this may be due to remote location of the project and will take some more time before buyer’s inter-est picks up for this location. However, we have already comp

Litigation declared1

CaseCourtStatus
SPL 142/2017Civil Court KalyanPending

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 20 Sep 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 20 Sep 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 1 Sep 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 1 Sep 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 8 Feb 2025

Documents filed82

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 82 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Proforma of Agreement for saleFile: Vivanta P-1 AfS.pdf18 Jul 2025
Disclosure of sold/ booked inventoryFile: FY 2324 Q1.pdf17 Apr 2025
Disclosure of sold/ booked inventoryFile: FY 2324 Q2.pdf17 Apr 2025
Disclosure of sold/ booked inventoryFile: FY 2324 Q3.pdf17 Apr 2025
Disclosure of sold/ booked inventoryFile: FY 2324 Q4.pdf17 Apr 2025
Disclosure of sold/ booked inventoryFile: FY 2425 Q1.pdf17 Apr 2025
Disclosure of sold/ booked inventoryFile: FY 2425 Q2.pdf17 Apr 2025
Disclosure of sold/ booked inventoryFile: FY 2425 Q3.pdf17 Apr 2025
Disclosure of sold/ booked inventoryFile: FY 2425 Q4.pdf17 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate FY 23-24 Q1.pdf14 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate FY 23-24 Q2.pdf14 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate FY 23-24 Q4.pdf14 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate FY 24-25 Q1.pdf14 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate FY 24-25 Q2.pdf14 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate FY 24-25 Q3.pdf14 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineer certificate fy 2324 q2.pdf14 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineer certificate fy 2324 q3.pdf14 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineer certificate fy 2324 q4.pdf14 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineer certificate fy 2425 q1.pdf14 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineer certificate fy2425 q2.pdf14 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineer certificate fy 2425 q3.pdf14 Apr 2025
Declaration in FORM BFile: Affidavid Mearg R J and S T.pdf2 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 June 24.pdf2 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Sept 24.pdf2 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Dec 24.pdf2 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Mar 24.pdf2 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold 24-25 Q1.pdf2 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold 24-25 Q2.pdf2 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold 24-25 Q3.pdf2 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold 24-25 Q4.pdf2 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold 23-24 Q1.pdf2 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold 23-24 Q2.pdf2 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold 23-24 Q3.pdf2 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold 23-24 Q4.pdf2 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 2A 22-23.pdf2 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 2A 23-24.pdf2 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 2023-24.pdf2 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Vivanta Architect 31122023.pdf8 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Vivanta Engineer 31122023 2.pdf8 Feb 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Part OC Type1.pdf8 Feb 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: H-Occupation Certificate 3-1 Full OC.pdf8 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: LETTER OF RIDHISH FY 22 23 Form5.pdf8 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 202212_Ar.pdf28 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 202212_Er.pdf28 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 202212_Ar.pdf28 Feb 2023
Disclosure of sold/ booked inventoryFile: 202212_Sold.pdf28 Feb 2023
CERSAI detailsFile: 202212_CERSAI.pdf28 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 202212_CA.pdf28 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 11_CA_New_2.pdf27 Sep 2022
Layout approvalFile: 4_001_New-1.pdf20 Sep 2022
Layout approvalFile: 4_1.pdf20 Sep 2022
Layout approvalFile: 4_2.pdf20 Sep 2022
Layout approvalFile: 4_3.pdf20 Sep 2022
Layout approvalFile: 4_4.pdf20 Sep 2022
Layout approvalFile: 4_5.pdf20 Sep 2022
Layout approvalFile: 4_6.pdf20 Sep 2022
Layout approvalFile: 4_7.pdf20 Sep 2022
Copy of the legal title reportFile: 2_Title Certificate.pdf20 Sep 2022
Copy of the legal title reportFile: 2A_Search.pdf20 Sep 2022
Copy of Layout Approval (in case of layout)File: 4_001_New-1.pdf20 Sep 2022
Copy of Layout Approval (in case of layout)File: 4_1.pdf20 Sep 2022
Copy of Layout Approval (in case of layout)File: 4_2.pdf20 Sep 2022
Copy of Layout Approval (in case of layout)File: 4_3.pdf20 Sep 2022
Copy of Layout Approval (in case of layout)File: 4_4.pdf20 Sep 2022
Copy of Layout Approval (in case of layout)File: 4_5.pdf20 Sep 2022
Copy of Layout Approval (in case of layout)File: 4_6.pdf20 Sep 2022
Copy of Layout Approval (in case of layout)File: 4_7.pdf20 Sep 2022
Other - TechnicalFile: 18_Technical.pdf20 Sep 2022
Building plan approvalFile: 5_IoA.pdf1 Sep 2022
PAN CardFile: 1 Riddish Developers PAN Card.pdf1 Sep 2022
Details of encumbrances concerned to FinanceFile: 3_No Encumbrance.pdf1 Sep 2022
Details of encumbrances concerned to LegalFile: 3A_Legal Encumbrance Declaration.pdf1 Sep 2022
Building Plan Approval / NA Order for plotted developmentFile: 5_IoA.pdf1 Sep 2022
Commencement Certificates / NA Order for plotted developmentFile: 6_CC.pdf1 Sep 2022
Declaration about Commencement CertificateFile: 7_CC Declaration.pdf1 Sep 2022
Declaration in FORM BFile: 8_RIDHISH FORM B.pdf1 Sep 2022
CERSAI detailsFile: 12_CERSAI.pdf1 Sep 2022
Proforma of Allotment letterFile: 13_Allotment Letter.pdf1 Sep 2022
Proforma of Allotment letterFile: 14_Sale Agreement.pdf1 Sep 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 17_Bank Declaration_1.pdf1 Sep 2022

How this compares with Thane

24%of Thane projects moved their completion datethis one moved by 60 months
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Vivanta Phase - I on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Javsai7,600+ in Thane

Builder: Riddhish Realtors LLP

Riddhish Realtors LLP has 1 registration on MahaRERA, including Vivanta Phase - I. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Vivanta Phase - I is delayed beyond 31 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Vivanta Phase - I?

The registered promoter entity is Riddhish Realtors LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Vivanta Phase - I?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Vivanta Phase - I?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Vivanta Phase - I?

The professionals named in the filing: Architect: Thorat Mathew & Associates; Engineer: Vinayak Chopdekar & Associates; Chartered Accountant: R. G. Pinjani & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Vivanta Phase - I?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Vivanta Phase - I. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Vivanta Phase - I to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.