Home / Browse projects / Chandrapur, Maharashtra / VIGHNESH RESIDENCY
VIGHNESH RESIDENCY
RG-MH-85303 · RERA P50900019410 · Last updated on MahaRERA portal: 12 Apr 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 72 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Chandrapur registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
VIGHNESH RESIDENCY is a Others project by GAJANAN MORESHWAR NILAWAR in Chandrapur, Maharashtra, registered with MahaRERA as P50900019410 on 29 Jan 2019. Possession is promised by 31 Dec 2027. The completion date has moved by 72 months from the original filing. 19 of the 19 units on this registration are recorded sold or booked, and 11 of 11 construction stages are filed complete.
At a glance
Project
- NameVIGHNESH RESIDENCY
- TypeOthers
- Location
- DATALA ROAD
- CHANDRAPUR
- Chandrapur (M Cl)
- 442401
- Pincode442401
- MapView location on Google Maps (as filed on RERA)
- RERA no.P50900019410
- ReraGenie IDRG-MH-85303
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on29 Jan 2019
- Promised completion31 Dec 2027
- Revised completionRevised to 31 Dec 2027 (originally 30 Dec 2021)
- Buildings1 building record
- Documents filed69 files
Current status
Figures as on 12 Apr 2025, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| VIGHNESH RESIDENCY | NA | 5 | 5 | 12 | 7 | 19 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 12 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
11 of 11 construction stages are filed complete.
VIGHNESH RESIDENCY: 100% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 12 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 100% |
Parking filed6
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| VIGHNESH RESIDENCY | NA | Rs 3.25 cr | Rs 3.20 cr |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | VIKRANT BHUTE |
| Engineer | VIKRANT BHUTE |
| Engineer | SWAPNIL D BOKADE |
| Chartered Accountant | RIYA ROHAN UTTARWAR |
| Partner | Role in project |
|---|---|
| GAJANAN MORESHWAR NILAWAR | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterTo, The Maharashtra Real Estate Regulatory Authority (MahaRERA) Subject: Reply to Order No. MahaRERA/DC/LAO/221/2025 dated 07.02.2025 and Show cause notice dated 05.11.2024. Respected Authority, With reference to the Order No. MahaRERA/DC/LAO/221/2025 dated 07.02.2025 issued in relation to the real estate project "VIGHNESH RESIDENCY" (Registration No. P50900019410), I, GAJANAN MORESHWAR NILAWAR, the promoter of the said project, hereby submit the following reply for your kind consideration: 1. Delay in Completion & Non-Issuance of Occupancy Certificate: The project "VIGHNESH RESIDENCY" was san
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 14 Jan 2019 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 14 Jan 2019 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 14 Jan 2019 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 14 Jan 2019Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2027
Documents filed69
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 16 form 1 vignesh residency 31 mar 25.pdf | 12 Apr 2025 |
| Certificates of CA (Form 3)File: 16 form 3 vignesh residency 31 mar 25.pdf | 12 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 16 form 2 Q4 2024.pdf | 12 Apr 2025 |
| Declaration in FORM BFile: FORM B vignesh.pdf | 9 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 2 form 1 vignesh residency 31 mar 20.pdf | 31 Mar 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 1 form 1 vignesh residency 31 mar 19.pdf | 31 Mar 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 15 form 1 vignesh residency 31 dec 24.pdf | 31 Mar 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 14 form 1 vignesh residency 30 sept 24.pdf | 31 Mar 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 13 form 1 vignesh residency 30 june 24.pdf | 31 Mar 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 12 form 1 vignesh residency 31 mar 24.pdf | 31 Mar 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 11 form 1 vignesh residency 31 dec 23.pdf | 31 Mar 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 10 form 1 vignesh residency 30 sep 23.pdf | 31 Mar 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 9 form 1 vignesh residency 30 june 23.pdf | 31 Mar 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 8 form 1 vignesh residency 31 mar 23.pdf | 31 Mar 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 7 form 1 vignesh residency 31 Dec 22.pdf | 31 Mar 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 6 form 1 vignesh residency 31 sep 22.pdf | 31 Mar 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 5 form 1 vignesh residency 31 june 22.pdf | 31 Mar 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 4 form 1 vignesh residency 31 mar 22.pdf | 31 Mar 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 3 form 1 vignesh residency 31 mar 21.pdf | 31 Mar 2025 |
| Certificates of CA (Form 3)File: 15 form 3 vignesh residency 31 dec 24.pdf | 31 Mar 2025 |
| Certificates of CA (Form 3)File: 14 form 3 vignesh residency 30 sept 24.pdf | 31 Mar 2025 |
| Certificates of CA (Form 3)File: 13 form 3 vignesh residency 30 june 24.pdf | 31 Mar 2025 |
| Certificates of CA (Form 3)File: 12 form 3 vignesh residency 31 mar 24.pdf | 31 Mar 2025 |
| Certificates of CA (Form 3)File: 11 form 3 vignesh residency 30 dec 23.pdf | 31 Mar 2025 |
| Certificates of CA (Form 3)File: 10 form 3 vignesh residency 30 sept 23.pdf | 31 Mar 2025 |
| Certificates of CA (Form 3)File: 9 form 3 vignesh residency 30 june 23.pdf | 31 Mar 2025 |
| Certificates of CA (Form 3)File: 7 form 3 vignesh residency 30 dec 22.pdf | 31 Mar 2025 |
| Certificates of CA (Form 3)File: 6 form 3 vignesh residency 30 sept 22.pdf | 31 Mar 2025 |
| Certificates of CA (Form 3)File: 5 form 3 vignesh residency 30 june 22.pdf | 31 Mar 2025 |
| Certificates of CA (Form 3)File: 4 form 3 vignesh residency 31 mar 22.pdf | 31 Mar 2025 |
| Certificates of CA (Form 3)File: 3 form 3 vignesh residency 31 mar 21.pdf | 31 Mar 2025 |
| Certificates of CA (Form 3)File: 2 form 3 vignesh residency 31 mar 20.pdf | 31 Mar 2025 |
| Certificates of CA (Form 3)File: 1 form 3 vignesh residency 31 mar 19.pdf | 31 Mar 2025 |
| Certificates of CA (Form 3)File: 8 form 3 vignesh residency 31 mar 23.pdf | 31 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 8 form 2 2022.pdf | 31 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 15 form 2 Q3 2024.pdf | 31 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 14 form 2 Q2 2024.pdf | 31 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 13 form 2 Q1 2024.pdf | 31 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 12 form 2 Q4 2023.pdf | 31 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 11 form 2 Q3 2023.pdf | 31 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 10 form 2 Q2 2023.pdf | 31 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 9 form 2 Q1 2023.pdf | 31 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 7 form 2 2022.pdf | 31 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 6 form 2 2022.pdf | 31 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 5 form 2 2022.pdf | 31 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 4 form 2 2022.pdf | 31 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3 form 2 2021.pdf | 31 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 form 2 2020.pdf | 31 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1 form 2 2019.pdf | 31 Mar 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: FORM 5 18-19.pdf | 31 Mar 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5 19-20.pdf | 31 Mar 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 20-21.pdf | 31 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: disclosure of sold inventory vignesh residency.pdf | 31 Mar 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 21-22.pdf | 31 Mar 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 22-23.pdf | 31 Mar 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 23-24.pdf | 31 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form No 2 A.pdf | 29 Jan 2020 |
| Declaration in FORM BFile: Form B.pdf | 25 Jan 2019 |
| Proforma of Allotment letterFile: Agreement to sale.pdf | 23 Jan 2019 |
| Building plan approvalFile: Vighnesh Residency Sanction Plan.pdf | 14 Jan 2019 |
| Layout approvalFile: Order 1 (3 files merged).pdf | 14 Jan 2019 |
| PAN CardFile: PAN CARD.pdf | 14 Jan 2019 |
| Copy of the legal title reportFile: Search Report.pdf | 14 Jan 2019 |
| Details of encumbrancesFile: Encunbrances Letter.pdf | 14 Jan 2019 |
| Copy of Layout Approval (in case of layout)File: Order 1 (3 files merged).pdf | 14 Jan 2019 |
| Building Plan Approval (IOD)File: Vighnesh Residency Sanction Plan.pdf | 14 Jan 2019 |
| Commencement Certificates / NA Order for plotted developmentFile: Sanction 1 (2 files merged).pdf | 14 Jan 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf | 14 Jan 2019 |
| Certificates of CA (Form 3)File: CA Certificate.pdf | 14 Jan 2019 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| KAUSTUBH RESIDENCY-1 | AYYAPPA MANDIR ROAD CHANDRAPUR | 11 | Completed | May 2016 | Late, Jul 2016 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Chandrapur
Computed across the 220+ Chandrapur projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 4 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 69 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep VIGHNESH RESIDENCY on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near CHANDRAPUR220+ in Chandrapur
Filed coordinates, straight-line distance. 17 registered projects within 2 km.
CHAWHAN ROYALS
MANGESH RATILAL CHAWHAN
SINGH TOWER
SINGH BUILDCON & SOLUTIONS
CHAWHAN ROYALS TOWER-1
MANGESH RATILAL CHAWHAN
ATHARVA PLAZA
ATHARVA INFRA
GAJANAN PLAZA 4
S V BUILDERS
SKAND RESIDENCY
VAISHNAVI CONSTRUCTION
See every Chandrapur project, with the district possession charts
Builder: GAJANAN MORESHWAR NILAWAR
GAJANAN MORESHWAR NILAWAR has 5 registrations on MahaRERA, including GANESHA RESIDENCY and VIGHNAHARTA. Its filings disclose 2 earlier MahaRERA projects: declares 1 of 2 past projects completed on time. Read the full track record. See more projects on the Chandrapur district page.
Frequently asked questions
What are my rights if VIGHNESH RESIDENCY is delayed beyond 31 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of VIGHNESH RESIDENCY?
The registered promoter entity is GAJANAN MORESHWAR NILAWAR, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in VIGHNESH RESIDENCY?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for VIGHNESH RESIDENCY?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at VIGHNESH RESIDENCY?
The professionals named in the filing: Architect: VIKRANT BHUTE; Engineer: VIKRANT BHUTE; Engineer: SWAPNIL D BOKADE; Chartered Accountant: RIYA ROHAN UTTARWAR. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in VIGHNESH RESIDENCY?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback