ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / VISHWANATH DARSHAN

Registered No litigation declared Residential / Group Housing project

VISHWANATH DARSHAN

By ASHAPURA COMBINES

RG-MH-06432 · RERA P51700054131 · Last updated on MahaRERA portal: 20 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 4 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2029Possession promisedno revision filed
3 of 11Construction stages donefurthest along: Internal walls, 80%
204 of 216Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 88 documents Report an error

VISHWANATH DARSHAN is a Residential / Group Housing project by ASHAPURA COMBINES in Thane, Maharashtra, registered with MahaRERA as P51700054131 on 29 Dec 2023. Possession is promised by 31 Dec 2029. 12 of the 216 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameVISHWANATH DARSHAN
  • TypeResidential / Group Housing
  • Location
    • Wadeghar
    • Wadeghar-Kalyan West
    • Kalyan-Dombivali (M Corp.)
    • Kalyan
    • Thane
    • 421301
  • Pincode421301
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700054131
  • ReraGenie IDRG-MH-06432

Builder

  • NameASHAPURA COMBINES
  • Entity typePartnership
  • PartnersMANGESH DASHRATH GAIKAR, HARILAL NATHU PATEL, VIPUL HARILAL PATEL
  • Other registrations4 more →
  • Completed2 of 5

Key dates

this monthRegisteredDec 2023PromisedDec 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on29 Dec 2023
  • Promised completion31 Dec 2029
  • Revised completionNone
  • Buildings1 building record
  • Documents filed88 files

Current status

6%12 of 216 units booked
30.8%Work done, per cost certificate

Figures as on 20 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
VISHWANATH DARSHANNA242419917216

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 80%.

VISHWANATH DARSHAN: 47% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.60%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities16

As on 20 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%
Layout House drainage and chamberYes0%

Parking filed167

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots167
Closed/Covered117
Open Space50

Land and ownership68

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area4,940 sq m
Land owned byThe promoter, with other names on the file
Named landowners68
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on20 Jun 2026
LandownerVillageDistrict
HARSHAL BABAN NAIKGhatkoparMumbai Suburban
PRAKASH BABAN NAIKGhatkoparMumbai Suburban
KAVITA PRAMOD MHATREGhatkoparMumbai Suburban
NIRMALA SATYAVAN PATILGhatkoparMumbai Suburban
GAJANAN KALU DALVIGhatkoparMumbai Suburban
SANTOSH GAJANAN DALVIGhatkoparMumbai Suburban
SURESH KALU DALVIGhatkoparMumbai Suburban
RAMESH KALU DALVIGhatkoparMumbai Suburban
KAMLABAI WAMAN PATILGhatkoparMumbai Suburban
UJWALA VILAS MIRKUTEGhatkoparMumbai Suburban
RAKESH MANOHAR KONKARGhatkoparMumbai Suburban
UMESH MANOHAR KONKARGhatkoparMumbai Suburban
SUNITA SHANKAR PAWARGhatkoparMumbai Suburban
SANDESH GAJANAN DALVIGhatkoparMumbai Suburban
SANDEEP GAJANAN DALVIGhatkoparMumbai Suburban
SANJAY SURESH DALVIGhatkoparMumbai Suburban
ABDUL RAUF GULAM AKBAR MOULVIGhatkoparMumbai Suburban
FAHIM AHMED GULAM AKBAR MOULVIGhatkoparMumbai Suburban
REHENA NAZIR FALKEGhatkoparMumbai Suburban
RUKSHANA SAHNAWAZ MAJIDGhatkoparMumbai Suburban
BALARAM BABU PATILGhatkoparMumbai Suburban
KASHIBAI BALARAM PATILGhatkoparMumbai Suburban
ASHOK BALARAM PATILGhatkoparMumbai Suburban
KIRTI ASHOK PATILGhatkoparMumbai Suburban
RAVINDRA BALARAM PATILGhatkoparMumbai Suburban
VASANTI RAVINDRA PATILGhatkoparMumbai Suburban
PREMA JAYRAM BAHIREGhatkoparMumbai Suburban
REKHA GANESH GHANSOLKARGhatkoparMumbai Suburban
SUDAM BABU PATILGhatkoparMumbai Suburban
PARVATI SUDAM PATILGhatkoparMumbai Suburban
YOGESH SUDAM PATILGhatkoparMumbai Suburban
AKLESH SUDAM PATILGhatkoparMumbai Suburban
SAVITA JAYWANT PATILGhatkoparMumbai Suburban
KAVITA ARVIND VAITIGhatkoparMumbai Suburban
VITHABAI TUKARAM BHAGATGhatkoparMumbai Suburban
SHEWANTA DHANAJAY BHOPIGhatkoparMumbai Suburban
SUMAN YASHWANT KOTGhatkoparMumbai Suburban
VAIJAYANTI BALARAM PATILGhatkoparMumbai Suburban
Manglya Alias Mangesh Vitthal Naik Alias VanjurkarGhatkoparMumbai Suburban
Sangeeta Mangesh Naik Alias VanjurkarGhatkoparMumbai Suburban
Aavish Alias Avinash Vitthal Naik Alias VanjurkarGhatkoparMumbai Suburban
Vandana Avinash Naik Alias VanjurkarGhatkoparMumbai Suburban
Nirabai Alias Nirmala Mangaldas PatilGhatkoparMumbai Suburban
Kantibai Alias Kanta Prakash KeneGhatkoparMumbai Suburban
Pandabai Alias Sumitra Dinkar NaikGhatkoparMumbai Suburban
Heerabai Baban NaikGhatkoparMumbai Suburban
Fashibai Eknath Naik Alias VanjurkarGhatkoparMumbai Suburban
Haresh Eknath Naik Alias VanjurkarGhatkoparMumbai Suburban
Anita Haresh Naik Alias VanjurkarGhatkoparMumbai Suburban
Sharad Eknath Naik Alias VanjurkarGhatkoparMumbai Suburban
Lalita Sharad Naik Alias VanjurkarGhatkoparMumbai Suburban
Sharmila Barku Alias Barkya KharbeGhatkoparMumbai Suburban
Bhagirthi Alias Bhagubai Vandar MadhaviGhatkoparMumbai Suburban
Gulab Kaluram Naik Alias VanjurkarGhatkoparMumbai Suburban
Naresh Kaluram Naik Alias VanjurkarGhatkoparMumbai Suburban
Asha Naresh Naik Alias VanjurkarGhatkoparMumbai Suburban
Vidya Naresh VitariGhatkoparMumbai Suburban
Lata Bharat ChaudhariGhatkoparMumbai Suburban
Janabai Ramchandra Naik Alias VanjurkarGhatkoparMumbai Suburban
Sham Ramchandra Naik Alias VanjurkarGhatkoparMumbai Suburban
Usha Sham Naik Alias VanjurkarGhatkoparMumbai Suburban
Rajesh Sham NaikGhatkoparMumbai Suburban
Dipti Sham NaikGhatkoparMumbai Suburban
Vasudev Ramchandra Naik Alias VanjurkarGhatkoparMumbai Suburban
Lata Vasudev Naik Alias VanjurkarGhatkoparMumbai Suburban
Heerabai Yashwant Naik Alias VanjurkarGhatkoparMumbai Suburban
Laxmibai Alias Pramila Sudarshan ChaudhariGhatkoparMumbai Suburban
Usha Dattu Alias Dattatray BhoirGhatkoparMumbai Suburban

Approvals and building plan

Sanctioning authorityKALYAN DOMBIVALI MAHANAGAR PALIKA
Permissible FSI14368.87
Proposed, not sanctioned14,369 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchJayant Arcade Junction of M G Rd and Rajawadi Naka Ghatkopar East Mumbai
Estimated costRs 62.71 cr
Cost incurredRs 19.32 cr
Work done30.82%
BuildingWingEstimatedIncurred
VISHWANATH DARSHANNARs 61.21 crRs 19.32 cr
-NARs 1.50 cr-

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDEEPAK PATIL
EngineerSHANTI CONSULTANT
EngineerJAYENDRA VISANJI VIRA
Chartered AccountantM K RAMANI
Chartered AccountantK H R & CO
PartnerRole in project
ASHAPURA COMBINES-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 20 Dec 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 2 Aug 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 20 Dec 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 20 Dec 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2029

Documents filed88

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 88 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Architect certificate-Vishwanath.pdf20 Jun 2026
Withdrawal Update Form 1File: Architect certificate-Vishwanath.pdf20 Jun 2026
Withdrawal Update Form 1File: Architect certificate-Vishwanath.pdf20 Jun 2026
Withdrawal Update Form 1File: Architect certificate-Vishwanath.pdf20 Jun 2026
Withdrawal Update Form 2File: Engineer's Certificate - FORM 2.pdf20 Jun 2026
Withdrawal Update Form 2File: Engineeru0027s Certificate - FORM 2.pdf20 Jun 2026
Withdrawal Update Form 2File: Engineeru0027s Certificate - FORM 2.pdf20 Jun 2026
Withdrawal Update Form 2File: Engineeru0027s Certificate - FORM 2.pdf20 Jun 2026
Withdrawal Update Form 3File: Vishwanath Darshar-From-3 CA Certificate-dt -06-12-2023_11zon.pdf20 Jun 2026
Withdrawal Update Form 3File: Vishwanath Darshar-From-3 CA Certificate-dt -06-12-2023_11zon.pdf20 Jun 2026
Withdrawal Update Form 3File: Vishwanath Darshar-From-3 CA Certificate-dt -06-12-2023_11zon.pdf20 Jun 2026
Withdrawal Update Form 3File: Vishwanath Darshar-From-3 CA Certificate-dt -06-12-2023_11zon.pdf20 Jun 2026
Form 1File: VISHWANATH DARSHAN ARCHITECT CERTIFICATE 31-03-2025.pdf21 May 2026
Form 2File: VD-FORM 2- AS ON 31-3-25.pdf21 May 2026
Form 3File: VD-FORM3 AS ON 31-3-25.pdf21 May 2026
Disclosure of Sold and Booked InventoryFile: VD- SOLD INVENTORY AS ON 31-3-25.pdf21 May 2026
Form 2A (FY 2025-2026)File: ENGINEER CERTIFICATE VISHWANATH DARSHAN 31-3-26.pdf30 Apr 2026
Form 1File: FORM 1 - VISHWANATH DARSHAN ARCHITECT CERTIFICATE 31-3-26.pdf29 Apr 2026
Form 2File: FORM 2 -ENGINEER CERTIFICATE VISHWANATH DARSDHAN 31-3-26.pdf29 Apr 2026
Form 3File: Form 3 - Vishwanath Darshan 31-3-26.pdf29 Apr 2026
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD INVENTORY - VD - 31-3-26.pdf29 Apr 2026
Form 1File: 1 Architect Certificate 31-12-2025.pdf27 Jan 2026
Form 2File: 2 ENGINEER Certificate 31-12-2025.pdf27 Jan 2026
Form 3File: Form 3 - VD Scan copy.pdf27 Jan 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory.pdf27 Jan 2026
Form 1File: VD ARCHITECT CERTIFICATE 30-9-25.pdf13 Nov 2025
Form 2File: VD ENGINEER CERTIFICATE 30-9-25.pdf13 Nov 2025
Form 3File: VD-Form-3 as on 30-9-25.pdf13 Nov 2025
Disclosure of Sold and Booked InventoryFile: Vishwanath Darshan-Sold Unsold Inventory.pdf13 Nov 2025
Form 2A (FY 2024-2025)File: VISHWANATH DARSHAN ENGINEER CERTIFICATE 31-3-25.pdf26 Sep 2025
Form 5 (FY 2024-2025)File: Vsihwanath darshan - Form 5-YR-2024-25.pdf26 Sep 2025
Form 1File: VISHWANATH DARSHAN ARCHITECT CERTIFICATE 30-6-25.pdf11 Sep 2025
Form 2File: VISHWANATH DARSHAN ENGINEER CERTIFICATE 30-6-25.pdf11 Sep 2025
Form 3File: VD- Form 3-dt-30-6-25.pdf11 Sep 2025
Disclosure of Sold and Booked InventoryFile: VD - Inventory Details-30-6-25.pdf11 Sep 2025
Disclosure of sold/ booked inventoryFile: VISHWANATH DARSHAN SOLD INVENTORY 31-3-25.pdf12 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: VISHWANATH DARSHAN ENGINEER CERTIFICATE 31-3-25.pdf12 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 6th -Form 3 - Vishwanath Darshan -31-3-25 (3).pdf6 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: VISHWANATH DARSHAN ENGINEER CERTIFICATE 31-03-2025.pdf5 May 2025
Disclosure of sold/ booked inventoryFile: vishwanath darshan sold list 31-12-24.pdf29 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: ENGINEER CERTIFICATE QUALITY VISHWANATH DARSHAN 31-03-24.pdf23 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 5-VD - Form3 - 31-12-24-SIGNED.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 5-ENGINEER CERTIFICATE VISHWANATH DARSHAN 31-12-24.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE VISHWANATH DARSHAN 31-12-24.pdf8 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE VISHWANATH DARSHAN 31-03-24.pdf27 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE VISHWANATH DARSHAN 30-06-24.pdf27 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2nd Form 3 - Vishwanath Darshan -31-3-24.pdf23 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3-VD - Form3 - 30-6-24-SIGNED.pdf23 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 4-VD - Form3 - 30-9-24-SIGNED.pdf23 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE VISHWANATH DARSHAN 30-9-24.pdf21 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2-ENGINEER CERTIFICATE VISHWANATH DARSHAN 1-04-24.pdf20 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3-ENGINEER CERTIFICATE VISHWANATH DARSHAN 1-07-24.pdf20 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 4-ENGINEER CERTIFICATE VISHWANATH DARSHAN 1-10-24.pdf20 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: VD-Form 5-2024-UPLOADED.pdf15 Nov 2024
Building plan approvalFile: Plan no 3_11zon.pdf20 Dec 2023
Copy of the legal title reportFile: ilovepdf_merged (42)_11zon.pdf20 Dec 2023
Details of encumbrances concerned to FinanceFile: encumbrance finance.pdf20 Dec 2023
Details of encumbrances concerned to FinanceFile: encumbrance legal.pdf20 Dec 2023
Details of encumbrances concerned to LegalFile: encumbrance finance.pdf20 Dec 2023
Details of encumbrances concerned to LegalFile: encumbrance legal.pdf20 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: Plan no 3_11zon.pdf20 Dec 2023
Commencement Certificates / NA Order for plotted developmentFile: CC Verification- Vishwanath Darshan (1).pdf20 Dec 2023
Other - LegalFile: CONFIRMATION DEED Anandibai dalvi_11zon.pdf20 Dec 2023
Other - LegalFile: CONFIRMATION DEED maina chuadhari_11zon.pdf20 Dec 2023
Other - TechnicalFile: CC Verification- Vishwanath Darshan (1).pdf20 Dec 2023
Other - TechnicalFile: Format -D, vishwanath Darshan .pdf20 Dec 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: GetUserDocumentFileContent (4).pdf4 Oct 2023
Deviation Report with respect to Allotment letterFile: DEVIATION REPORT - ALLOTMENT.pdf4 Oct 2023
Deviation Report with respect to model copy of AgreementFile: DEVIATION REPORT - AGREEMENT.pdf4 Oct 2023
Layout approvalFile: Plan no 1_11zon (1).pdf2 Aug 2023
Building plan approvalFile: Plan no 1_11zon (1).pdf2 Aug 2023
Building plan approvalFile: Plan 2_11zon (1).pdf2 Aug 2023
PAN CardFile: ASHAPURA COMBINES - PAN.pdf2 Aug 2023
Details of encumbrances concerned to FinanceFile: Declaration Legal Charge Vishwanath Darshan.pdf2 Aug 2023
Details of encumbrances concerned to LegalFile: Declaration Legal Charge Vishwanath Darshan.pdf2 Aug 2023
Copy of Layout Approval (in case of layout)File: Plan no 1_11zon (1).pdf2 Aug 2023
Building Plan Approval / NA Order for plotted developmentFile: Plan no 1_11zon (1).pdf2 Aug 2023
Building Plan Approval / NA Order for plotted developmentFile: Plan 2_11zon (1).pdf2 Aug 2023
Commencement Certificates / NA Order for plotted developmentFile: Comencement Certificate-Vishwanath.pdf2 Aug 2023
Declaration about Commencement CertificateFile: Declaration CC Vishwanath Darshan.pdf2 Aug 2023

How this compares with Thane

6%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep VISHWANATH DARSHAN on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Wadeghar-Kalyan West7,600+ in Thane

2 kmVISHWANATH DARSHANCompleted 60Lapsed / revoked 33Other 90Dot size: filed unitsN

Filed coordinates, straight-line distance. 183 registered projects within 2 km.

Builder: ASHAPURA COMBINES

ASHAPURA COMBINES has 5 registrations on MahaRERA, including NEELKANTH SHRUSHTI and RAMESHWAR. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if VISHWANATH DARSHAN is delayed beyond 31 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VISHWANATH DARSHAN?

The registered promoter entity is ASHAPURA COMBINES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VISHWANATH DARSHAN?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for VISHWANATH DARSHAN?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VISHWANATH DARSHAN?

The professionals named in the filing: Architect: DEEPAK PATIL; Engineer: SHANTI CONSULTANT; Engineer: JAYENDRA VISANJI VIRA; Chartered Accountant: M K RAMANI; Chartered Accountant: K H R & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VISHWANATH DARSHAN?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VISHWANATH DARSHAN. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VISHWANATH DARSHAN to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.