ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / VISHWASANGAM

Registered No litigation declared Residential / Group Housing project

VISHWASANGAM

By Vishwashakti Cooperative Housing Society Limited

RG-MH-59226 · RERA P51800045980 · Last updated on MahaRERA portal: 30 Apr 2026

Source: official MahaRERA filing

Red flags

  • Rs 12.00 crore secured on the land, in favour of ADITYA BIRLA CAPITAL

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
4 of 11Construction stages donefurthest along: Slabs of Super Structure, 70%
62 of 111Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 66 documents Report an error

VISHWASANGAM is a Residential / Group Housing project by Vishwashakti Cooperative Housing Society Limited in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800045980 on 15 Jun 2022. Possession is promised by 31 Dec 2026. 49 of the 111 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameVISHWASANGAM
  • TypeResidential / Group Housing
  • Location
    • PESTOM SAGAR SCHEME ROAD NO 04
    • CHEMBUR
    • Greater Mumbai (M Corp.) (Part) (802794)
    • Mumbai
    • Mumbai Suburban
    • 400089
  • Pincode400089
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800045980
  • ReraGenie IDRG-MH-59226

Builder

  • NameVishwashakti Cooperative Housing Society Limited
  • Entity typeSociety
  • SecretorySUNIL HARILAL MOKHA

Key dates

this monthRegisteredJun 2022PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on15 Jun 2022
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed66 files

Current status

44%49 of 111 units booked
38.8%Work done, per cost certificate

Figures as on 30 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
VISHWASHAKTI AND PESTOM SAGAR CHSLNA18169912111

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 30 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 70%.

VISHWASHAKTI AND PESTOM SAGAR CHSL: 46% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure70%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises15%
Sanitary Fittings within the flats / premises10%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks5%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.10%

Progress on shared amenities15

As on 30 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes10%
Electrical meter room, sub-station, receiving stationYes10%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership2

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area1,505 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared present
Charge in favour ofADITYA BIRLA CAPITAL
Secured amountRs 12.00 crore
CERSAI search filedYes
Declared on18 Dec 2025
LandownerVillageDistrict
PESTOM SAGAR CO-OPERATIVE HOUSING SOCIETY LIMITEDGreater Mumbai (M Corp.) (Part) (802794)Mumbai Suburban
TRILOGY DEVELOPERS PRIVATE LIMITEDAndheriMumbai Suburban

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI8235.2
Proposed, not sanctioned3,501 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchFORT
Estimated costRs 24.00 cr
Cost incurredRs 9.30 cr
Work done38.75%
BuildingWingEstimatedIncurred
VISHWASHAKTI AND PESTOM SAGAR CHSLNARs 23.28 crRs 9.30 cr
-NARs 72.00 lakh-

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectREDKAR & REDKAR
EngineerACE PROJECT CONSULTANT
Chartered AccountantSPKG & CO LLP
PartnerRole in project
Vishwashakti Cooperative Housing Society Limited-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 1 Jun 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 1 Jun 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 1 Jun 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 May 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed66

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Architects Certificate.pdf30 Apr 2026
Withdrawal Update Form 2File: VS Form 2.pdf30 Apr 2026
Withdrawal Update Form 3File: Vishwashakti - Form 3 Certificate Q4 FY 25-26.pdf30 Apr 2026
Withdrawal Update Form 1File: Withdrawal Application Form1.pdf23 Feb 2026
Withdrawal Update Form 2File: Withdrawal Application Form2.pdf23 Feb 2026
Withdrawal Update Form 3File: SD_Final Vishwashakti - Form 3 Certificate Q3 FY 25-26.pdf23 Feb 2026
Form 1File: Architect's Certificate -5th october 2025.pdf28 Oct 2025
Form 2File: Engineering certificate form 2 dt 300925.pdf28 Oct 2025
Form 3File: Final Vishwashakti - Form 3 Certificate Q2 FY 25-26_sd.pdf28 Oct 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Inventory.pdf28 Oct 2025
Form 1File: Form - 1 Architect's Certificate -5th July 2025.pdf26 Jul 2025
Form 2File: Form - 2 Engineers Certificate.pdf26 Jul 2025
Form 3File: Final Vishwashakti - Form 3 Certificate Q1 FY 25-26_sd_sd_compressed.pdf26 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Inventory.pdf26 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate -5th APRIL 2025.pdf3 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final Vishwashakti - Form 3 Certificate Q4 FY 24-25_sd_compressed.pdf3 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineer's certificate for vishwashakti.pdf3 May 2025
Details of encumbrancesFile: ABFL sanction letter (signed copy)_.pdf2 May 2025
Details of encumbrancesFile: ABFL sanction letter - addendum (signed copy).pdf2 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate -4th Jan 2025.pdf12 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate -4th Jan 2025.pdf12 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Vishwashakti - Form 3 Certificate Q3 FY 24-25_sd.pdf12 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Vishwashakti - Form 3 Certificate Q3 FY 24-25_sd.pdf12 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Vishwashakti - Form 3 Certificate Q3 FY 24-25_sd.pdf12 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A QAC 21 22.pdf23 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A QAC 22-23.pdf23 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate - MARCH 2024.pdf13 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate - Form 2 - 31-03-2024.pdf13 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Vishwashakti - Form 3 Certificate Q4 F Y 23-24_sd_compressed.pdf13 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf22 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf22 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf22 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf22 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf22 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf22 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: From 2.pdf22 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: From 2.pdf22 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf22 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf22 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf22 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf22 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Vishwashakti - Form 3 Certificate SD_compressed.pdf21 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Vishwa Shakti --Annual Report ___Uploading.pdf7 Oct 2023
Declaration in FORM BFile: Affidavit cum Declaration - Vishwashakti-compressed.pdf3 Jun 2022
Proforma of Allotment letterFile: Allotment Letter as per RERA - June 2, 2022.pdf3 Jun 2022
Proforma of Allotment letterFile: First Draft of Agreement for Sale (RERA).pdf3 Jun 2022
Layout approvalFile: IOD Plan 1.pdf1 Jun 2022
Layout approvalFile: IOD Plan 2.pdf1 Jun 2022
Copy of the legal title reportFile: Vishwashakti RERA Title.pdf1 Jun 2022
Copy of the legal title reportFile: Pestom RERA Title.pdf1 Jun 2022
Copy of Layout Approval (in case of layout)File: IOD Plan 1.pdf1 Jun 2022
Copy of Layout Approval (in case of layout)File: IOD Plan 2.pdf1 Jun 2022
PAN CardFile: Pan Card - Vishwashakti.pdf31 May 2022
PAN CardFile: Pan Card - Pestom Sagar.pdf31 May 2022
PAN CardFile: Pan Card Copy Trilogy.pdf31 May 2022
Details of encumbrancesFile: Encumbrance from Vishwashakti.pdf31 May 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE.pdf31 May 2022
CERSAI detailsFile: CERSAI_Search_Report_200238514870_For_Asset_Based_Search_31_05_2022_11_55_10_566.pdf31 May 2022
Building plan approvalFile: IOD.pdf30 May 2022
Details of encumbrancesFile: Declaration of CC from Pestom Sagar.pdf30 May 2022
Building Plan Approval / NA Order for plotted developmentFile: IOD.pdf30 May 2022
Commencement Certificates / NA Order for plotted developmentFile: First CC.pdf30 May 2022
Declaration about Commencement CertificateFile: Declaration of CC from Vishwashakti.pdf30 May 2022
Declaration about Commencement CertificateFile: Declaration of CC from Pestom Sagar.pdf30 May 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf30 May 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf30 May 2022

How this compares with Mumbai Suburban

44%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep VISHWASANGAM on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near CHEMBUR6,700+ in Mumbai Suburban

2 kmVISHWASANGAMCompleted 160Lapsed / revoked 115Other 160Dot size: filed unitsN

Filed coordinates, straight-line distance. 435 registered projects within 2 km.

Builder: Vishwashakti Cooperative Housing Society Limited

Vishwashakti Cooperative Housing Society Limited has 1 registration on MahaRERA, including VISHWASANGAM. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if VISHWASANGAM is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VISHWASANGAM?

The registered promoter entity is Vishwashakti Cooperative Housing Society Limited, a society as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VISHWASANGAM?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for VISHWASANGAM?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VISHWASANGAM?

The professionals named in the filing: Architect: REDKAR & REDKAR; Engineer: ACE PROJECT CONSULTANT; Chartered Accountant: SPKG & CO LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VISHWASANGAM?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VISHWASANGAM. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VISHWASANGAM to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.