ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / SHREE BALAJI EMPIRE

Registered No litigation declared Others project

SHREE BALAJI EMPIRE

By SHUBHAM HOUSING

RG-MH-06404 · RERA P51700054916 · Last updated on MahaRERA portal: 30 Jun 2026

Source: official MahaRERA filing

Red flags

  • Rs 40.00 crore secured on the land, in favour of AU SMALL FINANCE BANK LIMITED

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2030Possession promisedno revision filed
6 of 11Construction stages donefurthest along: Internal walls, 88%
121 of 234Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 103 documents Report an error

SHREE BALAJI EMPIRE is a Others project by SHUBHAM HOUSING in Thane, Maharashtra, registered with MahaRERA as P51700054916 on 15 Feb 2024. Possession is promised by 31 Dec 2030. 113 of the 234 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete.

At a glance

Project

  • NameSHREE BALAJI EMPIRE
  • TypeOthers
  • Location
    • DEEPAK HOSPITAL LANE
    • BHAYANDER EAST
    • Mira-Bhayandar (M Corp.)
    • Thane
    • 401105
  • Pincode401105
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700054916
  • ReraGenie IDRG-MH-06404

Builder

  • NameSHUBHAM HOUSING
  • Entity typePartnership
  • PartnersRAKESH MANGILAL JAIN, PRATIK S JAIN, PANKAJ AMBALAL JAIN, AMBALAL SHREELAL JAIN, KESHULAL TEJPAL MEHTA, SHANKARLAL MODILAL JAIN, MANGILAL BHERULAL JAIN

Key dates

this monthRegisteredFeb 2024PromisedDec 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on15 Feb 2024
  • Promised completion31 Dec 2030
  • Revised completionNone
  • Buildings1 building record
  • Documents filed103 files

Current status

48%113 of 234 units booked
68.0%Work done, per cost certificate

Figures as on 30 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SHREE BALAJI EMPIRE BUILDING NO 1, SALE BUILDING PLOT ANA211717163234

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 30 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 88%.

SHREE BALAJI EMPIRE BUILDING NO 1, SALE BUILDING PLOT A: 63% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises88%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 30 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed86

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots86
Open Space86

Land and ownership1

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area5,376 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared present
Charge in favour ofAU SMALL FINANCE BANK LIMITED
Secured amountRs 40.00 crore
CERSAI search filedYes
Declared on10 Sep 2024
LandownerVillageDistrict
GUJARAT REALTORSMira-Bhayandar (M Corp.)Thane

Approvals and building plan

Sanctioning authorityMIRA BHAYANDER MUNICIPLE CORPORATION
Permissible FSI22796.69
Proposed, not sanctioned13,990 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO 16 GR FLOOR KANAKIIA ZILLION LBS CST ROAD JUNCTION
Estimated costRs 75.00 cr
Cost incurredRs 51.00 cr
Work done68.0%
BuildingWingEstimatedIncurred
SHREE BALAJI EMPIRE BUILDING NO 1, SALE BUILDING PLOT ANARs 75.00 crRs 51.00 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMARIO E CORREA
EngineerRAJESH B DUBEY
EngineerPRATIK SHANTILAL JAIN
Chartered AccountantSHWETA B JAIN
Chartered AccountantANIL PATWA
PartnerRole in project
SHUBHAM HOUSING-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 11 Jan 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 1 Aug 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 1 Aug 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 22 Dec 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2030

Documents filed103

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 103 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: FORM 1-Q2-2024-25.pdf30 Jun 2026
Form 2File: FORM 2-Q2-2024-25.pdf30 Jun 2026
Form 3File: form 3 shubham housing q2-2024-25.pdf30 Jun 2026
Disclosure of Sold and Booked InventoryFile: SHUBHAM HOUSING - SOLD UNSOLD -q2-2024.pdf30 Jun 2026
Form 1File: MARIO CORREA CERTIFICAT - FORM 1.pdf30 Jun 2026
Form 2File: PROTECH CONSULATNTS - ENGINEER FROM 2.pdf30 Jun 2026
Form 3File: shubham housing form 3-q3_31-12-2024.pdf30 Jun 2026
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD - SHUBHAM-1MB SCAN.pdf30 Jun 2026
Form 3File: FORM 3 310324.pdf30 Jun 2026
Form 1File: ARCHITECH CERTIFICATE FORM 1.pdf30 Jun 2026
Form 2File: FORM 2 ENGINEER CERTIFICATE.pdf30 Jun 2026
Disclosure of Sold and Booked InventoryFile: SOLD BOOK.pdf30 Jun 2026
Form 1File: form1.pdf30 Jun 2026
Form 2File: form 2 q1 24-25.pdf30 Jun 2026
Form 3File: shubham housing form 3-Q1 2024-25 (2).pdf30 Jun 2026
Disclosure of Sold and Booked InventoryFile: shubham housing sold or unsold-2024 q1.pdf30 Jun 2026
Withdrawal Update Form 1File: MARIO CORREA CERTIFICATE - FORM 1.pdf30 Jun 2026
Withdrawal Update Form 2File: PROTECH CONSULTANT - FORM 2.pdf30 Jun 2026
Withdrawal Update Form 3File: Shubham Housing Form 3 310326.pdf30 Jun 2026
Form 2A (FY 2023-2024)File: pratik jain - superviser certificate 23-24.pdf25 Jun 2026
Withdrawal Update Form 1File: MARIO CORREA CERTIFICATE - FORM 1.pdf20 Apr 2026
Withdrawal Update Form 2File: PROTECH CONSULTANT - FORM 2.pdf20 Apr 2026
Withdrawal Update Form 3File: Shubham Housing Form 3 310326.pdf20 Apr 2026
Form 2A (FY 2025-2026)File: SUPERVISOR CERTIFICATE 2025-26 (1).pdf20 Apr 2026
Withdrawal Update Form 1File: MARIO CORREA CERTIFICATE - FORM 1.pdf4 Feb 2026
Withdrawal Update Form 2File: PROTECH CONSULTANT - FORM 2.pdf4 Feb 2026
Withdrawal Update Form 3File: FORM 3 shubham HOUSING 31122025.pdf4 Feb 2026
Form 2A (FY 2024-2025)File: SUPERVISOR CERTIFICATE 2024-25.pdf18 Nov 2025
Withdrawal Update Form 1File: MARIO CORREA CERTIFICATE - FORM 1.pdf21 Oct 2025
Withdrawal Update Form 2File: PROTECH CONSULTANTS - FORM 2.pdf21 Oct 2025
Withdrawal Update Form 3File: FORM 3 SHUBHAM HOUSING 30-09-2025_compressed.pdf21 Oct 2025
Withdrawal Update Form 1File: MARIO CORREA CERTIFICATE - FORM 1.pdf18 Oct 2025
Withdrawal Update Form 2File: PROTECH CONSULTANTS FORM - 2.pdf18 Oct 2025
Withdrawal Update Form 3File: FORM 3 SHUMBHAM HOUSING 30-06-2025_compressed.pdf18 Oct 2025
Form 5 (FY 2024-2025)File: SHUBHAM HOU MARP & ASSOCIATES.pdf4 Oct 2025
Form 1File: FORM - 1 MARIO CORREA.pdf13 Jun 2025
Form 2File: FORM 2 PROTECH CONSULTANTS.pdf13 Jun 2025
Form 3File: shubham housing from -3.pdf13 Jun 2025
Disclosure of Sold and Booked InventoryFile: 1 MB JAN'25 TO MAR'25.pdf13 Jun 2025
Form 5 (FY 2023-2024)File: Form 5 SHUBHAM HOUSING.pdf13 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: from-3 shubham housing.pdf26 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM - 1 MARIO CORREA.pdf18 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 PROTECH CONSULTANTS.pdf18 Apr 2025
Disclosure of sold/ booked inventoryFile: 1 MB JAN'25 TO MAR'25.pdf18 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 SHUBHAM HOUSING.pdf20 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: shubham housing form 3-q3_31-12-2024.pdf22 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: MARIO CORREA CERTIFICAT - FORM 1.pdf21 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: PROTECH CONSULATNTS - ENGINEER FROM 2.pdf21 Jan 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD - SHUBHAM-1MB SCAN.pdf21 Jan 2025
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: FORMAT A.pdf8 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-Q2-2024-25.pdf30 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 shubham housing q2-2024-25.pdf30 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2-Q2-2024-25.pdf30 Oct 2024
Disclosure of sold/ booked inventoryFile: SHUBHAM HOUSING - SOLD UNSOLD -q2-2024.pdf30 Oct 2024
Details of encumbrances concerned to FinanceFile: ENCUMBRANCE LETTER -RERA.pdf9 Oct 2024
Details of encumbrances concerned to LegalFile: ENCUMBRANCE LETTER -RERA.pdf9 Oct 2024
Proforma of Agreement for saleFile: Final Sale Agreement draft shubham (AU BANK).pdf9 Oct 2024
Disclosure of sold/ booked inventoryFile: shubham housing sold or unsold-2024 q1.pdf14 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: shubham housing form 3-Q1 2024-25 (2).pdf5 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: housing form 1-Q1-2024-25-date 22-07-2024.pdf22 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER FORM-2 Q1 -2024-24.pdf21 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: pratik jain - superviser certificate.pdf9 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: shubham housing form 3.pdf9 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECH CERTIFICATE FORM 1.pdf24 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGINEER CERTIFICATE.pdf24 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 FOR RERA (1).pdf25 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 25012024.pdf25 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 FINAL.pdf25 Jan 2024
Copy of the legal title reportFile: ZONE.pdf11 Jan 2024
Copy of the legal title reportFile: INDEX.pdf11 Jan 2024
Copy of the legal title reportFile: GUJRAT REALTORS .pdf11 Jan 2024
Other - LegalFile: GUJRAT REALTORS .pdf11 Jan 2024
Other - LegalFile: INDEX.pdf11 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: appendix f.pdf22 Dec 2023
CERSAI detailsFile: Cersai .pdf22 Aug 2023
Layout approvalFile: LAYOUT PLAN 2021_11zon.pdf1 Aug 2023
Building plan approvalFile: TYPICAL.pdf1 Aug 2023
Building plan approvalFile: REFUSE AND EX.pdf1 Aug 2023
Building plan approvalFile: PODIUM AND UP.pdf1 Aug 2023
Building plan approvalFile: FIRST.pdf1 Aug 2023

How this compares with Thane

48%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHREE BALAJI EMPIRE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BHAYANDER EAST7,600+ in Thane

2 kmSHREE BALAJI EMPIRECompleted 84Lapsed / revoked 70Other 80Dot size: filed unitsN

Filed coordinates, straight-line distance. 234 registered projects within 2 km.

Builder: SHUBHAM HOUSING

SHUBHAM HOUSING has 1 registration on MahaRERA, including SHREE BALAJI EMPIRE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if SHREE BALAJI EMPIRE is delayed beyond 31 Dec 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHREE BALAJI EMPIRE?

The registered promoter entity is SHUBHAM HOUSING, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHREE BALAJI EMPIRE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHREE BALAJI EMPIRE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHREE BALAJI EMPIRE?

The professionals named in the filing: Architect: MARIO E CORREA; Engineer: RAJESH B DUBEY; Engineer: PRATIK SHANTILAL JAIN; Chartered Accountant: SHWETA B JAIN; Chartered Accountant: ANIL PATWA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHREE BALAJI EMPIRE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHREE BALAJI EMPIRE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHREE BALAJI EMPIRE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.