Home / Browse projects / Pune, Maharashtra / Vision Harmony
Vision Harmony
By M/S Vista Vision Developers LLP
RG-MH-27424 · RERA P52100033418 · Last updated on MahaRERA portal: 3 Jun 2025
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Vision Harmony is a Residential / Group Housing project by M/S Vista Vision Developers LLP in Pune, Maharashtra, registered with MahaRERA as P52100033418 on 22 Feb 2022. The registration is recorded completed; possession was promised by 5 Jun 2025.
At a glance
Project
- NameVision Harmony
- TypeResidential / Group Housing
- Location
- Patwardhan Baug Near Saurabh Society
- Hingane (Bk) karvenagar
- Karve Nagar
- Haveli
- Pune
- 411052
- Pincode411052
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100033418
- ReraGenie IDRG-MH-27424
Builder
- NameM/S Vista Vision Developers LLP
- Entity typePartnership
- PartnerAkshaykumar Ramrao Rautrao
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on22 Feb 2022
- Promised completion5 Jun 2025
- Revised completionNone
- Buildings1 building record
- Documents filed68 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Vision Harmony | NA | 9 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 3 Jun 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
9 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.
Vision Harmony: 82% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 3 Jun 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed16
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Ar Sonal Rautrao Akshaykumar Rautrao |
| Engineer | Sachin Kumar Doshi S Doshi |
| Chartered Accountant | Shraddha Kshirsagar & Co |
| Partner | Role in project |
|---|---|
| M/S Vista Vision Developers LLP | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 5 Feb 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 5 Feb 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 19 Jul 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 19 Jul 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed68
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Occupational CertificateFile: 250603 Occupation Certificate .pdf | 3 Jun 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 250424 CA Certificate Form-03_.pdf | 25 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 250331 RERA- Architect Certificate Form-01.pdf | 5 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 250404 Engineer Certificate Form-02.pdf | 5 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 250108 Architect Certificate Form -01.pdf | 19 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 250116 CA Certificate Form-03.pdf | 19 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 250108 Engineer Certificate.pdf | 19 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: CA Certificate Form 5.pdf | 19 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 241014 CA Certificate.pdf | 17 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 240930 Architect Certificate.pdf | 15 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 240930 Engineer Certificate.pdf | 15 Oct 2024 |
| Building plan approvalFile: 240613-0188- 5th Sanctioned Commencement Certificate.pdf | 19 Jul 2024 |
| Building plan approvalFile: 240613-0188- 5th Sanctioned 1-2_compressed.pdf | 19 Jul 2024 |
| Building plan approvalFile: 240613-0188- 5th Sanctioned 2-2_compressed.pdf | 19 Jul 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 240613-0188- 5th Sanctioned Commencement Certificate.pdf | 19 Jul 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 240613-0188- 5th Sanctioned 1-2_compressed.pdf | 19 Jul 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 240613-0188- 5th Sanctioned 2-2_compressed.pdf | 19 Jul 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: 240613-0188- 5th Sanctioned Commencement Certificate.pdf | 19 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 240704 Architect Certificate Form 01_compressed.pdf | 19 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 240704 Engineer Certificate Form 02_compressed.pdf | 19 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 240716 CA Certificate Form3_compressed.pdf | 19 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 240404 Architect Certificate Form01.pdf | 8 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 240331 Engineer Certificate Form-02.pdf | 8 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 240408 RERA CA Certificate Form-3.pdf | 8 Apr 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Rera Certificate From-05 AY 2022-2023.pdf | 14 Mar 2024 |
| Building plan approvalFile: 1_compressed.pdf | 18 Jan 2024 |
| Building plan approvalFile: 2_compressed.pdf | 18 Jan 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 1_compressed.pdf | 18 Jan 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 2_compressed.pdf | 18 Jan 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: C C 2504_compressed.pdf | 18 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 231230 Architect Certificate_compressed.pdf | 18 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 231231 Engineer's Certificate_compressed.pdf | 18 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 240117 CA Certificate RERA_compressed.pdf | 18 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 230909 Architect Certificate Form-01.pdf | 2 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 230714 RERA Engineer Certificate.pdf | 2 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 230909 CA RERA Certificate Form-03.pdf | 2 Oct 2023 |
| Building plan approvalFile: 230104-0188-2nd Sanctioned 1-2_compressed.pdf | 2 Feb 2023 |
| Building plan approvalFile: 230104-0188-2nd Sanctioned 2-2_compressed.pdf | 2 Feb 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 230104-0188-2nd Sanctioned 1-2_compressed.pdf | 2 Feb 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 230104-0188-2nd Sanctioned 2-2_compressed.pdf | 2 Feb 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: 230104-0188-Commencement Certificate-2nd Sanction_compressed (1).pdf | 2 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 230119 Architect Certificate for RERA Form-01_compressed.pdf | 2 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 221231 Engineer Certificate Form-02 for RERA_compressed (1).pdf | 2 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 230127 CA Certificate for RERA Form-03_compressed.pdf | 2 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 221008 Architect Certificate for RERA_compressed.pdf | 15 Oct 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 221008 Engineer Certificate for RERA_compressed.pdf | 15 Oct 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 221013 CA Certificate for RERA_compressed.pdf | 15 Oct 2022 |
| Proforma of Allotment letterFile: Proforma Letter of Allottment.pdf | 15 Oct 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Form 1.pdf | 7 Jul 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Form 2.pdf | 7 Jul 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Form 3.pdf | 7 Jul 2022 |
| CERSAI detailsFile: Undertaking-CERSAI-Developer.pdf | 21 Feb 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA Certificate.pdf | 21 Feb 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Carpet Area Statement of Flat.pdf | 12 Feb 2022 |
| Proforma of Allotment letterFile: Proforma of the allotment letter.pdf | 12 Feb 2022 |
| Layout approvalFile: Sanctioned Copy- 1MB.pdf | 5 Feb 2022 |
| Building plan approvalFile: Sanctioned Copy- 1MB.pdf | 5 Feb 2022 |
| PAN CardFile: Pan Card Vista Vision LLP.pdf | 5 Feb 2022 |
| Copy of the legal title reportFile: 220203 Title Search Report_compressed.pdf | 5 Feb 2022 |
| Details of encumbrancesFile: Encumbrance Details Certificate - Developer-1 (1).pdf | 5 Feb 2022 |
| Copy of Layout Approval (in case of layout)File: Sanctioned Copy- 1MB.pdf | 5 Feb 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Sanctioned Copy- 1MB.pdf | 5 Feb 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: 0188-211217 Commencement Certificate_compressed.pdf | 5 Feb 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: NA Order Owner Copy.pdf | 5 Feb 2022 |
| Declaration about Commencement CertificateFile: Declaration About Cmmencement Certificate- Format-D by Developer.pdf | 5 Feb 2022 |
| Declaration in FORM BFile: Form B Declaration of Developer_compressed.pdf | 5 Feb 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate (2).pdf | 5 Feb 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA Engineer Certificate-Signed Copy_compressed.pdf | 5 Feb 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 68 filed documents as one ZIP, foldered, with a manifest
Keep Vision Harmony on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Hingane (Bk) karvenagar13,700+ in Pune
Filed coordinates, straight-line distance. 305 registered projects within 2 km.
LE SKYLARK
KAKADE GREEN ESTATES PRIVATE LIMITED
River Dale Residency
Maha Anand Pinnac Associates
Studio06
KARVENAGAR STUDIO LLP
1 GOLDLEAF
GOLDLEAF REALTORS
G M Mahika
G M DEVELOPERS
SIDDHIVINAYAK RESIDENCY
KELKAR PINNAC HOUSING LLP
Builder: M/S Vista Vision Developers LLP
M/S Vista Vision Developers LLP has 1 registration on MahaRERA, including Vision Harmony. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Vision Harmony is delayed beyond 5 Jun 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Vision Harmony?
The registered promoter entity is M/S Vista Vision Developers LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Vision Harmony?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Vision Harmony?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Vision Harmony?
The professionals named in the filing: Architect: Ar Sonal Rautrao Akshaykumar Rautrao; Engineer: Sachin Kumar Doshi S Doshi; Chartered Accountant: Shraddha Kshirsagar & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Vision Harmony?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback