New projects and RERA data in Chandrapur district, Maharashtra

228 of the projects in this build are in Chandrapur district: 4,319 units across them, 8 registered in the last 12 months. Sales and inventory trends accumulate from each future quarterly update; this page shows the first one.

228Projects in this build
8Registered, last 12 months
4,319Units declared
3,150Units not yet booked
24Completion dates revised
0With declared litigation

Of the 228 covered registrations, 24 have revised their promised completion date and 0 declare litigation. The median project here is 18% booked as of the current data. Every figure comes from the projects' own MahaRERA filings.

When Chandrapur projects promise possession

Promised possession year as filed by the builder with MahaRERA, split by what the registration says today. Of 228 projects with a promised date, 100 are recorded delivered, 36 are still on the register and 92 have a registration that has lapsed or been cancelled.

DeliveredOn the registerRegistration lapsed or cancelled

012253750today2017: 2 projects, delivered’172018: 14 projects, delivered’182019: 14 projects, delivered2019: 1 projects, registration lapsed or cancelled’192020: 5 projects, delivered2020: 5 projects, registration lapsed or cancelled’202021: 10 projects, delivered2021: 6 projects, registration lapsed or cancelled’212022: 18 projects, delivered2022: 19 projects, registration lapsed or cancelled’222023: 16 projects, delivered2023: 18 projects, registration lapsed or cancelled’232024: 8 projects, delivered2024: 25 projects, registration lapsed or cancelled’242025: 10 projects, delivered2025: 10 projects, registration lapsed or cancelled’252026: 1 projects, delivered2026: 7 projects, on the register2026: 7 projects, registration lapsed or cancelled’262027: 2 projects, delivered2027: 13 projects, on the register2027: 1 projects, registration lapsed or cancelled’272028: 8 projects, on the register’282029: 1 projects, on the register’292030: 5 projects, on the register’302031: 1 projects, on the register’312034: 1 projects, on the register’34

47 projects promise possession in 2026 or later. Facts as per filings on RERA website.

05001,0001,5002,000today’17’18’192020: 2 flats, delivered (only 1 of 10 projects filed a flat count)’202021: 20 flats, delivered (only 1 of 16 projects filed a flat count)’212022: 212 flats, delivered (only 14 of 37 projects filed a flat count)2022: 55 flats, registration lapsed or cancelled (only 14 of 37 projects filed a flat count)’222023: 392 flats, delivered (only 13 of 34 projects filed a flat count)2023: 57 flats, registration lapsed or cancelled (only 13 of 34 projects filed a flat count)’232024: 205 flats, delivered2024: 1,019 flats, registration lapsed or cancelled’242025: 118 flats, delivered2025: 225 flats, registration lapsed or cancelled’252026: 268 flats, on the register2026: 123 flats, registration lapsed or cancelled’262027: 34 flats, delivered2027: 151 flats, on the register2027: 20 flats, registration lapsed or cancelled’272028: 272 flats, on the register’282029: 30 flats, on the register’292030: 183 flats, on the register’302031: 41 flats, on the register’312034: 892 flats, on the register’34

2,014 flats are promised in 2026 or later, across the 72% of those projects that file a flat count. Hatched years are ones where most builders never filed a count, so the bar understates real supply and cannot be compared with the years beside it. Facts as per filings on RERA website.

How far Chandrapur possession dates have moved

Builders may revise the possession date they filed at registration. Each bar is the year a project first promised, split by how far that date has since moved. 24 of 228 projects (11%) have moved at least once; the median move is 18 months and the longest is 72 months.

Kept the original dateMoved by under 2 yearsMoved by 2 years or more

012253750Originally due 2017: 2 projects kept the original date, 100% of the year’17Originally due 2018: 14 projects kept the original date, 100% of the year’18Originally due 2019: 15 projects kept the original date, 68% of the yearOriginally due 2019: 5 projects moved by under 2 years, 23% of the yearOriginally due 2019: 2 projects moved by 2 years or more, 9% of the year’19Originally due 2020: 5 projects kept the original date, 83% of the yearOriginally due 2020: 1 projects moved by 2 years or more, 17% of the year’20Originally due 2021: 16 projects kept the original date, 89% of the yearOriginally due 2021: 1 projects moved by under 2 years, 6% of the yearOriginally due 2021: 1 projects moved by 2 years or more, 6% of the year’21Originally due 2022: 35 projects kept the original date, 81% of the yearOriginally due 2022: 4 projects moved by under 2 years, 9% of the yearOriginally due 2022: 4 projects moved by 2 years or more, 9% of the year’22Originally due 2023: 29 projects kept the original date, 94% of the yearOriginally due 2023: 1 projects moved by under 2 years, 3% of the yearOriginally due 2023: 1 projects moved by 2 years or more, 3% of the year’23Originally due 2024: 31 projects kept the original date, 97% of the yearOriginally due 2024: 1 projects moved by under 2 years, 3% of the year’24Originally due 2025: 16 projects kept the original date, 84% of the yearOriginally due 2025: 2 projects moved by under 2 years, 11% of the yearOriginally due 2025: 1 projects moved by 2 years or more, 5% of the year’25Originally due 2026: 11 projects kept the original date, 100% of the year’26Originally due 2027: 15 projects kept the original date, 100% of the year’27Originally due 2028: 8 projects kept the original date, 100% of the year’28Originally due 2029: 1 projects kept the original date, 100% of the year’29Originally due 2030: 4 projects kept the original date, 100% of the year’30Originally due 2031: 1 projects kept the original date, 100% of the year’31Originally due 2034: 1 projects kept the original date, 100% of the year’34

Read down a bar to see how much of that year's cohort held its promise. Facts as per filings on RERA website.

05001,0001,5002,000’17’18’19Originally due 2020: 2 flats kept the original date, 83% of the year (only 1 of 6 projects filed a flat count)’20Originally due 2021: 20 flats kept the original date, 89% of the year (only 2 of 18 projects filed a flat count)Originally due 2021: 19 flats moved by 2 years or more, 6% of the year (only 2 of 18 projects filed a flat count)’21Originally due 2022: 267 flats kept the original date, 81% of the year (only 17 of 43 projects filed a flat count)Originally due 2022: 59 flats moved by 2 years or more, 9% of the year (only 17 of 43 projects filed a flat count)’22Originally due 2023: 449 flats kept the original date, 94% of the year (only 13 of 31 projects filed a flat count)’23Originally due 2024: 1,198 flats kept the original date, 97% of the yearOriginally due 2024: 56 flats moved by under 2 years, 3% of the year’24Originally due 2025: 310 flats kept the original date, 84% of the yearOriginally due 2025: 50 flats moved by under 2 years, 11% of the year’25Originally due 2026: 285 flats kept the original date, 100% of the year’26Originally due 2027: 186 flats kept the original date, 100% of the year’27Originally due 2028: 272 flats kept the original date, 100% of the year’28Originally due 2029: 30 flats kept the original date, 100% of the year’29Originally due 2030: 183 flats kept the original date, 100% of the year’30Originally due 2031: 41 flats kept the original date, 100% of the year’31Originally due 2034: 892 flats kept the original date, 100% of the year’34

Hatched years are ones where most builders never filed a flat count, so the bar understates the real total. Read down a bar to see how much of that year's cohort held its promise. Facts as per filings on RERA website.

Projects in Chandrapur

ProjectDeveloperUnits BookedRegistered
Suvarnabhumi - A Project by SDPLSANDEEP DWELLERS PVT. LTD.89217%30 Oct 2024
GAURAV NAGARI 2PMG Associates16559%29 Jun 2021
Vaishno CityTushar Santosh Kumar Agarwal1588%15 Jun 2022
VAISHNO CITYTushar Santosh Kumar Agarwal1307%15 Jun 2022
CHAWHAN ROYALSMANGESH RATILAL CHAWHAN126100%14 Jan 2019
Krushna Sneha NagariAshok K. Bhaiyya ,Ajay D. Bhattad and Jivan B Kontamwar1186%15 Feb 2022
VAIBHAVLAXMI NAGARIMAITRI PLOTS AND CONSTRUCTION10476%18 Mar 2020
vaishno CityTushar Santosh Kumar Agarwal971%15 Jun 2022
G S HEIGHTSG S FORT REALTORS8933%10 May 2022
Vaishno cityTushar Santosh Kumar Agarwal7828%15 Jun 2022
MAULI PARKVInod P Dhoble, Savita A Chafale and Prakash S Jumde7723%7 Nov 2020
BALAJI TOWNSHRIHARI BUILDERS AND DEVELOPERS7515%3 Jan 2023
RAKESH YADAORAO RATNAWARRAKESH YADAORAO RATNAWAR700%15 Aug 2021
TADOBA ESTATEOffybee Properties6534%17 Oct 2024
Vyankatesh City 2Dipak Dasharath Urade and Sharad Dasharath Urade6219%3 Jul 2023
RISHI PLAZAPREMKUMAR SADHUMAL MULANI610%25 Aug 2025
NIKHIL PLANETJ K BUILDERS AND DEVELOPERS5650%28 Aug 2019
RIDDHI 55 VILLASVIBHA RAJESH THAKUR557%9 Sep 2025
SINGH TOWERSINGH BUILDCON & SOLUTIONS524%28 Mar 2025
vaishno cityTushar Santosh Kumar Agarwal5120%28 Jul 2022
NARAYAN NAGARIRAHUL NARAYANJI SHETIYE510%27 Dec 2023
Shree Ambaji NagarBhikubhai K Lodhiya ,Namitaben B lodhiya , Pankaj B Lodhiya, Varun B Lodhiya4914%10 Jan 2022
NEW MUSABHAI NAGAR - IIGulzar Kamruddin Dhamani480%10 Oct 2022
RIDDHI LEGACY TOWERSYUVRAJ RAJESH THAKUR484%26 Aug 2025
Astha NagriShakuntala Shamrao Urade4719%18 Feb 2021
MAULI PARK-2VInod P Dhoble, Savita A Chafale and Prakash S Jumde4743%27 Jan 2021
GAJANAN NAGARIR B INFRA460%2 Jul 2026
Bokade layoutMahendra Shrawanji Bokade & Others4139%19 Dec 2019
CHAWHAN ROYALS TOWER-1MANGESH RATILAL CHAWHAN410%18 Apr 2026
ATHARVA PLAZAATHARVA INFRA4010%16 Feb 2026
GAURAV NAGARISatish D Humne & Taufik N Pathan3887%28 Aug 2019
RAJWADA TOWNSHIP PHASE IISKYLINE BUILDERS AND DEVELOPERS3776%2 Mar 2021
9 Star Height9 Star Developers3711%7 Nov 2024
Shree Dutta Pushpa PlazaAtul Dattatry Gourshettiwar3617%3 Jul 2024
Urkude Nagari -2Manohar Marotrao Urkude359%11 Sep 2020
New Bramhapuri City-2Sarita Bhaskar Makode350%25 Aug 2022
GAJANAN PLAZA 4S V BUILDERS3468%3 Jan 2024
S.R. Developers-1S. R. Developers3476%29 Apr 2024
AK-FLORENZAANKLESH NATHUJI KHAIRE3272%2 Nov 2022
New Bramhapuri City-1Meena Diwakar Makode310%19 Aug 2022
RADHA HEIGHTSM/s SALASAR INFRA3119%3 Oct 2024
Namo Nagari Part - 1Amrapali Ravindra Meshram300%22 Sep 2020
Gaurav Nagari-4PMG Associates300%27 Jun 2023
SKAND RESIDENCYVAISHNAVI CONSTRUCTION300%15 Jun 2026
GAURAV NAGARI 3PMG Associates2945%20 Dec 2020
DELANWADIPrabhakar N Pilare and 4 others280%16 Feb 2022
CHAWHAN EMPIRECHAWHAN INFRATECH PRIVATE LIMITED2818%8 Jul 2025
Radha Krushna NagariAshok Kisanlal Bhaiyya2681%3 Dec 2021
SHREE VRUNDAVAN HEIGHTSNEETA RAMESHCHANDRA SHAH268%18 Mar 2026
Vaibhav Laxmi NagariGangadhar Harihar Bhupal250%9 Feb 2022
Shree Gurukrupa LayoutShree Gurukrupa Builders And Developers2592%11 Mar 2024
PILARE LAYOUTRajesh Deoraoji Pilare2467%10 Jan 2022
VASAVI DEVELOPERS GAT NO 801Vasavi Developers2383%15 Aug 2021
GAYATRI NAGARBANDU LAXMANRAO AHIRKAR23100%30 Mar 2021
Lalaji TownshipAbhishek Rajan Jaiswal230%24 Jan 2022
Gangaputra LayoutIndira Pramod Meshram220%8 Dec 2023
MATAI NAGARShri. Ashish Madanrao karande and Sau. Anjali Ashish Karande2060%15 Mar 2019
KSHITIJBLACK PEARL200%16 Jan 2021
Krushna Sneha NagariGaurav Ashok Bhaiyya and Ashok K. Bhaiyya2040%22 Feb 2022
TULIPANAYA INFRASTRUCTURE200%17 Oct 2024
VIGHNESH RESIDENCYGAJANAN MORESHWAR NILAWAR19100%29 Jan 2019
Lalaji TownshipRajan Pannalal Jaiswal1953%24 Jan 2022
LAXMI NAGRIVijay Tulsiram Yerne & Swapnil Ramesh Yerne180%20 Jun 2022
RIDDHI VENTURAVIBHA RAJESH THAKUR1828%22 Apr 2024
Sidheshwar Nagari-3Sidheshwar Bhaiyyaji Bharre1839%22 Apr 2024
Sidheshwar Nagari-2Sidheshwar Bhaiyyaji Bharre1729%4 Apr 2024
Avadh NagariAnjali Ashish Karande1771%25 Sep 2024
GOKULDHAM APPARTMENTSHRI GAJANAN BUILDERS AND DEVELOPERS16100%15 Dec 2022
Misar Layout-2Yogesh Balaji Misar1669%16 Sep 2022
SAI TAJ NAGARMASUM SHABBIR JIWANI166%3 Jan 2023
Vistari LayoutDiwakar Vistariji Pilare160%8 Dec 2023
Shree Royal HeightsShree Gurukrupa Builders And Developers1612%4 Mar 2025
SAI NAGARIRajendra Arjun Shetiya1540%13 Nov 2020
Gajanan NagariPMG Associates1457%21 Jan 2021
Aradhy Nagri KhedNayeem Abbas Sherali Jiwani1436%5 Aug 2021
Bundele Nagari-1Sujata Eknath Bundele1464%4 Aug 2022
Gaurav NagariJiya Shabir Qureshi & 1 Other140%1 Sep 2022
Gurudevnagari LayoutAshish M Karande and Anjali A Karande1354%4 Jan 2022
Shri SaiVinod Nawghade and Rajendra Nimje110%18 Mar 2020
Shree Sai Krupa LayoutAmit Vasantrao Mendhule11100%21 Jan 2021
Hajare LayoutAKSHAY HAJARE, MAHADEO HAJARE, SARASWATI HAJARE & MADHAO HAJARE1145%22 May 2023
KHUSHI RESIDENCYRAVNEETKAUR CHARANJEETSINGH WADHWA10100%2 Jan 2020
Shree Gurukrupa LayoutAnup Mendhule, Sarang Mendhule & Husain Abid Karori10100%24 Feb 2020
ANTARGAON PARADWAHISHAMA ARIFKHAN PATHAN100%22 Nov 2021
Shiv NagarTeju Giridhari Tahliyani1050%2 Mar 2022
Misar LayoutYogesh Balaji Misar1060%12 Aug 2022
Shree Saikrupa LayoutShree Gurukrupa Builders And Developers100%21 Feb 2024
Vaibhav LaxmiNamdeo T Kapgate, Meghendra H kapgate & Ravikumar H Sonwane90%3 Feb 2020
Unnati NagariPMG Associates80%11 Jun 2024
Gurudeonagari Layout -2Ashish M Karande and Anjali A Karande757%22 Feb 2022
Sara NagariAshish Madanrao Karande60%28 Jul 2022
SIDHESHWAR NAGARISIDHESHWAR BHAYYAJI BHARRE AND YOGESH BALAJI MISAR50%24 Nov 2020
Misar Layout- 3Yogesh Misar And Hitendra Raut50%20 Sep 2022
Urkude Nagari - 1VINODINI MANOHAR Urkude2100%6 Jan 2020
GAT NO 114Prabhakar Narayan Pilare and 4 others20%25 Oct 2021
ADITYA INFINITYAditya Infraventures10%9 Aug 2020
Site No.124, Datala, New ChandrapurMHADA(Nagpur Board)--5 Jul 2017
TARA RESIDENCYVAIBHAVI BUILDERS--31 Aug 2017
Construction of 96Ts EWS 36Ts MIG 8 Shops and 4 Office Chambers at site No 125 Datala New ChandrapurMHADA ( Nagpur Board )--26 Jul 2017
atharva heightssantosh sadashiv kolettiwar--5 Aug 2017
SAIDWARKA APPARTMENTNIRAJ PRALHADRAO PADGILWAR--1 Aug 2017
atharva sadansantosh sadashiv kolettiwar--14 Aug 2017
GANESHA RESIDENCYGAJANAN MORESHWAR NILAWAR--24 Aug 2017
DSK GREENDSK INFRA PROJECT--31 Jul 2017
VRUNDAWAN RESIDENCY-IISMITA GAJANAN NILAWAR--16 Aug 2017
VAIBHAVI HEIGHTSYASHPAL DEWANAND KHOBRAGADE--18 Aug 2017
Construction of 100 Flats under MIG on site No.134 at New ChandrapurMHADA(Nagpur Board)--4 Aug 2017
VIGHNAHARTAGAJANAN MORESHWAR NILAWAR--18 Aug 2017
CARNATIONSYNERGY PLOTTERS AND STRUCTURES--6 Sep 2017
DAISYSYNERGY PLOTTERS AND STRUCTURES--6 Sep 2017
LILACSYNERGY PLOTTERS AND STRUCTURES--22 Aug 2017
LILYSYNERGY PLOTTERS AND STRUCTURES--18 Aug 2017
ShriLaxmi ChambersSudhir Tulshiram Thakre--31 Aug 2017
Saivilla AppartmentNIRAJ PRALHADRAO PADGILWAR--14 Aug 2017
SHREE BALAJI TOWERVIJAY RAMDAS KHADE--14 Aug 2017
Aditya EnclaveAditya Infraventures--14 Aug 2017
MrunaliniDeshak--14 Aug 2017
JOSA RESIDENCY IIJOSA INFRA--11 Aug 2017
VASANT VILLASMITA GAJANAN NILAWAR--18 Aug 2017
CHINTAMANI RESIDENCYSHREE CHINTAMANI DEVELOPERS--9 Aug 2017
SHLOK APPARTMENTSWATI PRASHANT DHATRAK--1 Sep 2017
VASANT VILLAD Y DEVELOPERS--9 Aug 2017
SYNERGY INFRA VENTURESSYNERGY INFRA VENTURES--8 Aug 2017
BALLARPUR BUSINESS CENTERDILIP DADAJI MAMIDWAR--9 Aug 2017
RAJWADA TOWNSHIPSKYLINE BUILDERS AND DEVELOPERS--9 Aug 2017
VARAD RESIDENCYGAJANAN MORESHWAR NILAWAR--22 Aug 2017
VST3-AAKASHVIDARBHA TOWN DEVELOPERS--18 Aug 2017
VST3- AAKASJ GANGA 1VIDARBHA TOWN DEVELOPERS--31 Aug 2017
VST3- AAKASH GANGA 6VIDARBHA TOWN DEVELOPERS--22 Aug 2017
VST3-AAKASH GANGA 7VIDARBHA TOWN DEVELOPERS--31 Aug 2017
VST3-JAL AND AAKASH GANGA 5VIDARBHA TOWN DEVELOPERS--9 Aug 2017
VST3-AAKASH GANGA4VIDARBHA TOWN DEVELOPERS--14 Aug 2017
SWAPNAPURTI INFRACON PRIVATE LIMITEDSWAPNAPURTI INFRACON PRIVATE LIMITED--19 Aug 2017
PARIVARTAN PLAZAANKIT BUILDERS AND DEVELOPER--17 Aug 2017
EXOTICANATHUJI SAMBAJI KHAIRE--14 Aug 2017
DEVALAYA PHASE 1PRASHANT SUDHAKARRAO KASHETTIWAR--31 Aug 2017
SHREE HEIGHTSAnuj Vasantrao Mendhule--1 Sep 2017
CHANDRAPUR BUSSINESS CENTERSYNERGY INFRA PROJECT--1 Sep 2017
RIDDHI APARTMENTVIBHA RAJESH THAKUR--4 Dec 2017
JET KINGDOM BREEZEJET KINGDOM ESTATE--21 Sep 2017
JET KINGDOM BREEZE PHASE IJET KINGDOM ESTATE--23 Oct 2017
ASHIYANA PLAZADEVASHREE BUILDER--7 Nov 2017
CAPITAL RESIDENCY PHASE 1ELEVATE CONSTRUCTION COMPANY--20 Nov 2017
RIDDHI NAGRI WING AVIBHA RAJESH THAKUR--14 Nov 2017
RISHI RESIDENCY - WING EAPEKSHA DHAWAL RAJA--20 Dec 2017
VST-5 JASMINEVIDARBHA TOWN DEVELOPERS--20 Feb 2018
VTD 3 VAAYU APARTMENT AND AAKASH GANGA 08-09VIDARBHA TOWN DEVELOPERS--27 Feb 2018
Balaji HeightsDNR INFRA VENTURES--31 Jul 2018
CLUB BUILDINGRajya Sarkari Karmachari Madhyavarti Sanghatana--9 Apr 2018
VASANT VILLAR&P DEVELOPERS--26 Mar 2018
NIRMAL RESIDENCYPRITAM SURESH PACHARE--27 Mar 2018
KALPATARU ENCLAVEKALPANA PUNDALIK TELMASRE--20 Jun 2018
VST 5- DAFFODILVIDARBHA TOWN DEVELOPERS--22 Jun 2018
VST5-DAISYVIDARBHA TOWN DEVELOPERS--28 Jun 2018
Rich Infra India pVt LtdRich Infra India Pvt Limited--11 Sep 2018
VST5-TULIPVIDARBHA TOWN DEVELOPERS--13 Aug 2018
SHREE PALACEAmit Vasantrao Mendhule--13 Aug 2018
DEVALAYA PHASE 2PRASHANT SUDHAKARRAO KASHETTIWAR--17 Dec 2018
DEUL CONSTRUCTION MANDIRAYAN PHASE 1PRASHANT SUDHAKARRAO KASHETTIWAR--17 Dec 2018
GANPATI HERITAGEBHASKAR MANOHAR WADASKAR--24 Jul 2018
SUMUKHAY APARTMENTSAURABH SUNIL ABHYANKAR--17 Sep 2018
RIDDHI NAGRI WING CVIBHA RAJESH THAKUR--28 Aug 2018
ATHARVA RIDDHI APPARTMENTsantosh sadashiv kolettiwar--5 Mar 2019
ARYAN APPARTMENT - 4ARYAN DEVELOPERS--15 Oct 2018
SAFAL HEIGHTSSAIRAM DEVELOPERS--14 Jan 2019
HANISHA ENCLAVEHANISHA INFRA--10 Oct 2018
VIDARBHA ESTATE 5 ROSEVIDARBHA TOWN DEVELOPERS--13 Nov 2018
DSK HOMESDSKINFRAPROJECT--8 Feb 2019
VST5-GULMOHARVIDARBHA TOWN DEVELOPERS--9 Jan 2019
Mahalaxmi ApartmentDarshan Erectors Private Limited--14 Feb 2019
Thakrewadivyankatesh infraalliance--13 Mar 2019
RISHA RESIDENCE WING - DDHWANI BHARAT RAJA--8 Aug 2019
SHANTI RESIDENCYAHTESHAN ALI DEVELOPERS--5 Mar 2019
SHRI GANESH RESIDENCYGHARKUL CONSTRUCTION COMPANY PRIVATE LIMITED--5 Mar 2019
SHRI SUKHKARTA PLAZAGHARKUL CONSTRUCTION COMPANY PRIVATE LIMITED--5 Mar 2019
ROYAL AMBIENCEA B PLOTTERS & STRUCTURES--26 Apr 2019
RAJWADA HEIGHTSKYLINE BUILDERS AND DEVELOPERS--2 Mar 2020
VINAYAKVILLASHREE DEVELOPER PARTNER--22 Apr 2019
TANUSH RESIDENCYGAJANAN MORESHWAR NILAWAR--5 Apr 2019
SAI AWAS APARTMENTNIRAJ PRALHADRAO PADGILWAR--9 Apr 2019
SHIVKAMAL TOWERSHIVKAMAL CONSTRUCTIONS--19 Jul 2019
SHRI PRAGATI DEVELOPERS AND BUILDERSJITENDRA NANAJI ITANKAR--22 Jul 2019
SAI RESIDENCYSHREE SAI BUILDERS & DEVLOPERS--3 Jan 2020
PUSHPARAJ APPARTMENTSHREE CHINTAMANI DEVELOPERS--25 Aug 2019
SIDDHESH RESIDENCYPRITIMA DEEPAK NILAWAR--12 Oct 2019
SITARAM RESIDENCY 4SURESH RAMCHANDRA PACHARE--16 Dec 2019
RISHA RESIDENCE WING - CSNEHA HIRENDRA RAJA--27 Jan 2020
DSK PARKDSK INFRA PROJECT--7 Feb 2020
PRABHULEELA APPARTMENTPRATIBHA VINOD BHUSARI--16 Dec 2019
ADTIYA PLAZAANKLESH NATTHUJI KHAIRE--2 Jan 2020
Vst3 Aakash Ganga 11VIDARBHA TOWN DEVELOPERS--16 Jan 2020
Vst3 Aakash Ganga-10VIDARBHA TOWN DEVELOPERS--14 Jan 2020
STAR PRIMEMUSTAFA HATIMBHAI MAIMOON--13 May 2020
GANPATI PRIMEBHASKAR MANOHAR WADASKAR--1 Jul 2020
WING A RIDDHI NAGRI TOWNSHIPVIBHA RAJESH THAKUR--2 Sep 2020
YASHODHAN VEHAR PART - 1PM INFRAVENTURES--3 Nov 2020
GAJANAN PLAZA 3S V BUILDERS--24 Nov 2020
VAIBHAV HEIGHTPUSPRAJ DEVELOPERS--24 Nov 2020
RIDDHI NAGRI TOWNSHIP - 3VIBHA RAJESH THAKUR--24 Nov 2020
AVIGHANA HEIGHTSDEEP SURENDRA DAVE--25 Dec 2020
AMAN PLAZAMohammad Nizam Uddin--10 Feb 2021
DSKPARK 2DSK INFRA PROJECT--10 Feb 2021
Gajanan ResidencySHRI VAISHNAVI DEVELOPERS--29 May 2021
Vasavi 4Vasavi Developers--23 Oct 2021
Shree Niwas ApartmentShree Gurukrupa Builders And Developers--30 Mar 2021
RELIABLE RESIDENCYRELIABLE INFRAVENTURES--4 Jun 2021
NYSA RESIDENCYSMITA GAJANAN NILAWAR--11 Jun 2021
GURUNANAK NAGARIRAVNEETKAUR CHARANJEETSINGH WADHWA--22 Nov 2021
PUSHPARAJ RESIDENCYSANTOSH SADASHIVRAO KOLETTIWAR--31 Jul 2021
GURUKRUPA TOWERSRR BUILDERS AND DEVELOPERS--8 Sep 2021
SAKSHAM RESIDENCYH K PETROLEUM--3 Feb 2022
MEERA RESIDENCYSAROJ SURESH MAHAKULKAR--11 Apr 2022
CAPITAL RESIDENCY PHASE IVELEVATE CONSTRUCTION--28 Apr 2022
KRISHNA AMRUT PALACEKRISHNAKANCHAN DEVELOPERS--28 Apr 2022
Yashodhan ViharPM INFRAVENTURES--15 Jun 2022
Mahalaxmi AppartmentDarshan Erectors Pvt.Ltd--15 Jun 2022
Riddhi Township-4Riddhi Builders & Developers--15 Jun 2022
Shree MahalaxmiDarshan Erectors Pvt. Ltd--3 Nov 2022
Shree MahabhagaDarshan Erectors Pvt Ltd--3 Nov 2022
VISVASAJOSA INFRA--8 Feb 2023
CHHAYA ENCLAVEDHOK INFRAPROJECTS--22 Feb 2023
KRUSHNA KUNJNIRMAN DEVELOPERS--12 Apr 2023
ATHARVA ELITESANTOSH SADASHIVRAO KOLETTIWAR--22 May 2023
ATHARVA PALACEATHARVA CONSTRUCTION--27 Jun 2023
RIDDHI SKYLINEYUVRAJ RAJESH THAKUR--10 Oct 2023
Gaurav NagariPMG Associates--13 Nov 2024
Gaurav Nagari-6PMG Associates--31 Jan 2025
Damodhar Shrawan MisarDamodhar Shrawan Misar--29 May 2025
Planning a launch in Chandrapur? The area consolidated report packs launches, inventory movement, unit sizes and absorption across the projects you pick into one document. Rs 2,999 for the first project and Rs 1,999 for each additional one. Area report · Rs 2,999 · coming soon  See what is coming

Developers active in Chandrapur

VIDARBHA TOWN DEVELOPERS (15), PMG Associates (7), VIBHA RAJESH THAKUR (7), Tushar Santosh Kumar Agarwal (5), GAJANAN MORESHWAR NILAWAR (5), Shree Gurukrupa Builders And Developers (4). Each link opens the promoter's track record built from their own filings.

Frequently asked questions

How do I shortlist among the Chandrapur projects listed above?

Compare each project against its neighbours, not against the brochure. The median project on this page is 18% booked, which is the benchmark to hold any single project against. A project selling much slower than the district may have a pricing or credibility problem; one selling much faster deserves a look at whether construction is keeping pace with collections. Then open the developer link to check their delivery record on other projects, and compare filed carpet areas rather than super built-up marketing areas.

What does a revised completion date on a Chandrapur project actually mean?

The promoter has moved their deadline with the regulator, usually under section 6, which allows an extension of up to one year for reasons beyond their control. It does not move the date in your agreement for sale: your section 18 claim for delay interest or refund runs from the possession date you signed for. Before booking a project with a revision on record, ask which approvals or works the new date depends on.

What stamp duty will I pay on a flat in Chandrapur district?

The rate depends on the local body: roughly 6 to 7 percent inside municipal corporations, 4 percent in municipal council areas and 3 percent in gram panchayat areas, with women buying in their sole name paying 1 percent less. The registration fee is 1 percent of value, capped at Rs 30,000. Duty is charged on the higher of your agreement value and the ready reckoner value. ReraGenie has a free Maharashtra stamp duty calculator under Tools.

What does it mean that some Chandrapur registrations have lapsed?

A RERA registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then, the registration lapses and the project stops being a registered project: the promoter may not legally market or sell in it, and the Authority can act under section 7 against a defaulting promoter. It does not cancel your agreement for sale or your section 18 rights if you have already booked, and it does not mean construction has stopped. Ask the promoter for the current registration position in writing, and verify it on the MahaRERA portal before you pay any further instalment.

What if a Chandrapur project shows strong sales but slow construction?

That shape means the promoter is collecting money faster than they are building, which is fine under a disciplined promoter and dangerous under a stretched one. The law helps: withdrawals from the project account need architect, engineer and CA certificates in proportion to progress. Check the promoter's delivery record, and watch the next quarterly filing (due within 20 days of each quarter end) to see whether the construction line moves.

Data from official MahaRERA filings.