Home / Browse projects / Pune, Maharashtra / NAVI TULSIBAUG
NAVI TULSIBAUG
RG-MH-20670 · RERA P52100007354 · Last updated on MahaRERA portal: 12 Feb 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 10 months past the filed date
- 4 complaints at MahaRERA
- Completion date moved by 24 months
- 2 extensions taken
- Rs 20.00 crore secured on the land, in favour of Aditya Birla Finance Limited
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
- All 1 earlier projects delivered on promise
6 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
NAVI TULSIBAUG is a Commercial project by MATOSHRI ESTATE PVT LTD in Pune, Maharashtra, registered with MahaRERA as P52100007354 on 17 Aug 2017. Possession was promised by 25 Dec 2025 and is now 10 months past that date. The completion date has moved by 24 months from the original filing. 200 of the 320 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete. 4 complaints are on record with the regulator.
At a glance
Project
- NameNAVI TULSIBAUG
- TypeCommercial
- Location
- Budhwar Peth
- Pune (M Corp.)
- Pune City
- Pune
- 411002
- Pincode411002
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100007354
- ReraGenie IDRG-MH-20670
Builder
- NameMATOSHRI ESTATE PVT LTD
- Entity typeCompany
- Managing DirectorDEEPAK VASANT MARNE
- Declared earlier projects1 →
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on17 Aug 2017
- Promised completion25 Dec 2025
- Revised completionRevised to 25 Dec 2025 (originally 30 Dec 2023)
- Buildings1 building record
- Documents filed123 files
Current status
Figures as on 12 Feb 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| MARNE PLAZA | NA | 10 | 8 | 82 | 238 | 320 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 12 Feb 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
6 of 11 construction stages are filed complete. The stage furthest along is External plumbing and external plaster, at 80%.
MARNE PLAZA: 72% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 50% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 80% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 65% |
Progress on shared amenities15
As on 12 Feb 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 80% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 55% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 55% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 55% |
| Electrical meter room, sub-station, receiving station | Yes | 10% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed647
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership7
MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
| Landowner | Village | District |
|---|---|---|
| SHALINI MARNE | Pune (M Corp.) | Pune |
| SANDEEP MARNE | Pune (M Corp.) | Pune |
| SACHIN MARNE | Pune (M Corp.) | Pune |
| SANGEETA KATE | Pune (M Corp.) | Pune |
| CHAITNYA SHARMA | Pune (M Corp.) | Pune |
| AMIT SHARMA | Pune (M Corp.) | Pune |
| RAJARAM GHODAKE | Pune (M Corp.) | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| MARNE PLAZA | NA | Rs 66 | Rs 58 |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | R S Associates |
| Architect | CUBIX ARCHITECTS ASSOCIATES |
| Engineer | Dinesh Chaudhari |
| Chartered Accountant | Surana Jain and Co |
| Chartered Accountant | PULKIT PORWAL |
| Partner | Role in project |
|---|---|
| MATOSHRI ESTATE PVT LTD | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterDue to Covid, the project got delayed, Hereby we request you to grant extention of one year.
Reason as filed by the promoter1.Project is 70% completed 2.Consent of 63.33 % of Allotees uploaded for Extension 3.Explanatory Note for Delay in project Completion Uploaded in Other Tab No. 1 4.PERT Chart for the remaining completion work is uploaded in Other Tab No. 2 5.Revised Form B uploaded in Other tab No. 3 and in main Application 6.QPR till dates are updated 7.Due to unavoidable circumstances project has been delay and it will be completed by 25/12/2025
Complaints filed with MahaRERA4
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC005000000054014 | Amit Sharma | Matoshree Eststes Pvt Ltd | 06/02/2020 |
| CC005000000085503 | M/S. Maple Developments A Partnership firm Through its Partner, Shri. Sachin Ashok Agarwal | M/s. Matoshree Estates Pvt Ltd Thr its Director/s a) Deepak Marne b) Aarti Marne c) Radhika Birla | 28/04/2021 |
| CC005000000085690 | Mr. Yogesh Vasantrao Nankar | M/s Matoshri Estate Pvt Ltd Thr its Directors a) Mr. Deepak Marne b) Aarti Marne c) Radhika Birla | 18/06/2021 |
| CC005000000085689 | Mrs. Pramila Medhekar | M/s. Matoshri Estate Pvt Ltd Thr its Directors a) Mr. Deepak Marne b) Aarti Marne c) Radhika Birla | 18/06/2021 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 31 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 31 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 22 Dec 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 22 Dec 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed123
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 123 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1.pdf | 12 Feb 2026 |
| Withdrawal Update Form 1File: Form 1.pdf | 12 Feb 2026 |
| Withdrawal Update Form 1File: Form 1.pdf | 12 Feb 2026 |
| Withdrawal Update Form 1File: Form 1.pdf | 12 Feb 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 12 Feb 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 12 Feb 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 12 Feb 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 12 Feb 2026 |
| Withdrawal Update Form 3File: Form 3.pdf | 12 Feb 2026 |
| Withdrawal Update Form 3File: Form 3.pdf | 12 Feb 2026 |
| Withdrawal Update Form 3File: Form 3.pdf | 12 Feb 2026 |
| Withdrawal Update Form 3File: Form 3.pdf | 12 Feb 2026 |
| Withdrawal Update Form 1File: Form 1.pdf | 11 Feb 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 11 Feb 2026 |
| Withdrawal Update Form 3File: Form 3.pdf | 11 Feb 2026 |
| Other - TechnicalFile: PERT Chart - ok.pdf | 8 Mar 2025 |
| Declaration in FORM BFile: Form B - Final.pdf | 7 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: 5 Sold Unsold Navi Tulsi Bag - Dec 23.pdf | 7 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: 9 Sold Unsold Navi Tulsi Bag - Dec 24.pdf | 7 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: 8 Sold Unsold Navi Tulsi Bag - Sept 24.pdf | 7 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: 7 Sold Unsold Navi Tulsi Bag - June 24.pdf | 7 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: 6 Sold Unsold Navi Tulsi Bag - March 24.pdf | 7 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: 4 Sold Unsold Navi Tulsi Bag - Sept 23.pdf | 7 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: 3 Sold Unsold Navi Tulsi Bag - June 23.pdf | 7 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: 2 Sold Unsold Navi Tulsi Bag - March 23.pdf | 7 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: 1 Sold Unsold Navi Tulsi Bag - Dec 22.pdf | 7 Mar 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Navi tulsi Baug Form 5 2022-23.pdf | 7 Mar 2025 |
| Certificates of CA (Form 3)File: 1 Navi Tulsi Baug RERA Form 3 - 31 12 22.pdf | 6 Mar 2025 |
| Certificates of CA (Form 3)File: 2 Navi Tulsi Baug RERA Form 3 - 31 03 23.pdf | 6 Mar 2025 |
| Certificates of CA (Form 3)File: 3 Navi Tulsi Baug RERA Form 3 - 30 06 23.pdf | 6 Mar 2025 |
| Certificates of CA (Form 3)File: 4 Navi Tulsi Baug RERA Form 3 - 30 09 23.pdf | 6 Mar 2025 |
| Certificates of CA (Form 3)File: 5 Navi Tulsi Baug RERA Form 3 - 31 12 23.pdf | 6 Mar 2025 |
| Certificates of CA (Form 3)File: 6 Navi Tulsi Baug RERA Form 3 - 31 03 24.pdf | 6 Mar 2025 |
| Certificates of CA (Form 3)File: 7 Navi Tulsi Baug RERA Form 3 - 30 06 24.pdf | 6 Mar 2025 |
| Certificates of CA (Form 3)File: 8 Navi Tulsi baug RERA Form 3 - 30 09 24.pdf | 6 Mar 2025 |
| Certificates of CA (Form 3)File: 9 Navi Tulsi Baug RERA Form 3 - 31 12 24.pdf | 6 Mar 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 7 Navi Tulsi Baug Form 2 - 30 06 24.pdf | 6 Mar 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 9 Navi Tulsi Baug Form 2 - 31 12 24.pdf | 6 Mar 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 8 Navi Tulsi Baug Form 2 - 30 09 24.pdf | 6 Mar 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 6 Navi Tulsi Baug Form 2 - 31 03 24.pdf | 6 Mar 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 4 Navi Tulsi Baug Form 2 - 30 09 23.pdf | 6 Mar 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 3 Navi Tulsi Baug Form 2 - 30 06 23.pdf | 6 Mar 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2 Form 2 - 31 03 23.pdf | 6 Mar 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 1 Form 2 - 31 12 22.pdf | 6 Mar 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 5 Navi Tulsi Baug Form 2 - 31 12 23.pdf | 6 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Navi Tulsi Baug Form 2A - 2023-24.pdf | 6 Mar 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Navi Tulsi Baug FORM 5 - 2023-24.pdf | 6 Mar 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 1 Form 1 - 31 12 23.pdf | 5 Mar 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 2 Form 1 - 31 03 24.pdf | 5 Mar 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 3 Form 1 - 30 06 24.pdf | 5 Mar 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 4 Form 1 - 30 09 24.pdf | 5 Mar 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 5 Form 1 - 31 12 24.pdf | 5 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A -SEP.pdf | 1 Feb 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2A -SEP.pdf | 29 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: Sold new.pdf | 29 Jan 2024 |
| Certificates of CA (Form 3)File: Form 3.pdf | 29 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 New.pdf | 29 Jan 2024 |
| Declaration in FORM BFile: Form B.pdf | 5 Jan 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: MAR Form 1.pdf | 5 Jan 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Jun Form 1.pdf | 5 Jan 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Sep Form 1.pdf | 5 Jan 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2A MAR.pdf | 5 Jan 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2A -SEP.pdf | 5 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A JUN.pdf | 5 Jan 2024 |
| Building plan approvalFile: BP 1-6.pdf | 22 Dec 2022 |
| Building plan approvalFile: BP 2-6.pdf | 22 Dec 2022 |
| Building plan approvalFile: BP 3-6.pdf | 22 Dec 2022 |
| Building plan approvalFile: BP 4-6.pdf | 22 Dec 2022 |
| Building plan approvalFile: BP 5-6.pdf | 22 Dec 2022 |
| Building plan approvalFile: BP 6-6.pdf | 22 Dec 2022 |
| Building Plan Approval (IOD)File: BP 1-6.pdf | 22 Dec 2022 |
| Building Plan Approval (IOD)File: BP 2-6.pdf | 22 Dec 2022 |
| Building Plan Approval (IOD)File: BP 3-6.pdf | 22 Dec 2022 |
| Building Plan Approval (IOD)File: BP 4-6.pdf | 22 Dec 2022 |
| Building Plan Approval (IOD)File: BP 5-6.pdf | 22 Dec 2022 |
| Building Plan Approval (IOD)File: BP 6-6.pdf | 22 Dec 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: CC .pdf | 22 Dec 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf | 22 Dec 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: final f5 2017-18.pdf | 22 Dec 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: final f5 2018-19.pdf | 22 Dec 2022 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| MARNE HEIGHTS | CTS 1102 1110 1111 BUDHWAR PETH PUNE | 63 | Completed | Jul 2020 | Jul 2020 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 6 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 123 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep NAVI TULSIBAUG on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Budhwar Peth13,700+ in Pune
Filed coordinates, straight-line distance. 259 registered projects within 2 km.
Shankeshawar Gold Palace
BPO Uprise Lifestyle
24k Aurum Centre
Dreamnest Developers
Shree Kuber Business Hub
Shree Realty
DHANLAXMI MARKET
DHANLAXMI INFRA
PEHLWAN PRATAP SINGH PLAZA
MODERN GROUP
Siddhi Icon
Bhairav S P Associates
Builder: MATOSHRI ESTATE PVT LTD
MATOSHRI ESTATE PVT LTD has 1 registration on MahaRERA, including NAVI TULSIBAUG. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What does it mean that NAVI TULSIBAUG shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if NAVI TULSIBAUG is delayed beyond 25 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of NAVI TULSIBAUG?
The registered promoter entity is MATOSHRI ESTATE PVT LTD, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in NAVI TULSIBAUG?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against NAVI TULSIBAUG?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for NAVI TULSIBAUG?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at NAVI TULSIBAUG?
The professionals named in the filing: Architect: R S Associates; Architect: CUBIX ARCHITECTS ASSOCIATES; Engineer: Dinesh Chaudhari; Chartered Accountant: Surana Jain and Co; Chartered Accountant: PULKIT PORWAL. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in NAVI TULSIBAUG?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback