Home / Browse projects / Pune, Maharashtra / SQUARE 9

Registered No litigation declared Mixed project

SQUARE 9

By SKYLINE BUILDERS & DEVELOPERS

RG-MH-17304 · RERA P52100029157 · Last updated on MahaRERA portal: 29 Apr 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 18 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2027Possession promisedmoved 18 months from the original
5 of 11Construction stages doneacross 2 buildings; furthest along: Staircases, 90%
85 of 105Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 102 documents Report an error

SQUARE 9 is a Mixed project by SKYLINE BUILDERS & DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100029157 on 3 May 2021. Possession is promised by 30 Jun 2027. The completion date has moved by 18 months from the original filing. 20 of the 105 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NameSQUARE 9
  • TypeMixed
  • Location
    • KASARWADI
    • BHOSARI
    • Haveli
    • Pune
    • 411034
  • Pincode411034
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100029157
  • ReraGenie IDRG-MH-17304

Builder

  • NameSKYLINE BUILDERS & DEVELOPERS
  • Entity typePartnership
  • PartnersRAJESH MOHAN GOHIL, AVINASH MOHAN GOHIL, UMESH KARSANBHAI TANK, AJAYKUMAR GOPALBHAI TANK
  • Other registrations2 more →
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredMay 2021First promiseDec 2025Revised toJun 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on3 May 2021
  • Promised completion30 Jun 2027
  • Revised completionRevised to 30 Jun 2027 (originally 25 Dec 2025)
  • Buildings1 building record
  • Documents filed102 files

Current status

19%20 of 105 units booked
70.3%Work done, per cost certificate

Figures as on 29 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SQUARE 9NA77698104

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 29 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete across 2 buildings. The stage furthest along is Staircases, at 90%.

SQUARE 980%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises85%
Sanitary Fittings within the flats / premises30%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
NA Plot Without StructureNot stated
ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 29 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes90%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes90%
Storm Water DrainsYes75%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntYes25%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed342

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots342
Closed/Covered146
Open Space196

Land and ownership4

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,285 sq m
Land owned byThe promoter, with other names on the file
Named landowners4
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on4 Nov 2025
LandownerVillageDistrict
Rohidas Vishnu ChawvanPune (CB)Pune
Bhagwan Khandu ChawanPune (M Corp.)Pune
Kishor Vishnu ChavanWakadPune
Chandrakant Parshuram ChavanPune (M Corp.)Pune

Approvals and building plan

Sanctioning authoritypimpri chinchwad municipal corporation
Permissible FSI4315.15
Proposed, not sanctioned2,989 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMARKET YARD, PUNE
Estimated costRs 11.40 cr
Cost incurredRs 8.01 cr
Work done70.26%
BuildingWingEstimatedIncurred
SQUARE 9NARs 11.40 crRs 8.01 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMR DAYANAND K SHINDE
EngineerMANISH M GOHIL
Chartered AccountantP P DAKLE & CO
Chartered AccountantS N KHANDELWAL AND CO
Chartered AccountantMANISH SURANA
PartnerRole in project
SKYLINE BUILDERS & DEVELOPERS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA03122518501Dec 2025 → Jun 2027

Reason as filed by the promoterDue to the condition of nationwide lockdown pertaining to the conditions of COVID -19 in 2021 the work in progress of the aforesaid project was largely impacted due to shortage of labour being specifically skilled labours and materials. Further, due to the said lapse of time and Post normalization due to reduced demands we are asking for an additional time being in form of extension for a period u/s 7(3) for completion of the said project ie revised date of completion be considered as 30/06/2027. Considering the interest of the allotees, we have also taken 61.11% consent out of the 18 Allottee

Litigation declared1

CaseCourtStatus
Commercial Suit/0000026/2021/2021District and Session Court PuneEXH FIVE REJECTED

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 May 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 22 Feb 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 22 Feb 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 22 Feb 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2027

Documents filed102

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 102 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1.pdf29 Apr 2026
Withdrawal Update Form 2File: FORM 2.pdf29 Apr 2026
Withdrawal Update Form 3File: FORM 3.pdf29 Apr 2026
Form 2A (FY 2024-2025)File: FORM 2A-FY2024-2025.pdf1 Apr 2026
Form 2A (FY 2023-2024)File: FORM 2A-FY2023-2024 REVISED.pdf1 Apr 2026
Withdrawal Update Form 1File: FORM 1.pdf5 Mar 2026
Withdrawal Update Form 2File: FORM 2.pdf5 Mar 2026
Withdrawal Update Form 3File: SIGNED FORM 3.pdf5 Mar 2026
Withdrawal Update Form 1File: FORM 1.pdf17 Feb 2026
Withdrawal Update Form 2File: FORM 2.pdf17 Feb 2026
Withdrawal Update Form 3File: SIGNED FORM 3.pdf17 Feb 2026
Withdrawal Update Form 1File: Withdrawal Application ARCHITECT.pdf3 Dec 2025
Withdrawal Update Form 2File: Withdrawal Application Form2 ENG.pdf3 Dec 2025
Withdrawal Update Form 3File: FORM 3_SIGNED.pdf3 Dec 2025
Form 5 (FY 2023-2024)File: SKYLINE FORM 5.pdf1 Dec 2025
Form 5 (FY 2024-2025)File: SKYLINE BUILDERS 2025.pdf1 Dec 2025
Withdrawal Update Form 1File: Withdrawal Application ARCHITECT.pdf19 Nov 2025
Withdrawal Update Form 2File: Withdrawal Application Form2 ENG.pdf19 Nov 2025
Withdrawal Update Form 3File: FORM 3_SIGNED.pdf19 Nov 2025
Form 1File: FORM 1.pdf30 Jul 2025
Form 2File: FORM 2.pdf30 Jul 2025
Form 3File: FORM 3.pdf30 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD.pdf30 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf20 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf20 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf20 Apr 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD.pdf20 Apr 2025
Layout approvalFile: 1-5.pdf22 Feb 2025
Layout approvalFile: 2-5.pdf22 Feb 2025
Layout approvalFile: 3-5.pdf22 Feb 2025
Layout approvalFile: 4-5.pdf22 Feb 2025
Layout approvalFile: 5-5.pdf22 Feb 2025
Building plan approval or NA orderFile: 1-5.pdf22 Feb 2025
Building plan approval or NA orderFile: 2-5.pdf22 Feb 2025
Building plan approval or NA orderFile: 3-5.pdf22 Feb 2025
Building plan approval or NA orderFile: 4-5.pdf22 Feb 2025
Building plan approval or NA orderFile: 5-5.pdf22 Feb 2025
Copy of Layout Approval (in case of layout)File: 2-5.pdf22 Feb 2025
Copy of Layout Approval (in case of layout)File: 3-5.pdf22 Feb 2025
Copy of Layout Approval (in case of layout)File: 4-5.pdf22 Feb 2025
Copy of Layout Approval (in case of layout)File: 5-5.pdf22 Feb 2025
Copy of Layout Approval (in case of layout)File: 1-5.pdf22 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf22 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE.pdf22 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Q2.pdf22 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf22 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Q2.pdf22 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf22 Feb 2025
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE.pdf22 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: 1-5.pdf22 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: 2-5.pdf22 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: 3-5.pdf22 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: 4-5.pdf22 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: 5-5.pdf22 Feb 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD.pdf22 Feb 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD.pdf22 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT CERTIFICATE.pdf12 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form - 2 ENGINEERS CERTIFICATE.pdf12 Jul 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory 2023-2024 REVISED.pdf12 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM -3 CA CERTIFICATE.pdf12 Jul 2024
Details of encumbrances concerned to FinanceFile: LEGAL Encumbrances.pdf3 Jul 2024
Details of encumbrances concerned to LegalFile: LEGAL Encumbrances.pdf3 Jul 2024
Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMENT CERTIFICATE.pdf3 Jul 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD BOOKED UNSOLD INVENTERIES.pdf3 Jul 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in Other Real Estate Organizations.pdf3 Jul 2024
Deviation Report with respect to Allotment letterFile: Deviation Report.pdf3 Jul 2024
Deviation Report with respect to model copy of AgreementFile: Deviation Report.pdf3 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA CERT SKYLINE.pdf20 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A - Quality Assurance Certificate New (FY2022-2023).pdf10 Apr 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory.pdf10 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Adobe Scan 18 Mar 2024.pdf18 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA CERTIFICATE compressed.pdf31 Jan 2024
Other - FinanceFile: 20231230185842_compressed (1).pdf31 Jan 2024
Other - FinanceFile: DECLARATION TO RERA ABOUT CREDIT FACILITY.pdf31 Jan 2024
Copy of the legal title reportFile: Search Report New.pdf29 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A - Quality Assurance Certificate New.pdf30 Mar 2023
CERSAI detailsFile: credai certificate.pdf24 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 pg1 (1)_merged.pdf24 Mar 2023
Proforma of Agreement for saleFile: Agreement- Survey No.pdf24 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE.pdf8 Aug 2022

How this compares with Pune

19%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 18 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SQUARE 9 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BHOSARI13,700+ in Pune

2 kmSQUARE 9Completed 116Lapsed / revoked 117Other 35Dot size: filed unitsN

Filed coordinates, straight-line distance. 268 registered projects within 2 km.

Builder: SKYLINE BUILDERS & DEVELOPERS

SKYLINE BUILDERS & DEVELOPERS has 3 registrations on MahaRERA, including SQUARE 9 and Silver Oak Prime. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if SQUARE 9 is delayed beyond 30 Jun 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SQUARE 9?

The registered promoter entity is SKYLINE BUILDERS & DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SQUARE 9?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SQUARE 9?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SQUARE 9?

The professionals named in the filing: Architect: MR DAYANAND K SHINDE; Engineer: MANISH M GOHIL; Chartered Accountant: P P DAKLE & CO; Chartered Accountant: S N KHANDELWAL AND CO; Chartered Accountant: MANISH SURANA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SQUARE 9?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SQUARE 9. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SQUARE 9 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.