Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
2 of 11Construction stages donefurthest along: Basement (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 37 documents Report an error

VITHOBA NIWAS is a Others project by SHRI TIRUPATI REALTY in Thane, Maharashtra, registered with MahaRERA as P51700078563 on 27 Dec 2024. Possession is promised by 31 Dec 2027.

At a glance

Project

  • NameVITHOBA NIWAS
  • TypeOthers
  • Location
    • BHADWAD
    • BHIWANDI
    • Bhiwandi (M Corp.)
    • Thane
    • 421302
  • Pincode421302
  • RERA no.P51700078563
  • ReraGenie IDRG-MH-23255

Builder

  • NameSHRI TIRUPATI REALTY
  • Entity typePartnership
  • PartnerBHADRACHALAM RAJESHAM ADEP
  • Other registrations1 more →
  • Completed1 of 2

Key dates

this monthRegisteredDec 2024PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on27 Dec 2024
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed37 files

Current status

20.0%Work done, per cost certificate

Figures as on 29 Sep 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
VITHOBA NIWASNA50000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 29 Sep 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.

VITHOBA NIWAS: 18% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 29 Sep 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed58

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots58
Open Space58

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,000 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on29 May 2025
LandownerVillageDistrict
ROHIDAS MARUTI MHATREBhiwandi (M Corp.)Thane

Approvals and building plan

Sanctioning authorityB N M C
Permissible FSI1452.07
Proposed, not sanctioned1,452 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchAshok Nagar, Kalyan Road, Bhiwandi
Estimated costRs 2.98 cr
Cost incurredRs 59.50 lakh
Work done19.96%
BuildingWingEstimatedIncurred
VITHOBA NIWASNARs 2.65 crRs 59.50 lakh
-NARs 32.90 lakh-

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSUPREME CONSULTANT
EngineerSUPREME CONSULTANT
Chartered AccountantM M ARSIWALA AND ASSOCIATES
Chartered AccountantFARIDA ATTARI & ASSOCIATES
PartnerRole in project
SHRI TIRUPATI REALTY-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 4 Dec 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 13 Mar 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 13 Mar 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 28 Nov 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed37

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1.pdf29 Sep 2025
Withdrawal Update Form 2File: Form 2.pdf29 Sep 2025
Withdrawal Update Form 3File: FORM 3 30-06-2025.pdf29 Sep 2025
Form 5 (FY 2024-2025)File: FORM 5 31-03-2025 Vithoba.pdf3 Jun 2025
Form 1File: Architect certificate .pdf29 May 2025
Form 2File: Engineer certificate 02.pdf29 May 2025
Form 3File: CA_certificate VITHOBA NIWAS.pdf29 May 2025
Form 1File: ARCHITECT CERTIFICATE LETTER.pdf29 May 2025
Form 2File: FORM 2 ENGINEER CERTIFICATE.pdf29 May 2025
Form 3File: FORM 3 31-03-2025.pdf29 May 2025
Form 2A (FY 2024-2025)File: FROM 2A QAC_2024-2025.pdf29 May 2025
Other - LegalFile: 1234.pdf17 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA_certificate VITHOBA NIWAS.pdf9 Dec 2024
Copy of the legal title reportFile: Titile _ Search Report_compressed.pdf4 Dec 2024
Commencement Certificates / NA Order for plotted developmentFile: C C Confirmnation.pdf28 Nov 2024
Commencement Certificates / NA Order for plotted developmentFile: Plinth Certificate.pdf28 Nov 2024
Other - LegalFile: ANNEXURE A_compressed.pdf27 May 2024
Declaration in FORM BFile: DocScanner 18 Mar 2024 11-32 am_compressed.pdf19 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate _page-0001.pdf19 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Architect certificate _page-0003.pdf19 Mar 2024
Building plan approvalFile: Layout Plan.pdf13 Mar 2024
Layout approvalFile: Layout Plan.pdf13 Mar 2024
PAN CardFile: Shri_Tirupati_Realty_Pan_Card.pdf13 Mar 2024
Details of encumbrances concerned to FinanceFile: Declaration for Encrubance.pdf13 Mar 2024
Copy of Layout Approval (in case of layout)File: Layout Plan.pdf13 Mar 2024
Proforma of Allotment letterFile: ANNEXURE 1 Allotment Letter new.pdf13 Mar 2024
Commencement Certificates / NA Order for plotted developmentFile: Permission copy_compressed.pdf13 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: Layout Plan.pdf13 Mar 2024
Declaration about Commencement CertificateFile: Declaration for CC.pdf13 Mar 2024
CERSAI detailsFile: CERSAI.pdf13 Mar 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration for Seperate Account.pdf13 Mar 2024
Deviation Report with respect to Allotment letterFile: Declaration for Devaition.pdf13 Mar 2024
Details of encumbrances concerned to LegalFile: Declaration for Encrubance.pdf13 Mar 2024
Deviation Report with respect to model copy of AgreementFile: Declaration for Devaition.pdf13 Mar 2024
Proforma of Agreement for saleFile: Final-Rera-Draft-2024-Vithoba2.pdf13 Mar 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Declaration for Other Business 1.pdf13 Mar 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Declaration for Other Business.pdf13 Mar 2024

How this compares with Thane

24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep VITHOBA NIWAS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BHIWANDI7,600+ in Thane

Builder: SHRI TIRUPATI REALTY

SHRI TIRUPATI REALTY has 2 registrations on MahaRERA, including TIRUPATI HIEGHTS and VITHOBA NIWAS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if VITHOBA NIWAS is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VITHOBA NIWAS?

The registered promoter entity is SHRI TIRUPATI REALTY, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VITHOBA NIWAS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for VITHOBA NIWAS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VITHOBA NIWAS?

The professionals named in the filing: Architect: SUPREME CONSULTANT; Engineer: SUPREME CONSULTANT; Chartered Accountant: M M ARSIWALA AND ASSOCIATES; Chartered Accountant: FARIDA ATTARI & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VITHOBA NIWAS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VITHOBA NIWAS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VITHOBA NIWAS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.