Red flags
- Completion date moved by 24 months
- 2 extensions taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
VASUDEV PARADISE is a Others project by ARISTONE DEVELOPERS in Thane, Maharashtra, registered with MahaRERA as P51700021181 on 14 Jun 2019. Possession is promised by 31 Jan 2027. The completion date has moved by 24 months from the original filing. 171 of the 177 units on this registration are recorded sold or booked, and 8 of 11 construction stages are filed complete.
At a glance
Project
- NameVASUDEV PARADISE
- TypeOthers
- Location
- THANE
- Thane (M Corp.)
- 401105
- Pincode401105
- RERA no.P51700021181
- ReraGenie IDRG-MH-03391
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on14 Jun 2019
- Promised completion31 Jan 2027
- Revised completionRevised to 31 Jan 2027 (originally 31 Jan 2025)
- Buildings1 building record
- Documents filed101 files
Current status
Figures as on 22 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| VASUDEV PARADISE WING A | NA | 25 | 23 | 165 | 12 | 177 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 22 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
8 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 94%.
VASUDEV PARADISE WING A: 81% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 94% |
Progress on shared amenities15
As on 22 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 80% |
| Water Supply | Yes | 60% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 90% |
| Storm Water Drains | Yes | 50% |
| Landscaping & Tree Planting | Yes | 50% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 90% |
| Electrical meter room, sub-station, receiving station | Yes | 90% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| VASUDEV PARADISE WING A | NA | Rs 62.70 cr | Rs 62.70 cr |
| - | NA | Rs 7.60 cr | Rs 7.28 cr |
Certifying professionals and partners7
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | ANISH & ASSOCIATES |
| Architect | Design Concepts |
| Engineer | SUBHASH SINGH |
| Engineer | NITESH B JADHAV |
| Engineer | DILIP SHARMA |
| Chartered Accountant | RD LUKAD AND CO |
| Chartered Accountant | RAMESH DHONDIRAM LUKAD |
| Partner | Role in project |
|---|---|
| ARISTONE DEVELOPERS | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoter1. The Promoter of above referred project is seeking one year extension under Section 7(3). 2. The Promoter has completed the civil work of the project. The finishing work of the project is going on and the Promoter shall apply to the planning authority i.e. Mira Bhayandar Municipal Corporation for Occupation Certificate of the Project shortly. 3. Under the above circumstances the Promoter seeks one year extension for the above referred project so that he can register the Agreement for sale of his unsold inventories with prospective purchasers by annexing the extension certificates to be grant
Reason as filed by the promoterWork Completed. Awating Approvals from Planning Authority i.e. Mira Bhayandar Municipal Corporation
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 7 Dec 2020 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 25 May 2019 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 21 May 2019 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 20 May 2019Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Jan 2027
Documents filed101
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 101 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Vasudev Paradise Arch June-26_0001.pdf | 22 Jul 2026 |
| Withdrawal Update Form 2File: FORM 2 VASUDEV PERADISE APRIL TO JUNE.pdf | 22 Jul 2026 |
| Withdrawal Update Form 3File: FORM 3 ARISTONE DEVELOPERS VASUDEV PARADIE.pdf | 22 Jul 2026 |
| Form 2A (FY 2025-2026)File: form 2a.pdf | 20 Jul 2026 |
| Form 5 (FY 2025-2026)File: FORM 5 ARISTONE DEVELOPERS 2025-26.pdf | 20 Jul 2026 |
| Withdrawal Update Form 1File: Form 1.pdf | 24 Apr 2026 |
| Withdrawal Update Form 2File: Form- 2.pdf | 24 Apr 2026 |
| Withdrawal Update Form 3File: CA Certificate_compressed.pdf | 24 Apr 2026 |
| Form 5 (FY 2019-2020)File: 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20).pdf | 14 Mar 2026 |
| Form 5 (FY 2020-2021)File: 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21).pdf | 14 Mar 2026 |
| Form 5 (FY 2021-2022)File: 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22).pdf | 14 Mar 2026 |
| Form 5 (FY 2022-2023)File: 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23).pdf | 14 Mar 2026 |
| Form 5 (FY 2023-2024)File: 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24).pdf | 14 Mar 2026 |
| Withdrawal Update Form 1File: VASUDEV HEIGHTS.pdf | 17 Jan 2026 |
| Withdrawal Update Form 2File: FORM 2.pdf | 17 Jan 2026 |
| Withdrawal Update Form 3File: FORM 3_compressed (1).pdf | 17 Jan 2026 |
| Form 2A (FY 2019-2020)File: 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20).pdf | 17 Jan 2026 |
| Form 2A (FY 2020-2021)File: 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21).pdf | 17 Jan 2026 |
| Form 2A (FY 2023-2024)File: 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24).pdf | 17 Jan 2026 |
| Form 2A (FY 2024-2025)File: Form 2A 13.01.2026.pdf | 17 Jan 2026 |
| Form 5 (FY 2024-2025)File: Form 5.pdf | 14 Jan 2026 |
| Withdrawal Update Form 1File: VASUDEV HEIGHTS.pdf | 30 Dec 2025 |
| Withdrawal Update Form 1File: VASUDEV HEIGHTS.pdf | 30 Dec 2025 |
| Withdrawal Update Form 2File: vasudev paradise Engineer certificate sept 25.pdf | 30 Dec 2025 |
| Withdrawal Update Form 2File: vasudev paradise Engineer certificate sept 25.pdf | 30 Dec 2025 |
| Withdrawal Update Form 3File: ARISTONE DEV.pdf | 30 Dec 2025 |
| Withdrawal Update Form 3File: ARISTONE DEV.pdf | 30 Dec 2025 |
| Withdrawal Update Form 1File: VASUDEV HEIGHTS.pdf | 13 Nov 2025 |
| Withdrawal Update Form 2File: vasudev paradise Engineer certificate sept 25.pdf | 13 Nov 2025 |
| Withdrawal Update Form 3File: ARISTONE DEV.pdf | 13 Nov 2025 |
| Withdrawal Update Form 1File: VASUDEV HEIGHTS.pdf | 23 Jul 2025 |
| Withdrawal Update Form 2File: VASUDE PARADISE_ENGINERRRR.pdf | 23 Jul 2025 |
| Withdrawal Update Form 3File: ARISTONE DEVELOPERS.pdf | 23 Jul 2025 |
| Certificates of CA (Form 3)File: aristone developers_0001_compressed (1)_compressed.pdf | 21 Feb 2025 |
| Declaration in FORM BFile: Affidavit cum Declaration Latest.pdf | 20 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Aristone Developers Architect Certifiate.pdf | 20 Feb 2025 |
| Certificates of CA (Form 3)File: aristone developers_0001 (1)_compressed.pdf | 20 Feb 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Aristone Developers Engineer Certificate.pdf | 20 Feb 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Aristone Developers Engineer Certificate.pdf | 20 Feb 2025 |
| Other - TechnicalFile: Rera Extension.pdf | 20 Feb 2025 |
| Certificates of CA (Form 3)File: CA Form Revised.pdf | 6 Feb 2025 |
| Certificates of CA (Form 3)File: CA Form Revised (2).pdf | 6 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold List (2).pdf | 6 Feb 2025 |
| Details of encumbrances concerned to FinanceFile: Legal Encumberance.pdf | 5 Feb 2025 |
| Details of encumbrances concerned to LegalFile: Legal Encumberance.pdf | 5 Feb 2025 |
| Proforma of Agreement for saleFile: DRAFT AGREEMENT - Copy.pdf | 5 Feb 2025 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: Decaration about Bank Account.pdf | 11 Dec 2024 |
| Declaration in FORM BFile: Affidavit Cum Declaration.pdf | 26 Nov 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf | 26 Nov 2024 |
| Certificates of CA (Form 3)File: CA Certificate.pdf | 26 Nov 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.pdf | 26 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold List.pdf | 26 Nov 2024 |
| Declaration about Commencement CertificateFile: Declaration.pdf | 26 Nov 2024 |
| CERSAI detailsFile: Cersai Report and Undertaking.pdf | 26 Nov 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Real Estate.pdf | 26 Nov 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Engineer Quality Assurance.pdf | 26 Nov 2024 |
| Disclosure for secured/unsecured finance availed for the projectFile: Cersai Report and Undertaking.pdf | 26 Nov 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form - 5-ARISTONE.pdf | 2 May 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect's Certificate.pdf | 12 Apr 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer's Certificate.pdf | 12 Apr 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer's Certificate.pdf | 12 Apr 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf | 23 Sep 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.pdf | 23 Sep 2023 |
| Certificates of CA (Form 3)File: Form-3.pdf | 23 Sep 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5.pdf | 23 Sep 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect cert205.pdf | 3 Apr 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer cert209.pdf | 3 Apr 2023 |
| Certificates of CA (Form 3)File: Form 3_compressed.pdf | 3 Apr 2023 |
| Certificates of CA (Form 3)File: Form-3 (03-10-2022) (1).pdf | 10 Nov 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form-5 (03-10-2022) (2).pdf | 10 Nov 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate .pdf | 3 Oct 2022 |
| Proforma of Allotment letterFile: Draft Aristone rera flat agreement Final copy.pdf | 29 Sep 2021 |
| Declaration about Commencement CertificateFile: CC Declaration RERA Upload118.pdf | 19 Aug 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2 Site Engineer Quater ending June 21_compressed.pdf | 19 Aug 2021 |
| Disclosure of sold/ booked inventoryFile: Sol Unsold List RERA Upload117_compressed.pdf | 19 Aug 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Aristone Developers (01-04-2020 to 31-03-2021).pdf | 19 Aug 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Site Engineer082.pdf | 21 May 2021 |
| Certificates of CA (Form 3)File: CA Certificate.pdf | 21 May 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: no progress compressed.pdf | 27 Jan 2021 |
| Certificates of CA (Form 3)File: Form 3 compressed.pdf | 27 Jan 2021 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration, which the RERA portal never shows together
- All 101 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep VASUDEV PARADISE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near THANE7,600+ in Thane
VIHANG LUXURIA
REYANSHP REALTY LLP
ESQUIRE
JP INFRA&SALASAR BUILDCON LLP
ANJANI BLISS
ANJANI KUMAR COMPANY PRIVATE LIMITED
SHREE BALAJI EMPIRE
SHUBHAM HOUSING
SMIT VISTA
SMIT MEGASTRUCTURES
INDRA NEEL
SONAM SPARK INFRA PRIVATE LIMITED
See every Thane project, with the district possession charts
Builder: ARISTONE DEVELOPERS
ARISTONE DEVELOPERS has 2 registrations on MahaRERA, including VASUDEV PARADISE and ENVIRO AFFINITY. Its filings disclose 1 earlier MahaRERA project, none completed yet. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What are my rights if VASUDEV PARADISE is delayed beyond 31 Jan 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of VASUDEV PARADISE?
The registered promoter entity is ARISTONE DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in VASUDEV PARADISE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for VASUDEV PARADISE?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at VASUDEV PARADISE?
The professionals named in the filing: Architect: ANISH & ASSOCIATES; Architect: Design Concepts; Engineer: SUBHASH SINGH; Engineer: NITESH B JADHAV; Engineer: DILIP SHARMA; Chartered Accountant: RD LUKAD AND CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in VASUDEV PARADISE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback