Home / Browse projects / Thane, Maharashtra / VISHNU VATIKA NX PHASE II D & H WING

Registered No litigation declared Residential / Group Housing project

VISHNU VATIKA NX PHASE II D & H WING

By M/S. VISHNU GROUP

RG-MH-04144 · RERA P51700021437 · Last updated on MahaRERA portal: 16 Jan 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Oct 2026Possession promisedmoved 12 months from the original
15 of 33Construction stages doneacross 3 buildings; furthest along: Internal walls, 96%
44 of 147Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 162 documents Report an error

VISHNU VATIKA NX PHASE II D & H WING is a Residential / Group Housing project by M/S. VISHNU GROUP in Thane, Maharashtra, registered with MahaRERA as P51700021437 on 28 Jun 2019. Possession is promised by 31 Oct 2026. The completion date has moved by 12 months from the original filing. 103 of the 147 units on this registration are recorded sold or booked, and 15 of 33 construction stages are filed complete.

At a glance

Project

  • NameVISHNU VATIKA NX PHASE II D & H WING
  • TypeResidential / Group Housing
  • Location
    • KANHOR ROAD
    • BADLAPUR GAON
    • Badlapur (M Cl)
    • Ambarnath
    • Thane
    • 421503
  • Pincode421503
  • RERA no.P51700021437
  • ReraGenie IDRG-MH-04144

Builder

  • NameM/S. VISHNU GROUP
  • Entity typePartnership
  • PartnersRAJENDRA DAMODAR KONDILKAR, SANJAY DAMODAR KONDILKAR, VAIBHAV VISHNU PISEKAR, SHRADDHA MUKESH MORE, BHARTI MOHAN DHULE

Key dates

this monthRegisteredJun 2019First promiseOct 2025Revised toOct 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on28 Jun 2019
  • Promised completion31 Oct 2026
  • Revised completionRevised to 31 Oct 2026 (originally 30 Oct 2025)
  • Buildings3 building records
  • Documents filed162 files

Current status

70%103 of 147 units booked
92.5%Work done, per cost certificate

Figures as on 16 Jan 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
D WINGNA8840040
H WINGNA12121070107
G WINGNA88000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 16 Jan 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

15 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Internal walls, at 96%.

D WING82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
H WING76%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises96%
Sanitary Fittings within the flats / premises79%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.62%
G WING0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 16 Jan 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes59%
Landscaping & Tree PlantingYes83%
Street LightingYes76%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes76%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes20%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area9,990 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on19 Jun 2025
LandownerVillageDistrict
DASHARATA KRUSHNA FULAVAREBadlapur (M Cl)Thane
SAGAR KRISHNA PHULVAREBadlapur (M Cl)Thane

Approvals and building plan

Sanctioning authorityKulgaon Badlapur Nagarparishad
Permissible FSI5323.87
Proposed, not sanctioned295 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP 1 AND 2 PUSHKAR APTS RAMESHWADI BADLAPUR GAON RD KULGAON BADLAPUR W MUMBAI MAHARASHTRA 421503
Estimated costRs 13.86 cr
Cost incurredRs 12.82 cr
Work done92.47%
BuildingWingEstimatedIncurred
H WINGNARs 10.03 crRs 9.24 cr
D WINGNARs 2.73 crRs 2.73 cr
-NARs 1.10 crRs 84.40 lakh

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectM SQUARE ARCHITECT PROP MUKESH MORE
EngineerTECHNO STRUCT
EngineerAtul Kudtarkar & Associates
Chartered AccountantKapure and Kapure Chartered Accountants
Chartered AccountantShripati Gandhi Choudhary & Co.
PartnerRole in project
M/S. VISHNU GROUP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA15112518337Oct 2025 → Oct 2026

Reason as filed by the promoterThe Project consist of Two wings that is Wing D and Wing H. Construction work of Wing D is 100% complete and it is evident from Table A of Form 1. Similarly, RCC Structure of Wing H along with the internal work is almost complete except the installation of lift. It is evident from the above table that sale of the wing H is very less sales. Being lower than expected sale has effected the cash flows of the project. Lower than expected cash flows has in turn effected the pace of construction of the project because of which the project couldn’t be completed within given timeline. Uncertain operati

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 5 Jun 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 25 Jun 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 5 Jun 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 24 Jun 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Oct 2026

Documents filed162

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 162 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1.PDF16 Jan 2026
Withdrawal Update Form 2File: Form 2 - Vishnu Group - Dec 25.pdf16 Jan 2026
Withdrawal Update Form 3File: Form 3 - Vishnu Group - Dec 25.PDF16 Jan 2026
Form 2A (FY 2024-2025)File: Form 2A Mar-25 Phase II.pdf14 Jan 2026
Form 5 (FY 2023-2024)File: Form 5 - Phase II 23-24.pdf13 Jan 2026
Form 5 (FY 2024-2025)File: Form 5 - Phase II 24-25.pdf13 Jan 2026
Form 2A (FY 2019-2020)File: Form 2A Phase II 2019-20 (Q4).pdf11 Dec 2025
Form 2A (FY 2020-2021)File: VG Ph II Form 2A - Mar 21.PDF11 Dec 2025
Form 2A (FY 2021-2022)File: VG Ph II Form 2A - Mar 22.PDF11 Dec 2025
Form 2A (FY 2022-2023)File: VG Ph II Form 2A - Mar 23.PDF11 Dec 2025
Form 2A (FY 2023-2024)File: VG Ph II Form 2A - Mar 24.PDF11 Dec 2025
Form 5 (FY 2019-2020)File: Ph II Form 5 (Mar 20).PDF11 Dec 2025
Form 5 (FY 2020-2021)File: Ph II Form 5 (Mar 21).PDF11 Dec 2025
Form 5 (FY 2021-2022)File: Ph II Form 5 (Mar 22).PDF11 Dec 2025
Form 5 (FY 2022-2023)File: Form 5 Vishnu Group 22-23.PDF11 Dec 2025
Withdrawal Update Form 1File: Form 1 2025-26.PDF15 Nov 2025
Withdrawal Update Form 1File: Form 1.PDF15 Nov 2025
Withdrawal Update Form 2File: Form II 2025-26.PDF15 Nov 2025
Withdrawal Update Form 2File: Form II 2025-26.PDF15 Nov 2025
Withdrawal Update Form 3File: Form 3 Phase II Sept-25.PDF15 Nov 2025
Withdrawal Update Form 3File: Form 3 Phase II Jun-25.PDF15 Nov 2025
Form 1File: Form 1 - Dec 24.PDF1 Jul 2025
Form 2File: Form 2 - Dec 24.PDF1 Jul 2025
Form 3File: Form 3 Dec-2024.PDF1 Jul 2025
Disclosure of Sold and Booked InventoryFile: Discloser of Sold Booked Inventory - Dec 24.PDF1 Jul 2025
Certificates of CA (Form 3)File: VG Form 3_compressed.pdf22 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Ph II Form 2.PDF22 Apr 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory Mar-25.PDF22 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ph II Form 1 202425Q3.PDF21 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 12 Ph II Form 2 Q3 2425.PDF21 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ph II Form 1 .PDF31 Jan 2025
Certificates of CA (Form 3)File: Form 3 Sep-2024.PDF31 Jan 2025
Certificates of CA (Form 3)File: Form 3 Dec-2024.PDF31 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Ph II Form 2 Q2.PDF31 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclouser of Sold Booked Inventory.PDF31 Jan 2025
Disclosure of sold/ booked inventoryFile: Discloser of Sold Booked Inventory - Dec 24.PDF31 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: VG Form 1.PDF5 Aug 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: VG Form 2.PDF31 Jul 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold_Booked Inventory.PDF30 Jul 2024
Certificates of CA (Form 3)File: VG Form 3.PDF30 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: VG Ph II Form 2A - Mar 22.PDF21 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: VG Ph II Form 2A - Mar 23.PDF21 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: VG Ph II Form 2A - Mar 24.PDF21 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: VG Form 1 - Mar 24.PDF20 Apr 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: VG Form 2 - Mar 24.PDF20 Apr 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold_Booked Inventory.PDF20 Apr 2024
Certificates of CA (Form 3)File: Form 3 - Mar 24.PDF20 Apr 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Sep 23.PDF22 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Dec 23.PDF22 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - March 23.PDF12 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - June 23.PDF12 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Sep 23.PDF12 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Dec 23.PDF12 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 March 23.pdf12 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 June 23.pdf12 Feb 2024
Certificates of CA (Form 3)File: Final form 3 - June 23.PDF12 Feb 2024
Certificates of CA (Form 3)File: Final Form 3 - Sept 23.PDF12 Feb 2024
Certificates of CA (Form 3)File: Final form 3 - Dec 23.pdf12 Feb 2024
Certificates of CA (Form 3)File: Ph II Form 3 June 22.pdf7 Oct 2023
Certificates of CA (Form 3)File: Ph II Form 3 Sep 22.pdf7 Oct 2023
Certificates of CA (Form 3)File: Ph II Form 3 Dec 22.pdf7 Oct 2023
Certificates of CA (Form 3)File: Ph II Form 3 Mar 23.pdf7 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Vishnu Group 22-23.PDF30 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Ph II Form 5 (Mar 20).PDF8 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Ph II Form 5 (Mar 21).PDF8 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Ph II Form 5 (Mar 22).PDF8 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.PDF13 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.PDF13 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.PDF13 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.PDF13 Feb 2023
Certificates of CA (Form 3)File: Form 3 - Phase II sep 21.pdf13 Feb 2023
Certificates of CA (Form 3)File: Form 3 Dec 21.PDF13 Feb 2023
Certificates of CA (Form 3)File: Form 3 Mar 22.PDF13 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Mar 21.PDF4 May 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Jun 21.PDF4 May 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Sep 21.PDF4 May 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: VG Phase I Architect Cert 2020-21(Q3).PDF4 May 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Mar 21.PDF4 May 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 June 21.PDF4 May 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Mar 21.pdf4 May 2022

How this compares with Thane

70%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 12 months
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep VISHNU VATIKA NX PHASE II D & H WING on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BADLAPUR GAON7,600+ in Thane

Builder: M/S. VISHNU GROUP

M/S. VISHNU GROUP has 1 registration on MahaRERA, including VISHNU VATIKA NX PHASE II D & H WING. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if VISHNU VATIKA NX PHASE II D & H WING is delayed beyond 31 Oct 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VISHNU VATIKA NX PHASE II D & H WING?

The registered promoter entity is M/S. VISHNU GROUP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VISHNU VATIKA NX PHASE II D & H WING?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for VISHNU VATIKA NX PHASE II D & H WING?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VISHNU VATIKA NX PHASE II D & H WING?

The professionals named in the filing: Architect: M SQUARE ARCHITECT PROP MUKESH MORE; Engineer: TECHNO STRUCT; Engineer: Atul Kudtarkar & Associates; Chartered Accountant: Kapure and Kapure Chartered Accountants; Chartered Accountant: Shripati Gandhi Choudhary & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VISHNU VATIKA NX PHASE II D & H WING?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VISHNU VATIKA NX PHASE II D & H WING. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VISHNU VATIKA NX PHASE II D & H WING to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.