Completed No litigation declared Others project

VISHWAJEET EMPIRE NX

By GULABRAO BABURAO KARANJULE PATIL

RG-MH-30340 · RERA P51700030201 · Last updated on MahaRERA portal: 24 Jan 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 8 other registrations.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Jun 2026Possession promisedregistration recorded completed
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 95 documents Report an error

VISHWAJEET EMPIRE NX is a Others project by GULABRAO BABURAO KARANJULE PATIL in Thane, Maharashtra, registered with MahaRERA as P51700030201 on 5 Aug 2021. The registration is recorded completed; possession was promised by 23 Jun 2026.

At a glance

Project

  • NameVISHWAJEET EMPIRE NX
  • TypeOthers
  • Location
    • VILLAGE PALE
    • AMBERNATH
    • Ambarnath(M Cl)
    • Ambarnath
    • Thane
    • 421501
  • Pincode421501
  • RERA no.P51700030201
  • ReraGenie IDRG-MH-30340

Builder

  • NameGULABRAO BABURAO KARANJULE PATIL
  • Entity typeIndividual
  • GSTIN27ABIPK4810F1ZV
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • Other registrations8 more →
  • Completed4 of 9
  • Declared earlier projects8 →

Key dates

this monthRegisteredAug 2021PromisedJun 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on5 Aug 2021
  • Promised completion23 Jun 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed95 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING NO 1NA160000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 24 Jan 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

BUILDING NO 1: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 24 Jan 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,351 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI12331.68
Proposed, not sanctioned12,332 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchULHASNAGAR

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAR PRASAD K GARAD
EngineerNITIN NANDWANI
Chartered AccountantCA MAYUR K JAIN AND CO
PartnerRole in project
GULABRAO BABURAO KARANJULE PATIL-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 23 Jul 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 23 Jul 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 23 Jul 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 23 Jul 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 25 Nov 2024

Documents filed95

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 95 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Vishwajeet Empire NX.pdf24 Jan 2025
Disclosure of sold/ booked inventoryFile: UNSOLD-V EMPIRE NX-31-12-24.pdf21 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1-V EMPIRE NX-31-12-24.pdf15 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2-V EMPIRE NX-31-12-24.pdf14 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM-2A-V EMPIRE NX-31-12-24.pdf14 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3-V EMPIRE NX-30-09-24.pdf13 Dec 2024
Architect’s Certificate on Completion of Project (Form 4)File: FORM-4 (2).pdf25 Nov 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC-V Empire NX-Pale (2).pdf25 Nov 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC Plan 1_compressed.pdf25 Nov 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC Plan 2_compressed.pdf25 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM-5-V EMPIRE NX- FY 23-24.pdf25 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM-2A-V EMPIRE NX-30-09-24.pdf23 Oct 2024
Disclosure of sold/ booked inventoryFile: UNSOLD-V EMPIRE NX-30-09-2024.pdf21 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1-V EMPIRE NX-30-09-24.pdf19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2-V EMPIRE NX -30-09-24.pdf16 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3-V EMPIRE NX-30-06-24.pdf18 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2-V EMPIRE NX-30-06-24.pdf7 Aug 2024
Disclosure of sold/ booked inventoryFile: V EMPIRE NX-UNSOLD-30-06-24.pdf30 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1-V-EMPIRE NX-30-06-24.pdf26 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM-2A-V EMPIRE NX-30-06-24.pdf26 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3-V EMPIRE NX-31-03-24.pdf13 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-V EMPIRE NX-31-03-24.pdf5 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2-V EMPIRE NX-31-03-24.pdf4 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: V EMPIRE NX-FORM-2A-31-03-24.pdf1 May 2024
Disclosure of sold/ booked inventoryFile: V EMPIRE NX-UNSOLD-31-03-24.pdf29 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1-V EMPIRE NX-31-12-23.pdf20 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3-V EMPIRE NX-31-12-23.pdf20 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2-V EMPIRE NX-31-12-23.pdf16 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM-2A-V EMPIRE NX-31-12-23.pdf16 Feb 2024
Disclosure of sold/ booked inventoryFile: V EMPIRE NX- UNSOLD-31-12-23.pdf12 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2-V EMPIRE NX-30-09-23.pdf27 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1-V EMPIRE NX-30-09-23.pdf16 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-V EMPIRE NX-30-09-23.pdf14 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5-VISHWAJEET EMPIRE NX.pdf30 Oct 2023
Disclosure of sold/ booked inventoryFile: UNSOLD-V EMPIRE NX-30-09-23.pdf21 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1-V EMPIRE NX- 30-06-2023.pdf17 Oct 2023
Disclosure of sold/ booked inventoryFile: UNSOLD-V EMPIRE NX-30-06-23.pdf16 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: V EMPIRE NX-FORM-3-30-06-23.pdf16 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: V EMPIRE NX -30-06-23.pdf14 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: V EMPIRE NX -30-09-23.pdf14 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2-V EMPIRE NX-30-06-23.pdf13 Oct 2023
Disclosure of sold/ booked inventoryFile: UNSOLD-AC-V EMPIRE NX.pdf25 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: V EMPIRE NX-FORM-1-31-03-23.pdf21 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: V EMPIRE NX -FORM 2-31-03-23.pdf31 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: V EMPIRE NX-FORM-3-31-03-23.pdf31 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: V EMPIRE NX-31-03-23.pdf27 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3-V EMPIRE NX-31-12-22.pdf29 Mar 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A-V EMPIRE NX-31-12-22.pdf23 Mar 2023
Disclosure of sold/ booked inventoryFile: UNSOLD-V-EMPIRE NX-31-12-22.pdf21 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1-V EMPIRE NX-31-12-22.pdf20 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2-V EMPIRE NX -31-12-22.pdf20 Mar 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: BANK LETTER-RERA (1).pdf3 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: V EMPIRE NX-FORM 1-30-09-22.pdf12 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: V EMPIRE NX-FORM 2 -30-09-22.pdf12 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: V EMPIRE NX-FORM 1-30-09-22.pdf12 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: V EMPIRE NX-FORM 3- 30-09-22.pdf24 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM-5-V EMPIRE NX -21-22.pdf23 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3-V-EMPIRE NX-30-06-22.pdf5 Dec 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM-2A-V EMPIRE NX-30-06-22.pdf24 Nov 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM-2A-V EMPIRE NX-30-09-22.pdf24 Nov 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2-V EMPIRE NX-30-06-22.pdf20 Nov 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AE-V-EMPIRE NX-FORM 1-30-6-22.pdf16 Nov 2022
Disclosure of sold/ booked inventoryFile: VEMPIRE NX.pdf14 Nov 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM-2A-V EMPIRE NX-31-03-22.pdf28 May 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1-AE-V-EMP NX-31-03-22.pdf27 May 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2-V EMPIRE NX-31-03-22.pdf27 May 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2-V EMPIRE NX-31-03-22.pdf19 May 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Vishwajeet Empire NX_Compressed.pdf7 May 2022
Disclosure of sold/ booked inventoryFile: Vishwajeet Empire NX.pdf5 May 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_compressed.pdf8 Apr 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_compressed.pdf8 Apr 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_compressed.pdf8 Apr 2022
Disclosure of sold/ booked inventoryFile: Unsold-VE NX C.pdf17 Mar 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1-V-EMPIRE NX-31-12-21.pdf16 Mar 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: VE-NX-FORM-2-31-12-2021.pdf16 Mar 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: AE-EMPIR NX-FORM -2A-31-12-2021.pdf16 Mar 2022
Disclosure of sold/ booked inventoryFile: Unsold-VE-NX-31-12-2021_compressed (1)-compressed.pdf16 Mar 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM-2A.pdf24 Jul 2021
Proforma of Allotment letterFile: Agreement For Sale GBK -Abhijeet Empire.pdf24 Jul 2021
Proforma of Allotment letterFile: Allotment letter.pdf24 Jul 2021

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
VISHWAJEET EDGEMORIVALI PADA AMBERNATH118CompletedApr 2017Apr 2017

How this compares with Thane

24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep VISHWAJEET EMPIRE NX on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near AMBERNATH7,600+ in Thane

Builder: GULABRAO BABURAO KARANJULE PATIL

GULABRAO BABURAO KARANJULE PATIL has 9 registrations on MahaRERA, including VISHWAJEET PINK CITY and VISHWAJEET EMPIRE NX. Its filings disclose 8 earlier MahaRERA projects: declares 4 of 4 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if VISHWAJEET EMPIRE NX is delayed beyond 23 Jun 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VISHWAJEET EMPIRE NX?

The registered promoter entity is GULABRAO BABURAO KARANJULE PATIL, an individual as per the filing. Its GSTIN 27ABIPK4810F1ZV can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VISHWAJEET EMPIRE NX?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for VISHWAJEET EMPIRE NX?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VISHWAJEET EMPIRE NX?

The professionals named in the filing: Architect: AR PRASAD K GARAD; Engineer: NITIN NANDWANI; Chartered Accountant: CA MAYUR K JAIN AND CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VISHWAJEET EMPIRE NX?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VISHWAJEET EMPIRE NX. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VISHWAJEET EMPIRE NX to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.