Home / Browse projects / Mumbai Suburban, Maharashtra / Vile Parle Shiv Swami Kripa Cooperative Housing Society Limited

Registered No litigation declared Residential / Group Housing project

Vile Parle Shiv Swami Kripa Cooperative Housing Society Limited

By Relcon Infraprojects Ltd

RG-MH-12251 · RERA P51800001893 · Last updated on MahaRERA portal: 30 Apr 2025

Source: official MahaRERA filing

Red flags

  • Completion date moved by 96 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedmoved 96 months from the original
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 93 documents Report an error

Vile Parle Shiv Swami Kripa Cooperative Housing Society Limited is a Residential / Group Housing project by Relcon Infraprojects Ltd in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800001893 on 29 Jul 2017. Possession is promised by 31 Dec 2027. The completion date has moved by 96 months from the original filing.

At a glance

Project

  • NameVile Parle Shiv Swami Kripa Cooperative Housing Society Limited
  • TypeResidential / Group Housing
  • Location
    • Andheri
    • Mumbai Suburban
    • 400057
  • Pincode400057
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800001893
  • ReraGenie IDRG-MH-12251

Builder

  • NameRelcon Infraprojects Ltd
  • Entity typeCompany
  • Managing DirectorRakesh Pravin Shah
  • DirectorsTejas Pravin Shah, Jainendra Pravin Shah, Dipan Pravin Shah
  • Other registrations2 more →
  • Completed2 of 3
  • Declared earlier projects2 →

Key dates

this monthRegisteredJul 2017First promiseDec 2019Revised toDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on29 Jul 2017
  • Promised completion31 Dec 2027
  • Revised completionRevised to 31 Dec 2027 (originally 31 Dec 2019)
  • Buildings1 building record
  • Documents filed93 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Vile Parle Shiv Swami Kripa Cooperative Housing Society limitedNA90000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 30 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

Vile Parle Shiv Swami Kripa Cooperative Housing Society limited: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 30 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes100%

Parking filed6

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots6
Closed/Covered1
Open Space5

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area492 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI948.99
Proposed, not sanctioned949 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNear Suncity Theater Vile Parle East Mumbai 400057

Certifying professionals and partners

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

PartnerRole in project
Relcon Infraprojects Ltd-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800026021Dec 2019 → Dec 2027

Reason as filed by the promoterRespected Sir/Madam, We hereby submit an application for extension under Section 7(3) of the RERA Act, 2016, for the project "Vile Parle Shiv Swami Kripa CHS Ltd." located at Tejpal Road No. 3, Vile Parle (East), Mumbai-400057. Project Completion: The project was fully completed in August 2014, with all amenities and facilities. Vacant possession of the flats was handed over to members and purchasers prior to the implementation of the RERA Act. Occupation Certificate Delay: The Occupation Certificate (OC) application was submitted to MCGM on 16.06.2014. However, issuance of the OC has been del

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 21 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Jan 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Jan 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 21 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed93

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 93 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form - 1 - Architect Certificate.pdf30 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form -1.pdf30 Apr 2025
Certificates of CA (Form 3)File: RERA Form 3 - Vile Parle Shiv Swami Kripa Mar 2025 - 1.pdf30 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form - 2 Shiv Swami Kripa CHS (2).pdf30 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form - 2 - Vile Parle Shiv Swami Kripa CHS .pdf30 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: RERA Form 5 - Vile Parle Shiv Swami Kripa Mar 2025.pdf30 Apr 2025
Other - TechnicalFile: CPM.pdf6 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form - 5 - Shiv Swami CHS.pdf20 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 For FY 23-24.pdf20 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 LAtest.pdf19 Feb 2025
Certificates of CA (Form 3)File: Form 3 Dcember 2017 Final.pdf19 Feb 2025
Certificates of CA (Form 3)File: Form 3 Dcember 2024 Final.pdf19 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Latest.pdf19 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A 19-20.pdf19 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A 20-21.pdf19 Feb 2025
Disclosure of sold/ booked inventoryFile: Circular 29 Revised.pdf19 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: 2 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22).pdf19 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A 21-22.pdf19 Feb 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: DIN.pdf19 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23).pdf19 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 22-23.pdf19 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23).pdf19 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A 23-24.pdf19 Feb 2025
Disclosure for secured/unsecured finance availed for the projectFile: Disclosure of Secured Unsecured.pdf19 Feb 2025
Layout approvalFile: Plan 4.pdf29 Jan 2025
Building plan approvalFile: IOD.pdf29 Jan 2025
Building plan approvalFile: Plan 1.pdf29 Jan 2025
Building plan approvalFile: Plan 2.pdf29 Jan 2025
Building plan approvalFile: Plan 3.pdf29 Jan 2025
Building plan approvalFile: Plan 4.pdf29 Jan 2025
Copy of Layout Approval (in case of layout)File: Plan 4.pdf29 Jan 2025
Building Plan Approval (IOD)File: Plan 4.pdf29 Jan 2025
Building Plan Approval (IOD)File: Plan 3.pdf29 Jan 2025
Building Plan Approval (IOD)File: Plan 2.pdf29 Jan 2025
Building Plan Approval (IOD)File: IOD.pdf29 Jan 2025
Building Plan Approval (IOD)File: Plan 1.pdf29 Jan 2025
Declaration in FORM BFile: Form - B - Shiv Swami Kripa CHS.pdf15 Jan 2025
Disclosure of sold/ booked inventoryFile: Circular 29.pdf15 Jan 2025
Declaration about Commencement CertificateFile: CC Declaration.pdf15 Jan 2025
CERSAI detailsFile: CERSAI.pdf15 Jan 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A.pdf15 Jan 2025
Details of encumbrances concerned to FinanceFile: Litigation list - Shiv Swami Kripa CHDS.pdf24 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Shiv Swami form - 1 June 2023.pdf24 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Shiv Swami form - 1 September 2023.pdf24 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Shiv Swami form 1 December 2023.pdf24 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Shiv Swami form - 1 MArch 2024.pdf24 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Shiv Swami form - 1 June 2024.pdf24 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Shiv Swami form - 1 September 2024.pdf24 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form - 2 - Shiv Swami - 20-10-24.pdf24 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form - 2 - Shiv Swami - 20-07-24.pdf24 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form - 2 - Shiv Swami - 20-04-24.pdf24 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form - 2- Shiv Swami - 20-01-24.pdf24 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Shiv Swami - 20-10-23.pdf24 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Shiv Swami - 01-07-23.pdf24 Dec 2024
Details of encumbrances concerned to LegalFile: Litigation list - Shiv Swami Kripa CHDS.pdf24 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1-Shiv swami - 2023.pdf20 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2 - 20-21.pdf20 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: form 2 - Shiv swami - 2023.pdf20 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form-5_Shivswami.pdf20 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - March, 2018.pdf8 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - March, 2019.pdf8 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1 - March, 2020.pdf8 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form - 1 March, 2021.pdf8 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form - 1 March, 2022.pdf8 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form - 1 Dec, 2022.pdf8 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form - 2- 17 -18.pdf8 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - 18 -19.pdf8 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2 - 19 -20.pdf8 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 5 - 20-21.pdf8 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form - 2 - 21-22.pdf8 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: form 2 - April, 2022 - Dec, 2022.pdf8 Feb 2023
Annual Audit Report of Statutory CA (Form 5)File: Form 5 - 17 to 18.pdf8 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 2 - 18 -19.pdf8 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 19 -20.pdf8 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 2 - 19 -20.pdf8 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 19 -20.pdf8 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 - 20-21.pdf8 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 - 21-22.pdf8 Feb 2023
OtherFile: architect pravin kanekar.pdf30 Mar 2021
Annual Audit Report of Statutory CA (Form 5)File: RERA FORM 5 CA Certificate - Shiv Swami Kripa Project.pdf19 Aug 2019

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Rajat Dhaulagiri Cooperative Housing Society limitedCTS 282 Shahaji Raje Marg Vile Parle East Mumbai Maharashtra India71CompletedOct 2014Late, Sep 2015
Vishranti Co-operative Housing Society limitedFinal Plot 208 TPS II Village Vile Parle East Dixit Road Mumbai- 400057 Maharasahtra India15CompletedAug 2013Late, Oct 2014

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one moved by 96 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Vile Parle Shiv Swami Kripa Cooperative Hous on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Andheri6,700+ in Mumbai Suburban

2 kmVile Parle Shiv Swami KrCompleted 139Lapsed / revoked 69Other 135Dot size: filed unitsN

Filed coordinates, straight-line distance. 343 registered projects within 2 km.

Builder: Relcon Infraprojects Ltd

Relcon Infraprojects Ltd has 3 registrations on MahaRERA, including Vile Parle Kalpavriksha cooperative Housing Society Limited and Vile Parle Shiv Swami Kripa Cooperative Housing Society Limited. Its filings disclose 2 earlier MahaRERA projects: declares 0 of 2 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Vile Parle Shiv Swami Kripa Cooperative Housing Society Limited is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Vile Parle Shiv Swami Kripa Cooperative Housing Society Limited?

The registered promoter entity is Relcon Infraprojects Ltd, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Vile Parle Shiv Swami Kripa Cooperative Housing Society Limited?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Vile Parle Shiv Swami Kripa Cooperative Housing Society Limited?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

What should I check before booking in Vile Parle Shiv Swami Kripa Cooperative Housing Society Limited?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Vile Parle Shiv Swami Kripa Cooperative Housing Society Limited. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Vile Parle Shiv Swami Kripa Cooperative Hous to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.