Vithoba Anand

By Anand Developers

RG-MH-04977 · RERA P52100021063 · Last updated on MahaRERA portal: 10 Dec 2024

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 10 months past the filed date
  • Completion date moved by 36 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2025Possession promised10 months past this date
23 of 33Construction stages doneacross 3 buildings; furthest along: Basement (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 85 documents Report an error

Vithoba Anand is a Others project by Anand Developers in Pune, Maharashtra, registered with MahaRERA as P52100021063 on 31 May 2019. Possession was promised by 31 Dec 2025 and is now 10 months past that date. The completion date has moved by 36 months from the original filing.

At a glance

Project

  • NameVithoba Anand
  • TypeOthers
  • Location
    • NANA PETH
    • PUNE
    • Pune (M Corp.)
    • Pune City
    • 411002
  • Pincode411002
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100021063
  • ReraGenie IDRG-MH-04977

Builder

  • NameAnand Developers
  • Entity typePartnership
  • PartnersSubhash Suganlal Runwal, Sangeeta Vikas Lalwani, Murlidhar Keru Satav
  • Other registrations10 more →
  • Completed6 of 11
  • No longer live3 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

10 months past promisethis monthRegisteredMay 2019First promiseDec 2022Revised toDec 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on31 May 2019
  • Promised completion31 Dec 2025
  • Revised completionRevised to 31 Dec 2025 (originally 30 Dec 2022)
  • Buildings3 building records
  • Documents filed85 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ANA180000
BNA90000
CNA90000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 10 Dec 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

23 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Basement (if any), at 0%.

A100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
B9%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
C100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 10 Dec 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes66%
Street LightingYes66%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes100%

Parking filed45

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots45
Closed/Covered37
Open Space8
BuildingClosed/CoveredOpen SpaceTotal
A36036
B101
C088

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,935 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI15739.84
Proposed, not sanctioned9,903 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchM-4, Virmal Plaza, 11 East Street, Pune-411001

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectS M ASSOCIATES
Chartered AccountantVINOD S TOSHNIWAL AND ASSOCIATES
PartnerRole in project
Anand Developers-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100018804Dec 2022 → Dec 2025

Reason as filed by the promoterDue to B - Building revised sanction file was pending for sanction with PMC department. We have completed Building - A and Building - C and we have received completion certificate from PMC department for Building - A and Building - C before the expiry date of RERA certificate. We have not sold any unit in proposed building - B

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 19 Jan 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 10 Dec 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 10 Dec 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 10 Dec 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 8 Jan 2024

Documents filed85

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 85 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Layout approvalFile: HPSC0929.pdf10 Dec 2024
Layout approvalFile: HPSC0931.pdf10 Dec 2024
Layout approvalFile: HPSC0932.pdf10 Dec 2024
Layout approvalFile: HPSC0933.pdf10 Dec 2024
Building plan approvalFile: HPSC0930.pdf10 Dec 2024
Copy of Layout Approval (in case of layout)File: HPSC0929.pdf10 Dec 2024
Copy of Layout Approval (in case of layout)File: HPSC0931.pdf10 Dec 2024
Copy of Layout Approval (in case of layout)File: HPSC0932.pdf10 Dec 2024
Copy of Layout Approval (in case of layout)File: HPSC0933.pdf10 Dec 2024
Commencement Certificates / NA Order for plotted developmentFile: Revised CC.pdf10 Dec 2024
Building Plan Approval (IOD)File: HPSC0930.pdf10 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 FY 23-24.pdf10 Dec 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD BOOKED INVENTORY.pdf26 Feb 2024
Declaration in FORM BFile: Revised Form_B.pdf24 Feb 2024
Building plan approvalFile: Revised Plan 1.pdf8 Jan 2024
Layout approvalFile: Revised Plan 2.pdf8 Jan 2024
Layout approvalFile: Revised Plan 3.pdf8 Jan 2024
Layout approvalFile: Revised Plan 4.pdf8 Jan 2024
Layout approvalFile: Revised Plan 5.pdf8 Jan 2024
Layout approvalFile: Revised Plan 6.pdf8 Jan 2024
Layout approvalFile: Revised Plan 7.pdf8 Jan 2024
Layout approvalFile: Revised Plan 8.pdf8 Jan 2024
Layout approvalFile: Revised Plan 9.pdf8 Jan 2024
Layout approvalFile: Revised Plan 10.pdf8 Jan 2024
Copy of Layout Approval (in case of layout)File: Revised Plan 2.pdf8 Jan 2024
Copy of Layout Approval (in case of layout)File: Revised Plan 3.pdf8 Jan 2024
Copy of Layout Approval (in case of layout)File: Revised Plan 4.pdf8 Jan 2024
Copy of Layout Approval (in case of layout)File: Revised Plan 5.pdf8 Jan 2024
Copy of Layout Approval (in case of layout)File: Revised Plan 6.pdf8 Jan 2024
Copy of Layout Approval (in case of layout)File: Revised Plan 7.pdf8 Jan 2024
Copy of Layout Approval (in case of layout)File: Revised Plan 8.pdf8 Jan 2024
Copy of Layout Approval (in case of layout)File: Revised Plan 9.pdf8 Jan 2024
Copy of Layout Approval (in case of layout)File: Revised Plan 10.pdf8 Jan 2024
Building Plan Approval (IOD)File: Revised Plan 1.pdf8 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: Reviced CC.pdf8 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5-Annual Report on Statement of Accounts.pdf8 Jan 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: A- Building Occupancy Certificate Residential.pdf8 Jan 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: A- Building Occupancy Certificate Commercial.pdf8 Jan 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: C - Building Occupancy Certificate Commercial.pdf8 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Engineers Certificate on Quality 2023.pdf27 Dec 2023
Proforma of Agreement for saleFile: Draft Agreement.pdf27 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 21-22.pdf29 May 2023
Details of encumbrances concerned to FinanceFile: Details of encumbrances concerned to Legal.pdf17 May 2023
Details of encumbrances concerned to LegalFile: Details of encumbrances concerned to Legal.pdf17 May 2023
Declaration about Commencement CertificateFile: Declaration about Commencement Certificate.pdf17 May 2023
CERSAI detailsFile: CERSAI details.pdf17 May 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in Other Real Estate Organizations.pdf17 May 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration.pdf17 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 for Anand Developers.pdf9 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A FY 2021-22.pdf9 May 2023
Proforma of Allotment letterFile: Allotment Letter.pdf9 May 2023
Deviation Report with respect to Allotment letterFile: allotment letter deviation.pdf9 May 2023
Deviation Report with respect to model copy of AgreementFile: agreement to sale deviation.pdf9 May 2023
Copy of the legal title reportFile: Legal Title Report Format A_11zon.pdf19 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Certificate form 2.pdf19 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: from 5 CA certificate 2021.pdf19 Jan 2023
Building plan approvalFile: Revised Plan IOD.pdf7 Jul 2021
Layout approvalFile: Revised Plan 4.pdf7 Jul 2021
Copy of Layout Approval (in case of layout)File: Revised Plan 4.pdf7 Jul 2021
Building Plan Approval (IOD)File: Revised Plan IOD.pdf7 Jul 2021
Commencement Certificates / NA Order for plotted developmentFile: Revised CC.pdf7 Jul 2021
Proforma of Allotment letterFile: Draft Agreement Revised.pdf5 Oct 2019
Building plan approvalFile: IOD.pdf15 May 2019
Layout approvalFile: Plan 1.pdf15 May 2019
Layout approvalFile: Plan 2.pdf15 May 2019
Layout approvalFile: Plan 3.pdf15 May 2019
Layout approvalFile: Plan 4.pdf15 May 2019
Layout approvalFile: Plan 5.pdf15 May 2019
Layout approvalFile: Plan 6.pdf15 May 2019
PAN CardFile: Pan Cards.pdf15 May 2019
Copy of the legal title reportFile: Search and Title.pdf15 May 2019
Details of encumbrancesFile: Declaration.pdf15 May 2019
Copy of Layout Approval (in case of layout)File: Plan 1.pdf15 May 2019
Copy of Layout Approval (in case of layout)File: Plan 2.pdf15 May 2019
Copy of Layout Approval (in case of layout)File: Plan 3.pdf15 May 2019
Copy of Layout Approval (in case of layout)File: Plan 4.pdf15 May 2019
Copy of Layout Approval (in case of layout)File: Plan 5.pdf15 May 2019
Copy of Layout Approval (in case of layout)File: Plan 6.pdf15 May 2019
Building Plan Approval (IOD)File: IOD.pdf15 May 2019
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf15 May 2019

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 36 months
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Vithoba Anand on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PUNE13,700+ in Pune

2 kmVithoba AnandCompleted 170Lapsed / revoked 136Other 130Dot size: filed unitsN

Filed coordinates, straight-line distance. 436 registered projects within 2 km.

Builder: Anand Developers

ANAND DEVELOPERS has 11 registrations on MahaRERA, including AADITYA HEIGHTS and GREEN COUNTY. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that Vithoba Anand shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Vithoba Anand is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Vithoba Anand?

The registered promoter entity is Anand Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Vithoba Anand?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Vithoba Anand?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Vithoba Anand?

The professionals named in the filing: Architect: S M ASSOCIATES; Chartered Accountant: VINOD S TOSHNIWAL AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Vithoba Anand?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Vithoba Anand. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Vithoba Anand to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.