ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / Shankeshawar Gold Palace

Registered No litigation declared Others project

Shankeshawar Gold Palace

By BPO Uprise Lifestyle

RG-MH-31773 · RERA P52100080108 · Last updated on MahaRERA portal: 20 Jul 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 24 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Apr 2030Possession promisedmoved 24 months from the original
0 of 22Construction stages doneacross 2 buildings; furthest along: Excavation, 60%
169 of 171Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 59 documents Report an error

Shankeshawar Gold Palace is a Others project by BPO Uprise Lifestyle in Pune, Maharashtra, registered with MahaRERA as P52100080108 on 29 Apr 2025. Possession is promised by 30 Apr 2030. The completion date has moved by 24 months from the original filing. 2 of the 171 units on this registration are recorded sold or booked, and 0 of 22 construction stages are filed complete.

At a glance

Project

  • NameShankeshawar Gold Palace
  • TypeOthers
  • Location
    • C.S. No 904+905+906+907+908/1+908/2
    • Raviwar Peth
    • Raviwar Peth
    • Pune
    • Pune (M Corp.)
    • Pune City
    • Pune
    • 411002
  • Pincode411002
  • RERA no.P52100080108
  • ReraGenie IDRG-MH-31773

Builder

  • NameBPO Uprise Lifestyle
  • Entity typePartnership

Key dates

this monthRegisteredApr 2025First promiseApr 2028Revised toApr 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on29 Apr 2025
  • Promised completion30 Apr 2030
  • Revised completionRevised to 30 Apr 2030 (originally 30 Apr 2028)
  • Buildings2 building records
  • Documents filed59 files

Current status

1%2 of 171 units booked
2.1%Work done, per cost certificate

Figures as on 20 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing - ANA5528890
Wing - BNA66503181

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 20 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Excavation, at 60%.

Wing - A5%
ActivityProgress
Excavation60%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Wing - B5%
ActivityProgress
Excavation60%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 20 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed19

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots19
Closed/Covered19
BuildingClosed/CoveredTotal
Wing - A1010
Wing - B99

Land and ownership7

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area854 sq m
Land owned byThe promoter, with other names on the file
Named landowners7
LandownerVillageDistrict
Sonali Advait KharePune (M Corp.)Pune
Vivek Prabhakar SinnerkarPune (M Corp.)Pune
Tapan Vivek SinnerkarPune (M Corp.)Pune
Vinit Vivek SinnerkarPune (M Corp.)Pune
M/s. Jay Construction CompanyPune (M Corp.)Pune
Shobha Suresh BadkasPune (M Corp.)Pune
Trigun Vivek SinnerkarPune (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPune Municipal Authority
Permissible FSI5000.0
Proposed, not sanctioned2,518 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchTHE CITY JEWEL MALL BELOW BHAGGAT TARACHAND 709 NARAYAN LAXMI ROAD PUNE 411030
Estimated costRs 16.35 cr
Cost incurredRs 33.63 lakh
Work done2.06%
BuildingWingEstimatedIncurred
Wing - ANARs 7.77 crRs 16.82 lakh
Wing - BNARs 7.77 crRs 16.82 lakh
-NARs 81.74 lakh-

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectR. S. Associates
EngineerFarook Mulla & Associates
EngineerSK Consultants & Engineers
EngineerGN Infra Project
Chartered AccountantN B Sayed & Associates
PartnerRole in project
BPO Uprise Lifestyle-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA07052620867Apr 2028 → Apr 2030

Reason as filed by the promoterThe extension in the project completion timeline is necessitated due to circumstances beyond our control. The slowdown in work was primarily caused by intermittent labour shortages, temporary financial constraints, and delays in the supply of essential construction materials, which collectively affected the overall progress of the project. Necessary steps are being taken to stabilize resources and expedite the remaining work. In view of the above, we kindly request approval for extension of the project completion date until 30-04-2030

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 21 Apr 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 18 Apr 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 18 Apr 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 18 Apr 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Apr 2030

Documents filed59

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 - Shankeshwar Gold Palace as on June 2026.pdf20 Jul 2026
Withdrawal Update Form 2File: Form 2 - Shankeshwar Gold Palace as on June 2026.pdf20 Jul 2026
Withdrawal Update Form 3File: Form 3 - Shankeshwar Gold Palace as on June 2026.pdf20 Jul 2026
Form 2A (FY 2025-2026)File: Form 2A Shankeshwar Gold Palace For 2025-26.pdf15 Jun 2026
Withdrawal Update Form 1File: Form 1.pdf5 May 2026
Withdrawal Update Form 1File: Form 1.pdf5 May 2026
Withdrawal Update Form 1File: Form 1.pdf5 May 2026
Withdrawal Update Form 2File: FORM 2.pdf5 May 2026
Withdrawal Update Form 2File: FORM 2.pdf5 May 2026
Withdrawal Update Form 2File: FORM 2.pdf5 May 2026
Withdrawal Update Form 3File: Form 3.pdf5 May 2026
Withdrawal Update Form 3File: Form 3.pdf5 May 2026
Withdrawal Update Form 3File: Form 3.pdf5 May 2026
Form 1File: Form 1 - Shankeshwar Gold Palace as on March 2026.pdf20 Apr 2026
Form 2File: Form 2 - Shankeshwar Gold Palace as on March 2026.pdf20 Apr 2026
Form 3File: Form 3 - Shankeshwar Gold Palace as on March 2026.pdf20 Apr 2026
Disclosure of Sold and Booked InventoryFile: Circular 29 - Shankeshawar Gold Palace.pdf20 Apr 2026
Form 1File: Form 1 - Shankeshawar Gold Palace as on Dec 2025.pdf16 Feb 2026
Form 2File: Form 2 - Shankeshawar Gold Palace as on Dec 2025.pdf16 Feb 2026
Form 3File: Form 3 - Shankeshawar Gold Palace as on Dec 2025.pdf16 Feb 2026
Disclosure of Sold and Booked InventoryFile: Circular 29 - Shankeshawar Gold Palace as on Dec 2025.pdf16 Feb 2026
Copy of the legal title reportFile: Final Title BPO Revised.pdf21 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - CA Certificate_11zon (1).pdf19 Apr 2025
Disclosure for secured/unsecured finance availed for the projectFile: Disclosure of Secured and Unsecured Loan.pdf19 Apr 2025
Layout approvalFile: Layout Pg 1.pdf18 Apr 2025
Building plan approvalFile: Layout Pg 1.pdf18 Apr 2025
Building plan approvalFile: Layout Pg 2.pdf18 Apr 2025
Copy of Layout Approval (in case of layout)File: Layout Pg 1.pdf18 Apr 2025
Commencement Certificates / NA Order for plotted developmentFile: CC Verification Mail.pdf18 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: Layout Pg 1.pdf18 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: Layout Pg 2.pdf18 Apr 2025
Other - LegalFile: Sale Deed CTS 905_BPO.pdf18 Apr 2025
Other - FinanceFile: Declaration for Rehab Units.pdf18 Apr 2025
Other - FinanceFile: POA_19353_2024_908-2_Shobha Badkas_22to42.pdf18 Apr 2025
Other - FinanceFile: POA_19353_2024_908-2_Shobha Badkas_1to21.pdf18 Apr 2025
Other - FinanceFile: CTS No 908-1 POA _Jay Construction.pdf18 Apr 2025
Other - FinanceFile: POA_1623_2024_Vinay Sinnarkar and others.pdf18 Apr 2025
Other - FinanceFile: CTS 906 POA Doc No 3191-2024 Hvl 13_compressed_11zon.pdf18 Apr 2025
Other - FinanceFile: CTS No 904 POA-Jay Construction_45to88.pdf18 Apr 2025
Other - FinanceFile: CTS No 904 POA-Jay Constructin_1to44.pdf18 Apr 2025
Other - FinanceFile: Declaration for exemption of bank accounts.pdf18 Apr 2025
Other - TechnicalFile: Annexure A- Order 50.pdf18 Apr 2025
Other - TechnicalFile: CC Verification Mail.pdf18 Apr 2025
PAN CardFile: BPO PAN CARD.pdf15 Apr 2025
Details of encumbrances concerned to FinanceFile: Encumbrance Letter- Finance.pdf15 Apr 2025
Details of encumbrances concerned to FinanceFile: Encumbrance Letter- Legal.pdf15 Apr 2025
Proforma of Allotment letterFile: AL_Shankeshwar Gold Palace_Ms BPO UPRISE LIFESTYLE _10042025.pdf15 Apr 2025
Declaration in FORM BFile: Form B - Promoter.pdf15 Apr 2025
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf15 Apr 2025
Declaration about Commencement CertificateFile: Format D - Declaration of CC.pdf15 Apr 2025
CERSAI detailsFile: Declaration of Cersai.pdf15 Apr 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A - All RERA Designated Bank Accounts.pdf15 Apr 2025
Deviation Report with respect to Allotment letterFile: Deviation Report - Allotment.pdf15 Apr 2025
Details of encumbrances concerned to LegalFile: Encumbrance Letter- Finance.pdf15 Apr 2025
Details of encumbrances concerned to LegalFile: Encumbrance Letter- Legal.pdf15 Apr 2025
Deviation Report with respect to model copy of AgreementFile: Deviation Report - AFS_11zon.pdf15 Apr 2025
Proforma of Agreement for saleFile: AFS_Shankeshwar Gold Palace_Ms BPO UPRISE LIFESTYLE _10042025.pdf15 Apr 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A- Disclosure of Interest in other organisations_11zon.pdf15 Apr 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B- Declaration from the bank.pdf15 Apr 2025

How this compares with Pune

1%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 24 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Shankeshawar Gold Palace on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Raviwar Peth, Pune13,700+ in Pune

Builder: BPO Uprise Lifestyle

BPO Uprise Lifestyle has 1 registration on MahaRERA, including Shankeshawar Gold Palace. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Shankeshawar Gold Palace is delayed beyond 30 Apr 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Shankeshawar Gold Palace?

The registered promoter entity is BPO Uprise Lifestyle, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Shankeshawar Gold Palace?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Shankeshawar Gold Palace?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Shankeshawar Gold Palace?

The professionals named in the filing: Architect: R. S. Associates; Engineer: Farook Mulla & Associates; Engineer: SK Consultants & Engineers; Engineer: GN Infra Project; Chartered Accountant: N B Sayed & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Shankeshawar Gold Palace?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Shankeshawar Gold Palace. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Shankeshawar Gold Palace to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.