Registered No litigation declared Residential / Group Housing project

Vision New Ville

By SS VENTURES AOP

RG-MH-71721 · RERA P52100050454 · Last updated on MahaRERA portal: 11 Jul 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
1 of 11Construction stages donefurthest along: Basement (if any), 10%
52 of 109Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 158 documents Report an error

Vision New Ville is a Residential / Group Housing project by SS VENTURES AOP in Pune, Maharashtra, registered with MahaRERA as P52100050454 on 17 Apr 2023. Possession is promised by 31 Dec 2027. 57 of the 109 units on this registration are recorded sold or booked, and 1 of 11 construction stages are filed complete.

At a glance

Project

  • NameVision New Ville
  • TypeResidential / Group Housing
  • Location
    • 56/3/16(p) & 56(4)p
    • TATHWADE
    • Mulshi
    • Pune
    • 411033
  • Pincode411033
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100050454
  • ReraGenie IDRG-MH-71721

Builder

  • NameSS VENTURES AOP
  • Entity typeOthers
  • Named personsVision Venture, S.S Ventures
  • Other registrations1 more →
  • Past their filed date1

Key dates

this monthRegisteredApr 2023PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on17 Apr 2023
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed158 files

Current status

52%57 of 109 units booked
21.4%Work done, per cost certificate

Figures as on 11 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
C BuildingNA15151090109

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 11 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

1 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 10%.

C Building: 10% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)10%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 11 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed205

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots205
Closed/Covered205

Land and ownership7

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area5,894 sq m
Land owned byThe promoter, with other names on the file
Named landowners7
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on6 Aug 2025
LandownerVillageDistrict
LATE CHAMPALAL GULABCHAND VARMATathwadePune
LATE MURLIDHAR GULABCHAND VARMATathwadePune
AMARCHAND GULABCHAND VARMATathwadePune
JAWARHAR GULABCHAND VARMATathwadePune
PRALHAD GULABCHAND VARMATathwadePune
Rajeshkumar Naupatlal SaklaTathwadePune
Parag Kantilal SanchetiTathwadePune

Approvals and building plan

Sanctioning authorityPCMC
Permissible FSI16881.95
Proposed, not sanctioned10,734 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPimpri Chinchwad Pune
Estimated costRs 39.26 cr
Cost incurredRs 8.38 cr
Work done21.35%
BuildingWingEstimatedIncurred
C BuildingNARs 37.58 crRs 8.38 cr
-NARs 1.68 cr-

Certifying professionals and partners8

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAR Hrishikesh Kulkarni
EngineerSujit Desai
EngineerAjinkya Tanaji Kalbhor
EngineerBhushan S Jadhav
Chartered AccountantAnuj Agrawal
Chartered AccountantPatel & Sharma
Chartered AccountantAGARWAL SARAWGI AND ASSOCIATES
Chartered AccountantPatel and Sharma
PartnerRole in project
SS VENTURES AOP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 9 Mar 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 4 Sep 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 4 Sep 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 21 Jan 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed158

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 158 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Arch Cert.pdf11 Jul 2026
Withdrawal Update Form 2File: Form 2.pdf11 Jul 2026
Withdrawal Update Form 3File: Form 3 March 2026 Scan copy_Sign.pdf11 Jul 2026
Withdrawal Update Form 1File: Arch Cert.pdf6 Feb 2026
Withdrawal Update Form 2File: Engg Cert.pdf6 Feb 2026
Withdrawal Update Form 3File: Vision new ville form 3.pdf6 Feb 2026
Form 2A (FY 2024-2025)File: Form 2A FY 24-25 vision new ville.pdf6 Jan 2026
Form 5 (FY 2024-2025)File: FORM 5 Signed.pdf23 Dec 2025
Withdrawal Update Form 1File: Arch Cert 30-09-2025.pdf28 Nov 2025
Withdrawal Update Form 2File: Engg Cert 30-09-2025.pdf28 Nov 2025
Withdrawal Update Form 3File: Signed Form 3.pdf28 Nov 2025
Layout approvalFile: 00 layout Up_.pdf4 Sep 2025
Building plan approvalFile: 01 C basement_.pdf4 Sep 2025
Building plan approvalFile: 01 C Parking 1st.pdf4 Sep 2025
Building plan approvalFile: 02 C 2nd to 14 th Floor.pdf4 Sep 2025
Building plan approvalFile: 03 C Elevation_2_.pdf4 Sep 2025
Layout approvalFile: 00 layout Up_.pdf6 Aug 2025
Building plan approvalFile: 01 C basement_.pdf6 Aug 2025
Building plan approvalFile: 01 C Parking 1st.pdf6 Aug 2025
Building plan approvalFile: 02 C 2nd to 14 th Floor.pdf6 Aug 2025
Building plan approvalFile: 03 C Elevation_2_.pdf6 Aug 2025
Form 5 (FY 2023-2024)File: Form 05.pdf6 Aug 2025
Form 1File: Arch Cert.pdf21 Jul 2025
Form 2File: Engg Cert.pdf21 Jul 2025
Form 3File: Foem 03 Final Uploaded.pdf21 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold.pdf21 Jul 2025
Form 1File: 02 Jun 23.pdf12 Jul 2025
Form 2File: 02 Jun 23.pdf12 Jul 2025
Form 3File: 02 Jun 23.pdf12 Jul 2025
Disclosure of Sold and Booked InventoryFile: 01 jun 23.pdf12 Jul 2025
Form 1File: 03 Sept 23.pdf12 Jul 2025
Form 2File: 03 Sept 23.pdf12 Jul 2025
Form 3File: 03 Sept 23.pdf12 Jul 2025
Disclosure of Sold and Booked InventoryFile: 02 Sept 23.pdf12 Jul 2025
Form 1File: 04 Dec 23.pdf12 Jul 2025
Form 2File: 04 Dec 23.pdf12 Jul 2025
Form 3File: 04 Dec 23.pdf12 Jul 2025
Disclosure of Sold and Booked InventoryFile: 03 dec 23.pdf12 Jul 2025
Form 1File: 05 Mar 24.pdf12 Jul 2025
Form 2File: 04 Mar 24.pdf12 Jul 2025
Form 3File: 05 Mar 24.pdf12 Jul 2025
Disclosure of Sold and Booked InventoryFile: 04 mar 24.pdf12 Jul 2025
Form 1File: 06 Jun 24.pdf12 Jul 2025
Form 2File: 05 Jun 24.pdf12 Jul 2025
Form 3File: 06 Jun 24.pdf12 Jul 2025
Disclosure of Sold and Booked InventoryFile: 04 June 24.pdf12 Jul 2025
Form 1File: 07 Sept 24.pdf12 Jul 2025
Form 2File: 06 Sept 24.pdf12 Jul 2025
Form 3File: 07 Sept 24.pdf12 Jul 2025
Disclosure of Sold and Booked InventoryFile: 05 Sept 24.pdf12 Jul 2025
Form 1File: 08 Dec 24.pdf12 Jul 2025
Form 2File: 07 Dec 24.pdf12 Jul 2025
Form 3File: 08 Dec 24.pdf12 Jul 2025
Disclosure of Sold and Booked InventoryFile: 06 dec 24.pdf12 Jul 2025
Form 1File: 09 Mar 25.pdf12 Jul 2025
Form 2File: 08 Mar 25.pdf12 Jul 2025
Form 3File: 09 Mar 25.pdf12 Jul 2025
Disclosure of Sold and Booked InventoryFile: 07 Mar 25.pdf12 Jul 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: 2023-24 Form 5 ( R ).pdf16 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2024-25 Q2 - S S VENTURES AOP ( R ) - FORM 3 2.pdf16 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2024-25 Q1 - S S VENTURES AOP ( R ) - FORM 3 2.pdf16 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2024-25 Q2 - S S VENTURES AOP ( R ) - FORM 3 2.pdf16 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2024-25 Q2 - S S VENTURES AOP ( R ) - FORM 3 2.pdf16 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2024-25 Q1 - S S VENTURES AOP ( R ) - FORM 3 2.pdf16 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2024-25 Q2 - S S VENTURES AOP ( R ) - FORM 3 2.pdf16 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: 2023-24 Form 5 ( R ).pdf16 Nov 2024
Disclosure of sold/ booked inventoryFile: Dis of sold unsold_ june 2024_0001.pdf22 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM - 1 01-04-2024 TO 30-06-2024.pdf9 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 01-04-2024 TO 30-06-2024.pdf9 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Scanned Form 3 Mar 24_Signed_0001.pdf3 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 03 FORM - 03 Q1 01-04-2022 TO 30-06-2022.pdf3 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Cert 31-03-2024.pdf18 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Cert 31-03-2024.pdf18 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A - New Ville - Annually - 31-03-2024.pdf18 May 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Desclosure - New Ville.pdf18 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Cert - June 23.pdf1 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Cert - Sept 23.pdf1 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Cert - Dec 23.pdf1 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Cert 30th june 23.pdf1 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Cert 30th sept 23.pdf1 Mar 2024

How this compares with Pune

52%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Vision New Ville on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near TATHWADE13,700+ in Pune

2 kmVision New VilleCompleted 65Lapsed / revoked 35Other 127Dot size: filed unitsN

Filed coordinates, straight-line distance. 227 registered projects within 2 km.

Builder: SS VENTURES AOP

SS VENTURES AOP has 2 registrations on MahaRERA, including VISION ONE NEXT PHASE 1 and Vision New Ville. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Vision New Ville is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Vision New Ville?

The registered promoter entity is SS VENTURES AOP, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Vision New Ville?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Vision New Ville?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Vision New Ville?

The professionals named in the filing: Architect: AR Hrishikesh Kulkarni; Engineer: Sujit Desai; Engineer: Ajinkya Tanaji Kalbhor; Engineer: Bhushan S Jadhav; Chartered Accountant: Anuj Agrawal; Chartered Accountant: Patel & Sharma. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Vision New Ville?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Vision New Ville. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Vision New Ville to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.