Red flags

  • Allotment letter deviates from the model form

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Mar 2031Possession promisedno revision filed
3 of 18Construction stages doneacross 2 buildings; furthest along: Stilt Floor, 0%
122 of 176Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 11 documents Report an error

VISHNU VERTEX is a Residential / Group Housing project by VISHNU BIHAR BUILDERS AND DEVELOPERS LLP in Thane, Maharashtra, registered with MahaRERA as PR1330002502278 on 6 Feb 2026. Possession is promised by 31 Mar 2031. 54 of the 176 units on this registration are recorded sold or booked, and 3 of 18 construction stages are filed complete.

At a glance

Project

  • NameVISHNU VERTEX
  • TypeResidential / Group Housing
  • Location
    • Survey No.45
    • Hissa No.11 & Suvey No.50
    • Hissa No.4
    • Kalyan East
    • Adivali Dhokali
    • Ambarnath
    • Thane
    • 421306
  • Pincode421306
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR1330002502278
  • ReraGenie IDRG-MH-84884

Builder

  • NameVISHNU BIHAR BUILDERS AND DEVELOPERS LLP
  • Entity typePartnership
  • GSTIN27AAWFV9302Q1Z1
  • Designated PartnerVASANT SURENDRA SAHU
  • PartnersKRISHNANAND SIKANDAR YADAV, SHATRUGHAN RAMBOOGH TIWARI, KRIPA SHANKAR RAI

Key dates

this monthRegisteredFeb 2026PromisedMar 2031

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on6 Feb 2026
  • Promised completion31 Mar 2031
  • Revised completionNone
  • Buildings2 building records
  • Documents filed11 files

Current status

31%54 of 176 units booked
4.0%Work done, per cost certificate

Figures as on 4 Sep 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building no 1NA10972072
Building no 2NA14131040104

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 4 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 18 construction stages are filed complete across 2 buildings. The stage furthest along is Stilt Floor, at 0%.

Building no 122%
ActivityProgress
Excavation100%
Basement (if any)Not applicable
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building no 211%
ActivityProgress
Excavation100%
Basement (if any)Not applicable
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 4 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyNo0%
Sewerage (Chamber, Lines, Septic Tank , STP)No0%
Storm Water DrainsNo0%
Landscaping & Tree PlantingNo0%
Street LightingNo0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNo0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNo0%
Electrical meter room, sub-station, receiving stationNo0%
Aggregate area of recreational Open SpaceNo0%
Open ParkingNoNot applicable

Parking filed178

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots178
Stilt / Ground178
BuildingStilt / GroundTotal
Building no 1117117
Building no 26161

Land and ownership28

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area8,380 sq m
Land owned byNot the promoter
Named landowners28
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on31 Jul 2025
LandownerVillageDistrict
ANANTA PUNDALIK BHANEAdivali DhokaliThane
MUKUND PUNDALIK BHANEAdivali DhokaliThane
GURUDEV PUNDALIK BHANEAdivali DhokaliThane
RAMESH DATTU BHANEAdivali DhokaliThane
KAILAS KASHINATH BHANEAdivali DhokaliThane
AAMBIBAI DHARMA BHOIRAdivali DhokaliThane
SHANTABAI RAMESH BHOIRAdivali DhokaliThane
JIJABAI SITARAM PAWSHEAdivali DhokaliThane
Sangita Rajesh BhoirAdivali DhokaliThane
NIRMALA PADU BHANEAdivali DhokaliThane
ASHA LAXMAN MHATREAdivali DhokaliThane
SUMITRABAI SHRIRAM PAWARAdivali DhokaliThane
SHARDA ABHIMANYU BHANEAdivali DhokaliThane
VICKY ABHIMANYU BHANEAdivali DhokaliThane
PREMAL VIVEK KHANAVKARAdivali DhokaliThane
PRATIKSHA RAMAKANT JADHAVAdivali DhokaliThane
GOPAL JAIRAM BHANEAdivali DhokaliThane
Krishna Arjun BhaneAdivali DhokaliThane
Baliram Arjun BhaneAdivali DhokaliThane
Dattatray Arjun BhaneAdivali DhokaliThane
Gajanan Ramchandra BhaneAdivali DhokaliThane
Madhukar Ramchandra BhaneAdivali DhokaliThane
Namdev Vishnu BhaneAdivali DhokaliThane
Bandu Vishnu BhaneAdivali DhokaliThane
Ravindra Vishnu BhaneAdivali DhokaliThane
Navnath Janu BhaneAdivali DhokaliThane
Eknath Janu BhaneAdivali DhokaliThane
Baban Sawlram GaikwadAdivali DhokaliThane

Approvals and building plan

Sanctioning authorityADTP KALYAN DOMBIVALI MUNICIPAL CORPORATION, KALYAN
Permissible FSI8847.73
Proposed, not sanctioned8,536 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO 1 2 AND 3 SKYLON BUILDING OPP SOLAR COMPANY CHAKKI NAKA KALYAN EAST KALYAN DOMBIVLI MAHARASHTRA 421306
Estimated costRs 14.50 cr
Cost incurredRs 57.60 lakh
Work done3.97%
BuildingWingEstimatedIncurred
Building no 1NARs 7.20 crRs 36.00 lakh
Building no 2NARs 7.20 crRs 21.60 lakh
-NARs 10.00 lakh-

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVASTU ART ARCHITECTS
EngineerAARNA STRUCTURAL CONSULTANTS
Chartered AccountantMAYUR K JAIN AND CO
Chartered Accountantankit paras jain and co
PartnerRole in project
VISHNU BIHAR BUILDERS AND DEVELOPERS LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportNot on the file

    A lawyer's report on who owns the land and what is registered against it.

  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Jul 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Jul 2025
  4. Commencement CertificateNot on the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2031

Documents filed11

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form-1 30-06-2026.pdf4 Sep 2026
Withdrawal Update Form 2File: Form-2 30-06-2026.pdf4 Sep 2026
Withdrawal Update Form 3File: FORM 3 30-06-2026 Signed.pdf4 Sep 2026
Form 5 (FY 2025-2026)File: FORM 5 _SIGNED.pdf29 Jun 2026
Withdrawal Update Form 1File: Form-1 31-03-2026.pdf1 May 2026
Withdrawal Update Form 2File: Form-2 31-03-2026.pdf1 May 2026
Withdrawal Update Form 3File: Final Form 3 Vishnu Vertex Q4.pdf1 May 2026
Layout approvalFile: building no 1 plan.pdf30 Jul 2025
Building plan approvalFile: Plan 2.pdf30 Jul 2025
Building plan approvalFile: PLAN 3.pdf30 Jul 2025
Declaration and undertaking (Annexure A)File: Revised Declaration Cum Undertaking.pdf28 Jul 2025

How this compares with Thane

31%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep VISHNU VERTEX on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kalyan East7,600+ in Thane

Builder: VISHNU BIHAR BUILDERS AND DEVELOPERS LLP

VISHNU BIHAR BUILDERS AND DEVELOPERS LLP has 1 registration on MahaRERA, including VISHNU VERTEX. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if VISHNU VERTEX is delayed beyond 31 Mar 2031?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VISHNU VERTEX?

The registered promoter entity is VISHNU BIHAR BUILDERS AND DEVELOPERS LLP, a partnership as per the filing. Its GSTIN 27AAWFV9302Q1Z1 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VISHNU VERTEX?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for VISHNU VERTEX?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VISHNU VERTEX?

The professionals named in the filing: Architect: VASTU ART ARCHITECTS; Engineer: AARNA STRUCTURAL CONSULTANTS; Chartered Accountant: MAYUR K JAIN AND CO; Chartered Accountant: ankit paras jain and co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VISHNU VERTEX?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VISHNU VERTEX. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VISHNU VERTEX to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.