ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / VITTHAL RUKMINI TOWER

Registration lapsed No litigation declared Others project

VITTHAL RUKMINI TOWER

By BALARAM VITTHAL MALI

RG-MH-81716 · RERA P51700016732 · Last updated on MahaRERA portal: 17 Apr 2024

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 19 months past the filed date
  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Mar 2025Possession promised19 months past this date
3 of 11Construction stages donefurthest along: Slabs of Super Structure, 98%
0Complaints at MahaRERAon this registration
Jump to the 103 documents Report an error

VITTHAL RUKMINI TOWER is a Others project by BALARAM VITTHAL MALI in Thane, Maharashtra, registered with MahaRERA as P51700016732 on 12 Jun 2018. Possession was promised by 29 Mar 2025 and is now 19 months past that date. The completion date has moved by 12 months from the original filing.

At a glance

Project

  • NameVITTHAL RUKMINI TOWER
  • TypeOthers
  • Location
    • MANKOLI
    • Bhiwandi
    • Thane
    • 421302
  • Pincode421302
  • RERA no.P51700016732
  • ReraGenie IDRG-MH-81716

Builder

  • NameBALARAM VITTHAL MALI
  • Entity typeIndividual

Key dates

19 months past promisethis monthRegisteredJun 2018First promiseMar 2024Revised toMar 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on12 Jun 2018
  • Promised completion29 Mar 2025
  • Revised completionRevised to 29 Mar 2025 (originally 30 Mar 2024)
  • Buildings1 building record
  • Documents filed103 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
VITTHAL RUKMINI TOWERNA50000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 17 Apr 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 98%.

VITTHAL RUKMINI TOWER: 75% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure98%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises92%
Sanitary Fittings within the flats / premises85%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.91%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.69%

Progress on shared amenities15

As on 17 Apr 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes80%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes75%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes75%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes50%
Energy managemcntYes0%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes75%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes75%

Parking filed4

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots4
Open Space4

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,000 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI914.57
Proposed, not sanctioned879 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMANKKOLI

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMADHUSUDAN C MYAKAL
EngineerMADHUSUDAM C MYALAK
Chartered AccountantMUKESH SONI & ASSOCIATES
PartnerRole in project
BALARAM VITTHAL MALI-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700019453Mar 2024 → Mar 2025

Reason as filed by the promoterDUE TO REVISE IN FSI THEREFORE WE REQUIRE EXTENSION IN PROPOSED COMPLETION DATE.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 8 Jun 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 8 Jun 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 8 Jun 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 Jun 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed103

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 103 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Details of encumbrances concerned to FinanceFile: 1 Details of encumbrances.pdf17 Apr 2024
Details of encumbrances concerned to LegalFile: 1 Details of encumbrances.pdf17 Apr 2024
Proforma of Agreement for saleFile: DRAFT AGREEMNET FOR SALE.pdf17 Apr 2024
Deviation Report with respect to Allotment letterFile: DEVIATION FROM ALLOTMENT.pdf17 Apr 2024
Deviation Report with respect to model copy of AgreementFile: DEVIATION FROM AGREEMNET.pdf17 Apr 2024
Declaration in FORM BFile: FORM B - PROJECT EXTENSION.pdf4 Apr 2024
PAN CardFile: B V MALI PAN.pdf29 Mar 2024
Declaration about Commencement CertificateFile: DECLARATION OF CC - BV MALI_page-0001.pdf29 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 DEC 18.pdf29 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 DEC 19.pdf29 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3 FORM 1 DEC 20.pdf29 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 4 FORM 1 DEC 21.pdf29 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 5 FORM 1 DEC 22.pdf29 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 6 FORM 1 DEC 23.pdf29 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 7 FORM 1 JUNE 18.pdf29 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 8 FORM 1 JUNE 19.pdf29 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 9 FORM 1 JUNE 20.pdf29 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 10 FORM 1 JUNE 21.pdf29 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 11 FORM 1 JUNE 22.pdf29 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 12 FORM 1 JUNE 23.pdf29 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 13 FORM 1 MARCH 19.pdf29 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 14 FORM 1 MARCH 20.pdf29 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 15 FORM 1 MARCH 21.pdf29 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 16 FORM 1 MARCH 22.pdf29 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 17 FORM 1 MARCH 23.pdf29 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 18 FORM 1 SEPT 18.pdf29 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 19 FORM 1 SEPT 19.pdf29 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 20 FORM 1 SEPT 20.pdf29 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 21 FORM 1 SEPT 21.pdf29 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 22 FORM 1 SEPT 22.pdf29 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 23 FORM 1 SEPT 23.pdf29 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 24 FORM 1 TILL DATE 26 03 24.pdf29 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1 FORM 2 DEC 18.pdf29 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 FORM 2 DEC 19.pdf29 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3 FORM 2 DEC 20.pdf29 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 4 FORM 2 DEC 21.pdf29 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 5 FORM 2 DEC 22.pdf29 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 6 FORM 2 DEC 23.pdf29 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 7 FORM 2 JUNE 18.pdf29 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 8 FORM 2 JUNE 19.pdf29 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 9 FORM 2 JUNE 20.pdf29 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 10 FORM 2 JUNE 21.pdf29 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 11 FORM 2 JUNE 22.pdf29 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 12 FORM 2 JUNE 23.pdf29 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 13 FORM 2 MARCH 19.pdf29 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 14 FORM 2 MARCH 20.pdf29 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 15 FORM 2 MARCH 21.pdf29 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 16 FORM 2 MARCH 22.pdf29 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 17 FORM 2 MARCH 23.pdf29 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 18 FORM 2 SEPT 18.pdf29 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 19 FORM 2 SEPT 19.pdf29 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 20 FORM 2 SEPT 20.pdf29 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 21 FORM 2 SEPT 21.pdf29 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 22 FORM 2 SEPT 22.pdf29 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 23 FORM 2 SEPT 23.pdf29 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 24 FORM 2 TILL DATE 26 03 24.pdf29 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 1 form 2a 2019.pdf29 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 2 FROM 2A 2020.pdf29 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 3 FROM 2A 2021.pdf29 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 4 FROM 2A 2022.pdf29 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 5 FORM 2A 2023.pdf29 Mar 2024
CERSAI detailsFile: CERSAI DECLARATION - BV MALI_page-0001.pdf29 Mar 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE FOR SOLD UNSOLD BV MALI_page-0001.pdf29 Mar 2024
Certificates of CA (Form 3)File: 1 FORM 3 JUNE 18.pdf29 Mar 2024
Certificates of CA (Form 3)File: 2 FORM 3 SEPT 18.pdf29 Mar 2024
Certificates of CA (Form 3)File: 3 FORM 3 DEC 18.pdf29 Mar 2024
Certificates of CA (Form 3)File: 5 FORM 3 JUNE 19.pdf29 Mar 2024
Certificates of CA (Form 3)File: 6 FORM 3 SEPT 19.pdf29 Mar 2024
Certificates of CA (Form 3)File: 7 FORM 3 DEC 19.pdf29 Mar 2024
Certificates of CA (Form 3)File: 8 FORM 3 MARCH 20.pdf29 Mar 2024
Certificates of CA (Form 3)File: 9 FORM 3 JUNE 20.pdf29 Mar 2024
Certificates of CA (Form 3)File: 10 FORM 3 SEPT 20.pdf29 Mar 2024
Certificates of CA (Form 3)File: 11 FORM 3 DEC 2020.pdf29 Mar 2024
Certificates of CA (Form 3)File: 12 FORM 3 MARCH 21.pdf29 Mar 2024
Certificates of CA (Form 3)File: 13 FORM 3 JUNE 21.pdf29 Mar 2024
Certificates of CA (Form 3)File: 14 FORM 3 SEPT 21.pdf29 Mar 2024
Certificates of CA (Form 3)File: 15 FORM 3 DEC 21.pdf29 Mar 2024
Certificates of CA (Form 3)File: 16 FORM 3 MARCH 22.pdf29 Mar 2024
Certificates of CA (Form 3)File: 17 FORM 3 JUNE 22.pdf29 Mar 2024
Certificates of CA (Form 3)File: 18 FORM 3 SEPT 22.pdf29 Mar 2024

How this compares with Thane

24%of Thane projects moved their completion datethis one moved by 12 months
23%of Thane registrations have lapsed or been cancelledthis one is among them

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep VITTHAL RUKMINI TOWER on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MANKOLI7,600+ in Thane

Builder: BALARAM VITTHAL MALI

BALARAM VITTHAL MALI has 1 registration on MahaRERA, including VITTHAL RUKMINI TOWER. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What does it mean that VITTHAL RUKMINI TOWER shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if VITTHAL RUKMINI TOWER is delayed beyond 29 Mar 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VITTHAL RUKMINI TOWER?

The registered promoter entity is BALARAM VITTHAL MALI, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VITTHAL RUKMINI TOWER?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for VITTHAL RUKMINI TOWER?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VITTHAL RUKMINI TOWER?

The professionals named in the filing: Architect: MADHUSUDAN C MYAKAL; Engineer: MADHUSUDAM C MYALAK; Chartered Accountant: MUKESH SONI & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VITTHAL RUKMINI TOWER?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VITTHAL RUKMINI TOWER. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VITTHAL RUKMINI TOWER to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.