Registered No litigation declared Residential / Group Housing project

Vishal Complex E Wing

By VISHAL CHORDIYA CONSTRUCTIONS PRIVATE LIMITED

RG-MH-87790 · RERA P52100056126 · Last updated on MahaRERA portal: 18 Jul 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Mar 2027Possession promisedmoved 12 months from the original
4 of 11Construction stages donefurthest along: External plumbing and external plaster, 90%
6 of 6Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 76 documents Report an error

Vishal Complex E Wing is a Residential / Group Housing project by VISHAL CHORDIYA CONSTRUCTIONS PRIVATE LIMITED in Pune, Maharashtra, registered with MahaRERA as P52100056126 on 16 May 2024. Possession is promised by 31 Mar 2027. The completion date has moved by 12 months from the original filing. 0 of the 6 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameVishal Complex E Wing
  • TypeResidential / Group Housing
  • Location
    • Opposite Atlas Capco
    • Kundan Nagar Kasarwadi
    • Pune City
    • Pune
    • 411034
  • Pincode411034
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100056126
  • ReraGenie IDRG-MH-87790

Builder

  • NameVISHAL CHORDIYA CONSTRUCTIONS PRIVATE LIMITED
  • Entity typeCompany
  • CINU45201PN2003PTC018055
  • GSTIN27AABCV9574C1Z3
  • DirectorsDILIP MOTILAL CHORDIYA, KUNAL DILIP CHORDIYA, VISHAL DILIP CHORDIYA

Key dates

this monthRegisteredMay 2024First promiseMar 2026Revised toMar 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on16 May 2024
  • Promised completion31 Mar 2027
  • Revised completionRevised to 31 Mar 2027 (originally 31 Mar 2026)
  • Buildings1 building record
  • Documents filed76 files

Current status

0%0 of 6 units booked
85.1%Work done, per cost certificate

Figures as on 18 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
E WingNA76606

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 18 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is External plumbing and external plaster, at 90%.

E Wing: 55% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises85%
Sanitary Fittings within the flats / premises30%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 18 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes23%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes30%
Energy managemcntYes0%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed23

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots23
Closed/Covered23

Land and ownership30

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area602 sq m
Land owned byNot the promoter
Named landowners30
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on20 Sep 2024
LandownerVillageDistrict
Vitthal Pandurang WakharePune (M Corp.)Pune
Namdev Baburao WakharePune (M Corp.)Pune
Babanrao Baburao WakharePune (M Corp.)Pune
Keshav Namdev WakharePune (M Corp.)Pune
Malan Vitthal WakharePune (M Corp.)Pune
Sudhir Vitthal WakharePune (M Corp.)Pune
Sarika Nitin KhadePune (M Corp.)Pune
Sandhya Vitthal WakharePune (M Corp.)Pune
Tukaram Pandurang WakharePune (M Corp.)Pune
Sunita Tukaram WakharePune (M Corp.)Pune
Raghunath Baburao WakharePune (M Corp.)Pune
Muktabai Raghunath WakharePune (M Corp.)Pune
Mukund Raghunath WakharePune (M Corp.)Pune
Sharda Rajendra ThorvePune (M Corp.)Pune
Nalini Jaysingh MorePune (M Corp.)Pune
Chandrakala Santosh SarafPune (M Corp.)Pune
Puroshattam Namdev WakharePune (M Corp.)Pune
Saraswati Babanrao WakharePune (M Corp.)Pune
Ghanshyam Babanrao WakharePune (M Corp.)Pune
Kalpana Ghanshyam WakharePune (M Corp.)Pune
Mangal Rajendra GaikwadPune (M Corp.)Pune
Sharda Sanjay BhondavePune (M Corp.)Pune
Jajabai Namdev WakharePune (M Corp.)Pune
Sonal Puroshttam WakharePune (M Corp.)Pune
Sunita Bajirav BalpatakiPune (M Corp.)Pune
Rutuja Keshav WakharePune (M Corp.)Pune
Kanchan Keshav WakharePune (M Corp.)Pune
Sangram Keshav WakharePune (M Corp.)Pune
Amruta Puroshattam WakharePune (M Corp.)Pune
Aditya Puroshattam WakharePune (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPimpri Chinchwad Municipal Corporation
Permissible FSI1623.84
Proposed, not sanctioned1,624 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch12 13 City Pride Sector No 25 New Town Development P C N T D A Nigdi Pimpri-Chinchwad Maharashtra 4
Estimated costRs 3.71 cr
Cost incurredRs 3.15 cr
Work done85.08%
BuildingWingEstimatedIncurred
E WingNARs 3.51 crRs 3.10 cr
-NARs 20.00 lakhRs 5.58 lakh

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMahendra Thakur
EngineerSunil Dhanpal Kognole
EngineerSanket Vitthal Jadhav
Chartered AccountantCA Yogesh Katariya
Chartered AccountantRMRA & ASSOCIATES
PartnerRole in project
VISHAL CHORDIYA CONSTRUCTIONS PRIVATE LIMITED-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA05032620105Mar 2026 → Mar 2027

Reason as filed by the promoterThe Project has been extended due to shortage of Labour and significant pending work, including finishing and fit out activities which could not be completed as scheduled due to unavailability of adequate labour. The substanial work still pending includes electrical installations ,plumbing flooring and interior fitting.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 5 Apr 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 5 Apr 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 5 Apr 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Feb 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2027

Documents filed76

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1.pdf18 Jul 2026
Withdrawal Update Form 2File: FORM 2.pdf18 Jul 2026
Withdrawal Update Form 3File: FORM 3.pdf18 Jul 2026
Withdrawal Update Form 1File: FORM 1.pdf18 Apr 2026
Withdrawal Update Form 2File: FORM 2.pdf18 Apr 2026
Withdrawal Update Form 3File: FORM 3.pdf18 Apr 2026
Withdrawal Update Form 1File: FORM 1.pdf17 Jan 2026
Withdrawal Update Form 1File: FORM 1.pdf17 Jan 2026
Withdrawal Update Form 2File: FORM 2.pdf17 Jan 2026
Withdrawal Update Form 2File: FORM 2.pdf17 Jan 2026
Withdrawal Update Form 3File: FORM 3.pdf17 Jan 2026
Withdrawal Update Form 3File: FORM 3.pdf17 Jan 2026
Withdrawal Update Form 1File: FORM 1.pdf14 Oct 2025
Withdrawal Update Form 2File: FORM 2.pdf14 Oct 2025
Withdrawal Update Form 3File: FORM 3.pdf14 Oct 2025
Form 2A (FY 2024-2025)File: ENGINEER FORM 2A.pdf26 Sep 2025
Form 5 (FY 2024-2025)File: FORM 5.pdf19 Sep 2025
Form 1File: FORM 1.pdf21 Jun 2025
Form 2File: FORM 2.pdf21 Jun 2025
Form 3File: FORM 3.pdf21 Jun 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD INVENTORY.pdf21 Jun 2025
Form 1File: FORM 1.pdf21 Jun 2025
Form 2File: FORM 2.pdf21 Jun 2025
Form 3File: FORM 3.pdf21 Jun 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD INVENTORY.pdf21 Jun 2025
Form 1File: FORM 1.pdf21 Jun 2025
Form 2File: FORM 2.pdf21 Jun 2025
Form 3File: FORM 3.pdf21 Jun 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD INVENTORY.pdf21 Jun 2025
Form 1File: Form 1 Architect Mar 2025.pdf26 May 2025
Form 2File: Form 2 Engineer Certificate Mar 2025.pdf26 May 2025
Form 3File: Form 3 CA Mar 2025.pdf26 May 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold-Vishal Complex E wing.pdf26 May 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold-Vishal Complex E wing.pdf17 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Mar 2025.pdf16 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Mar 2025.pdf16 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate Mar 2025.pdf16 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Vishal Complex E wing.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Vishal Complex E wing.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 _Vishal Complex E wing.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold-Booked Inventory.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Vccpl Sep 2024.pdf19 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate E Wing.pdf19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate E Wing.pdf19 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf20 Jul 2024
Layout approvalFile: Vishal Complex 1.pdf5 Apr 2024
Building plan approvalFile: Vishal Complex 1.pdf5 Apr 2024
Building plan approvalFile: Vishal Complex 2.pdf5 Apr 2024
Building plan approvalFile: Vishal Complex 3.pdf5 Apr 2024
Building plan approvalFile: Vishal Complx E Wing Plan 4.pdf5 Apr 2024
Copy of the legal title reportFile: chordia search Report.pdf5 Apr 2024
Copy of Layout Approval (in case of layout)File: Vishal Complex 1.pdf5 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: Vishal Complex 1.pdf5 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: Vishal Complex 2.pdf5 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: Vishal Complex 3.pdf5 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: Vishal Complx E Wing Plan 4.pdf5 Apr 2024
Proforma of Agreement for saleFile: Final ATS_16-03-2024.pdf5 Apr 2024
Other - TechnicalFile: ORDER 45.pdf1 Mar 2024
Other - TechnicalFile: ORDER 50.pdf1 Mar 2024
CERSAI detailsFile: CERSAI REPORT.pdf26 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate 20th Feb 2024 VCCPL.pdf26 Feb 2024
Deviation Report with respect to Allotment letterFile: 15 No Deviatin with respect Allotment Letter-New_page-0001.pdf26 Feb 2024
Deviation Report with respect to model copy of AgreementFile: 14 No Deviatin with respect-agreement New_1.pdf26 Feb 2024
PAN CardFile: 01 VCCPL Pan Card.pdf19 Feb 2024
Details of encumbrances concerned to FinanceFile: No Financial and Legal Encumbrances.pdf19 Feb 2024
Details of encumbrances concerned to LegalFile: No Financial and Legal Encumbrances.pdf19 Feb 2024
Commencement Certificates / NA Order for plotted developmentFile: 04 Commencement Certificate Vishal Complex E wing.pdf19 Feb 2024
Declaration about Commencement CertificateFile: Declaration About Commencement Certificate updated.pdf19 Feb 2024
Declaration in FORM BFile: Form B Promotor.pdf19 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: ANNEXURE A- DILIP CHORDIYA.pdf19 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: ANNEXURE A- KUNAL CHORDIYA.pdf19 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: ANNEXURE A-VISHAL CHORDIYA.pdf19 Feb 2024
Proforma of Allotment letterFile: Allotment Letter Annexure 1.pdf19 Feb 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Seperate Bank Decleration.pdf19 Feb 2024

How this compares with Pune

0%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 12 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Vishal Complex E Wing on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kundan Nagar Kasarwadi13,700+ in Pune

2 kmVishal Complex E WingCompleted 24Lapsed / revoked 21Other 24Dot size: filed unitsN

Filed coordinates, straight-line distance. 69 registered projects within 2 km.

Builder: VISHAL CHORDIYA CONSTRUCTIONS PRIVATE LIMITED

VISHAL CHORDIYA CONSTRUCTIONS PRIVATE LIMITED has 1 registration on MahaRERA, including Vishal Complex E Wing. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Vishal Complex E Wing is delayed beyond 31 Mar 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Vishal Complex E Wing?

The registered promoter entity is VISHAL CHORDIYA CONSTRUCTIONS PRIVATE LIMITED, a company as per the filing. Its CIN U45201PN2003PTC018055 and GSTIN 27AABCV9574C1Z3 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Vishal Complex E Wing?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Vishal Complex E Wing?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Vishal Complex E Wing?

The professionals named in the filing: Architect: Mahendra Thakur; Engineer: Sunil Dhanpal Kognole; Engineer: Sanket Vitthal Jadhav; Chartered Accountant: CA Yogesh Katariya; Chartered Accountant: RMRA & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Vishal Complex E Wing?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Vishal Complex E Wing. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Vishal Complex E Wing to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.