Home / Browse projects / Thane, Maharashtra / Vivanta Bliss Phase II

Registered No litigation declared Residential / Group Housing project

Vivanta Bliss Phase II

By JAI BHAWANI ORCHID INFRA LLP

RG-MH-18502 · RERA P51700076999 · Last updated on MahaRERA portal: 2 Jul 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 3 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
9 of 22Construction stages doneacross 2 buildings; furthest along: Internal walls, 95%
68 of 89Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 67 documents Report an error

Vivanta Bliss Phase II is a Residential / Group Housing project by JAI BHAWANI ORCHID INFRA LLP in Thane, Maharashtra, registered with MahaRERA as P51700076999 on 16 Jul 2024. Possession is promised by 31 Dec 2028. 21 of the 89 units on this registration are recorded sold or booked, and 9 of 22 construction stages are filed complete.

At a glance

Project

  • NameVivanta Bliss Phase II
  • TypeResidential / Group Housing
  • Location
    • Vivantas Bliss Chaturvedi Marg
    • Jai Mata Di Compound Kalher
    • Kalher (CT)
    • Bhiwandi
    • Thane
    • 421302
  • Pincode421302
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700076999
  • ReraGenie IDRG-MH-18502

Builder

  • NameJAI BHAWANI ORCHID INFRA LLP
  • Entity typePartnership
  • PartnersMAHESH JAGAN SALVI, VINOD BALARAM SALVI, JIGNESH MAGANLAL GADA, AJITKUMAR MADANRAJ CHOPDA, SATISH KIRANRAJ PUNAMIYA, CHIRAG SHAMJI GADA
  • Other registrations3 more →
  • Completed1 of 4
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

this monthRegisteredJul 2024PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on16 Jul 2024
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings2 building records
  • Documents filed67 files

Current status

24%21 of 89 units booked
33.1%Work done, per cost certificate

Figures as on 2 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Vivanta Bliss Phase II Building No 3 Wing ENA8749049
Vivanta Bliss Phase II Building No 4 Wing FNA6540040

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 2 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 95%.

Vivanta Bliss Phase II Building No 3 Wing E56%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises25%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.30%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.30%
Vivanta Bliss Phase II Building No 4 Wing F65%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises60%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks85%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.75%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 2 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed30

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots30
Closed/Covered30
BuildingClosed/CoveredTotal
Vivanta Bliss Phase II Building No 3 Wing E1616
Vivanta Bliss Phase II Building No 4 Wing F1414

Land and ownership12

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,730 sq m
Land owned byThe promoter, with other names on the file
Named landowners12
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on2 Jun 2025
LandownerVillageDistrict
Mr Bhagwan Bhiva MhatreKalher (CT)Thane
Mr Rajaram Bhiva MhatreKalher (CT)Thane
Mr Sitaram Bhiva MhatreKalher (CT)Thane
Smt Taibai Ramkrishna MhatreKalher (CT)Thane
Mr Janardan Ramkrishna MhatreKalher (CT)Thane
Mr Gorakhnath Ramkrishna MhatreKalher (CT)Thane
Mr Arun Ramkrishna MhatreKalher (CT)Thane
Mr Dipak Ramkrishna MhatreKalher (CT)Thane
Mr Machhindra Ramkrishna MhatreKalher (CT)Thane
Mr Sachin Ramkrishna MhatreKalher (CT)Thane
Mr Raju Rambhau GajmalThane (M Corp.)Thane
Mr Ramniklal Jethalal ShahKalher (CT)Thane

Approvals and building plan

Sanctioning authorityMumbai Metropolitan Region Development Authority
Permissible FSI5114.49
Proposed, not sanctioned5,114 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKalwa Branch, Creek View Apartment, 1st Floor, Bombay Pune Road, Kalwa, Thane - 400 605
Estimated costRs 13.68 cr
Cost incurredRs 4.53 cr
Work done33.12%
BuildingWingEstimatedIncurred
Vivanta Bliss Phase II Building No 4 Wing FNARs 7.80 crRs 4.01 cr
Vivanta Bliss Phase II Building No 3 Wing ENARs 5.20 crRs 52.00 lakh
-NARs 68.33 lakh-

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMr. Atul Anil Gharat
EngineerBahubali Dhamane
EngineerNitin Patil
Chartered AccountantCA Pratik D Jain
Chartered AccountantRSPH & Associates
PartnerRole in project
JAI BHAWANI ORCHID INFRA LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 22 Jun 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 5 Jul 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 8 Jun 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 10 Jul 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed67

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Form 2A - March 26 - Vivanta .pdf2 Jul 2026
Withdrawal Update Form 1File: Architecte certificate Dec 2025.pdf28 Feb 2026
Withdrawal Update Form 2File: Engineer certificate Dec 2025.pdf28 Feb 2026
Withdrawal Update Form 3File: Ca Certificate EF Dec 2025 final.pdf28 Feb 2026
Withdrawal Update Form 1File: AR - sept 25.pdf16 Jan 2026
Withdrawal Update Form 2File: ER - sept 25.pdf16 Jan 2026
Withdrawal Update Form 3File: CA - sept 25.pdf16 Jan 2026
Form 5 (FY 2024-2025)File: RA Report - 2024-25.pdf9 Dec 2025
Withdrawal Update Form 1File: vihanta phase 02, from 01.pdf4 Oct 2025
Withdrawal Update Form 2File: vivanta bliss engineer certificate.pdf4 Oct 2025
Withdrawal Update Form 3File: CA june 25 final (3).pdf4 Oct 2025
Form 1File: AR certificate.pdf5 Jun 2025
Form 2File: ER - SEP 24.pdf5 Jun 2025
Form 3File: Final CA Certificate.pdf5 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure 01 jan.pdf5 Jun 2025
Self-declaration of Quarterly ProgressFile: AR certificate.pdf5 Jun 2025
Form 1File: AR certificate dec24 phase2-min.pdf5 Jun 2025
Form 2File: ER - DEC 24.pdf5 Jun 2025
Form 3File: Final CA certificate.pdf5 Jun 2025
Disclosure of Sold and Booked InventoryFile: disclosure of sold wing E and F.pdf5 Jun 2025
Self-declaration of Quarterly ProgressFile: AR certificate dec24 phase2-min.pdf5 Jun 2025
Form 1File: AR certificate march 25 Phase 2-min.pdf5 Jun 2025
Form 2File: ER - March 25.pdf5 Jun 2025
Form 3File: Final CA.pdf5 Jun 2025
Disclosure of Sold and Booked InventoryFile: sold unsold Q4 25-min.pdf5 Jun 2025
Self-declaration of Quarterly ProgressFile: AR certificate march 25 Phase 2-min.pdf5 Jun 2025
Form 2A (FY 2024-2025)File: Jai Bhavani Vivanta II Form 2A.pdf5 Jun 2025
Disclosure of sold/ booked inventoryFile: disclosure of sold wing E and F.pdf4 Mar 2025
Disclosure of sold/ booked inventoryFile: Disclosure 01 jan.pdf14 Feb 2025
Commencement Certificates / NA Order for plotted developmentFile: CC Confirmation sent by Corporation to RERA.pdf10 Jul 2024
Layout approvalFile: VIVANTAS BLISS PHASE II-9.pdf5 Jul 2024
Copy of Layout Approval (in case of layout)File: VIVANTAS BLISS PHASE II-9.pdf5 Jul 2024
Copy of the legal title reportFile: Jai Bhavani orchid infra.pdf22 Jun 2024
Other - LegalFile: Development-5406.pdf22 Jun 2024
Other - LegalFile: 5407.pdf22 Jun 2024
Other - LegalFile: Development-5408.pdf22 Jun 2024
Other - LegalFile: 5409.pdf22 Jun 2024
Layout approvalFile: 5 Plan 1.pdf8 Jun 2024
Building plan approvalFile: 5 Plan 2.pdf8 Jun 2024
Building plan approvalFile: 5 Plan 3.pdf8 Jun 2024
PAN CardFile: 1 Company PAN Card.pdf8 Jun 2024
Details of encumbrances concerned to FinanceFile: 3 EC-Finance.pdf8 Jun 2024
Details of encumbrances concerned to FinanceFile: 4 EC-Legal.pdf8 Jun 2024
Details of encumbrances concerned to LegalFile: 3 EC-Finance.pdf8 Jun 2024
Details of encumbrances concerned to LegalFile: 4 EC-Legal.pdf8 Jun 2024
Copy of Layout Approval (in case of layout)File: 5 Plan 1.pdf8 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: 5 Plan 2.pdf8 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: 5 Plan 3.pdf8 Jun 2024
Commencement Certificates / NA Order for plotted developmentFile: 6 Commencement Certificate.pdf8 Jun 2024
Declaration about Commencement CertificateFile: 7 FORM-D.pdf8 Jun 2024
Declaration in FORM BFile: 8 Developer Form B.pdf8 Jun 2024
CERSAI detailsFile: 9 Nil CERSAI Declaration.pdf8 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 10 CA Cert vivanta Bliss P II.pdf8 Jun 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 11 Disclosure of Interest in other Real Estate Organization.pdf8 Jun 2024
Proforma of Allotment letterFile: 13 Allotment letter.pdf8 Jun 2024
Proforma of Agreement for saleFile: 12 Agreement for sale- Jai Bhavani Orchid Infra Final.pdf8 Jun 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 14 Separate Bank Account Declaration.pdf8 Jun 2024
Deviation Report with respect to Allotment letterFile: 15 Deviation of Allotment letter.pdf8 Jun 2024
Deviation Report with respect to model copy of AgreementFile: 16 Deviation For AFS.pdf8 Jun 2024
Other - LegalFile: 1 MHATRE 3-5676-2021 Development Agreement.pdf8 Jun 2024
Other - LegalFile: 2 MHATRE 3-5677-2021 POA.pdf8 Jun 2024
Other - LegalFile: 17 LLP Partnersheep Deed.pdf8 Jun 2024
Other - LegalFile: Seven and Twelve Extracts.pdf8 Jun 2024
Other - LegalFile: Declaration of One Plot one Reg.pdf8 Jun 2024
Other - LegalFile: Clarification Letter.pdf8 Jun 2024
Other - TechnicalFile: Declaration of One Plot one Reg.pdf8 Jun 2024
Other - TechnicalFile: Clarification Letter.pdf8 Jun 2024

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
VIVANTA BLISSVillage Kalher Bihwandi132CompletedJun 2023Sep 2022

How this compares with Thane

24%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Vivanta Bliss Phase II on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Jai Mata Di Compound Kalher7,600+ in Thane

2 kmVivanta Bliss Phase IICompleted 1Lapsed / revoked 6Other 21Dot size: filed unitsN

Filed coordinates, straight-line distance. 28 registered projects within 2 km.

Builder: JAI BHAWANI ORCHID INFRA LLP

JAI BHAWANI ORCHID INFRA LLP has 4 registrations on MahaRERA, including VIVANTA S BLISS and Olivia Bliss. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Vivanta Bliss Phase II is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Vivanta Bliss Phase II?

The registered promoter entity is JAI BHAWANI ORCHID INFRA LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Vivanta Bliss Phase II?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Vivanta Bliss Phase II?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Vivanta Bliss Phase II?

The professionals named in the filing: Architect: Mr. Atul Anil Gharat; Engineer: Bahubali Dhamane; Engineer: Nitin Patil; Chartered Accountant: CA Pratik D Jain; Chartered Accountant: RSPH & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Vivanta Bliss Phase II?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Vivanta Bliss Phase II. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Vivanta Bliss Phase II to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.