Home / Browse projects / Thane, Maharashtra / VISHNU BLISS

Completed No litigation declared Others project

VISHNU BLISS

By LEGACY BUILDERS & INNOVATORS

RG-MH-06990 · RERA P51700055630 · Last updated on MahaRERA portal: 30 Jun 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Completion date moved by 6 months
  • 1 extension taken

Clear

  • No litigation declared
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Jun 2026Possession promisedregistration recorded completed
4 of 11Construction stages donefurthest along: Stilt Floor, 98%
11 of 28Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 59 documents Report an error

VISHNU BLISS is a Others project by LEGACY BUILDERS & INNOVATORS in Thane, Maharashtra, registered with MahaRERA as P51700055630 on 4 Apr 2024. The registration is recorded completed; possession was promised by 30 Jun 2026. The completion date has moved by 6 months from the original filing. 17 of the 28 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameVISHNU BLISS
  • TypeOthers
  • Location
    • .
    • Chikanghar
    • Kalyan
    • Thane
    • 421301
  • Pincode421301
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700055630
  • ReraGenie IDRG-MH-06990

Builder

  • NameLEGACY BUILDERS & INNOVATORS
  • Entity typePartnership
  • PartnersARJUN VISHNU MHATRE, SUBHASH VISHNU MHATRE, MADHUKAR VISHNU MHATRE
  • PartnersPARITOSH SUBHASH MHATRE, KEWAL ARJUN MHATRE, VIRAJ ARJUN MHATRE, OMKAR SUBHASH MHATRE, HARSHAD MADHUKAR MHATRE

Key dates

this monthRegisteredApr 2024First promiseDec 2025Revised toJun 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on4 Apr 2024
  • Promised completion30 Jun 2026
  • Revised completionRevised to 30 Jun 2026 (originally 31 Dec 2025)
  • Buildings1 building record
  • Documents filed59 files

Current status

61%17 of 28 units booked
94.2%Work done, per cost certificate

Figures as on 30 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
VISHNU BLISSNA7724428

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 30 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Stilt Floor, at 98%.

VISHNU BLISS: 80% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor98%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.98%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%

Progress on shared amenities15

As on 30 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes40%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes95%
Storm Water DrainsYes95%
Landscaping & Tree PlantingYes95%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes90%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed12

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots12
Closed/Covered12

Land and ownership3

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area460 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on10 Sep 2024
LandownerVillageDistrict
ARJUN VISHNU MHATREKalyanThane
MADHUKAR VISHNU MHATREKalyanThane
SUBHASH VISHNU MHATREKalyanThane

Approvals and building plan

Sanctioning authorityKALYAN DOMBIVLI MUNICIPAL CORPORATION
Permissible FSI1323.98
Proposed, not sanctioned1,324 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGround floor Ravi Raj Apartment Khadakpada Kalyan West
Estimated costRs 3.84 cr
Cost incurredRs 3.62 cr
Work done94.23%
BuildingWingEstimatedIncurred
VISHNU BLISSNARs 3.69 crRs 3.54 cr
-NARs 14.76 lakhRs 7.38 lakh

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectEMERGE ARCHITECTS & ASSOCIATES
EngineerVIVANSH ASSOCIATES
EngineerKEWAL ARJUN MHATRE
Chartered AccountantMASKARA AND ASSOCIATES
Chartered AccountantRPMG & ASSOCIATES
Chartered AccountantPOOJA NIKHILESH SURVE
PartnerRole in project
LEGACY BUILDERS & INNOVATORS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA22122518914Dec 2025 → Jun 2026

Reason as filed by the promoterAs per Architect Certificate as on 30/09/2025 explains that the project was almost at the verge of completion

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12602471Eknath Ranjak DhokaleLEGACY BUILDERS & INNOVATORS27/04/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Feb 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 3 May 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 23 Feb 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 3 May 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed59

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Legacy - Form 2A signed.pdf30 Jun 2026
Occupational CertificateFile: Vishnu Bliss_Full OC.pdf29 Jun 2026
Withdrawal Update Form 1File: Form 1 Signed 31032026.pdf27 Apr 2026
Withdrawal Update Form 2File: Form 2 Signed 31032026.pdf27 Apr 2026
Withdrawal Update Form 3File: Form 3 Signed 31032026.pdf27 Apr 2026
Withdrawal Update Form 1File: Form 1 signed.pdf17 Jan 2026
Withdrawal Update Form 2File: Form 2 Signed.pdf17 Jan 2026
Withdrawal Update Form 3File: Form 3 Signed.pdf17 Jan 2026
Withdrawal Update Form 1File: Form 1 Signed.pdf18 Oct 2025
Withdrawal Update Form 2File: Form 2 Signed.pdf18 Oct 2025
Withdrawal Update Form 3File: Form 3 Signed.pdf18 Oct 2025
Withdrawal Update Form 1File: Form 1 - Signed.pdf4 Aug 2025
Withdrawal Update Form 2File: Form 2 - Signed.pdf4 Aug 2025
Withdrawal Update Form 3File: Form 3 - Signes.pdf4 Aug 2025
Form 2A (FY 2024-2025)File: Form 2A Signed.pdf15 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf6 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf6 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf6 May 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Book Inventory.pdf6 May 2025
Layout approvalFile: Revised Plan_compressed.pdf3 May 2025
Copy of Layout Approval (in case of layout)File: Revised Plan_compressed.pdf3 May 2025
Commencement Certificates / NA Order for plotted developmentFile: Revised CC.pdf3 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM -3_Updated.pdf22 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1.pdf9 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2.pdf9 Jan 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD INVENTORY.pdf9 Jan 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD INVENTORY.pdf9 Jan 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD INVENTORY.pdf9 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf3 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1.pdf2 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf2 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - 30-June-2024-Signed_compressed.pdf23 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-01 Architects Certificate.pdf21 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Engineer certificate.pdf21 Oct 2024
Declaration in FORM BFile: Notarized Form 'B' - Promoter.pdf14 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf29 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf29 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Final.pdf29 Feb 2024
Proforma of Agreement for saleFile: Proforma of Agreement for Sale.pdf29 Feb 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration about separate bank account.pdf29 Feb 2024
Other - TechnicalFile: Annexure 'A' - Declaration-Cum-Undertaking Final.pdf29 Feb 2024
Copy of the legal title reportFile: Legal Title Report.pdf28 Feb 2024
Details of encumbrances concerned to FinanceFile: Details of Financial Encumbrances.pdf28 Feb 2024
Details of encumbrances concerned to FinanceFile: Details of Legal Encumbrances.pdf28 Feb 2024
Details of encumbrances concerned to LegalFile: Details of Financial Encumbrances.pdf28 Feb 2024
Details of encumbrances concerned to LegalFile: Details of Legal Encumbrances.pdf28 Feb 2024
Declaration about Commencement CertificateFile: Declaration about Commencement Certificate - Format 'D'.pdf28 Feb 2024
CERSAI detailsFile: CERSAI Declaration Final.pdf28 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in other real estate organization.pdf28 Feb 2024
Deviation Report with respect to Allotment letterFile: No Deviations in Allotment Letter.pdf28 Feb 2024
Deviation Report with respect to model copy of AgreementFile: No Deviations in Agreement for Sale.pdf28 Feb 2024
Proforma of Allotment letterFile: Proforma of Allotment Letter.pdf27 Feb 2024
Layout approvalFile: Layout Plan Final.pdf23 Feb 2024
Building plan approvalFile: Layout Plan Final.pdf23 Feb 2024
Copy of Layout Approval (in case of layout)File: Layout Plan Final.pdf23 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: Layout Plan Final.pdf23 Feb 2024
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf22 Feb 2024
Other - LegalFile: Legacy - Partnership deed_compressed.pdf22 Feb 2024
PAN CardFile: PAN Card of Firm.pdf7 Nov 2023

How this compares with Thane

61%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 6 months
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep VISHNU BLISS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near .7,600+ in Thane

2 kmVISHNU BLISSCompleted 71Lapsed / revoked 54Other 118Dot size: filed unitsN

Filed coordinates, straight-line distance. 243 registered projects within 2 km.

Builder: LEGACY BUILDERS & INNOVATORS

LEGACY BUILDERS & INNOVATORS has 1 registration on MahaRERA, including VISHNU BLISS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if VISHNU BLISS is delayed beyond 30 Jun 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VISHNU BLISS?

The registered promoter entity is LEGACY BUILDERS & INNOVATORS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VISHNU BLISS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against VISHNU BLISS?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for VISHNU BLISS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VISHNU BLISS?

The professionals named in the filing: Architect: EMERGE ARCHITECTS & ASSOCIATES; Engineer: VIVANSH ASSOCIATES; Engineer: KEWAL ARJUN MHATRE; Chartered Accountant: MASKARA AND ASSOCIATES; Chartered Accountant: RPMG & ASSOCIATES; Chartered Accountant: POOJA NIKHILESH SURVE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VISHNU BLISS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VISHNU BLISS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VISHNU BLISS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.