228 of the projects in this build are in Chandrapur district: 4,319 units across them, 8 registered in the last 12 months. Sales and inventory trends accumulate from each future quarterly update; this page shows the first one.
Of the 228 covered registrations, 24 have revised their promised completion date and 0 declare litigation. The median project here is 18% booked as of the current data. Every figure comes from the projects' own MahaRERA filings.
When Chandrapur projects promise possession
Promised possession year as filed by the builder with MahaRERA, split by what the registration says today. Of 228 projects with a promised date, 100 are recorded delivered, 36 are still on the register and 92 have a registration that has lapsed or been cancelled.
DeliveredOn the registerRegistration lapsed or cancelled
47 projects promise possession in 2026 or later. Facts as per filings on RERA website.
2,014 flats are promised in 2026 or later, across the 72% of those projects that file a flat count. Hatched years are ones where most builders never filed a count, so the bar understates real supply and cannot be compared with the years beside it. Facts as per filings on RERA website.
How far Chandrapur possession dates have moved
Builders may revise the possession date they filed at registration. Each bar is the year a project first promised, split by how far that date has since moved. 24 of 228 projects (11%) have moved at least once; the median move is 18 months and the longest is 72 months.
Kept the original dateMoved by under 2 yearsMoved by 2 years or more
Read down a bar to see how much of that year's cohort held its promise. Facts as per filings on RERA website.
Hatched years are ones where most builders never filed a flat count, so the bar understates the real total. Read down a bar to see how much of that year's cohort held its promise. Facts as per filings on RERA website.
Projects in Chandrapur
| Project | Developer | Units | Booked | Registered |
|---|---|---|---|---|
| Suvarnabhumi - A Project by SDPL | SANDEEP DWELLERS PVT. LTD. | 892 | 17% | 30 Oct 2024 |
| GAURAV NAGARI 2 | PMG Associates | 165 | 59% | 29 Jun 2021 |
| Vaishno City | Tushar Santosh Kumar Agarwal | 158 | 8% | 15 Jun 2022 |
| VAISHNO CITY | Tushar Santosh Kumar Agarwal | 130 | 7% | 15 Jun 2022 |
| CHAWHAN ROYALS | MANGESH RATILAL CHAWHAN | 126 | 100% | 14 Jan 2019 |
| Krushna Sneha Nagari | Ashok K. Bhaiyya ,Ajay D. Bhattad and Jivan B Kontamwar | 118 | 6% | 15 Feb 2022 |
| VAIBHAVLAXMI NAGARI | MAITRI PLOTS AND CONSTRUCTION | 104 | 76% | 18 Mar 2020 |
| vaishno City | Tushar Santosh Kumar Agarwal | 97 | 1% | 15 Jun 2022 |
| G S HEIGHTS | G S FORT REALTORS | 89 | 33% | 10 May 2022 |
| Vaishno city | Tushar Santosh Kumar Agarwal | 78 | 28% | 15 Jun 2022 |
| MAULI PARK | VInod P Dhoble, Savita A Chafale and Prakash S Jumde | 77 | 23% | 7 Nov 2020 |
| BALAJI TOWN | SHRIHARI BUILDERS AND DEVELOPERS | 75 | 15% | 3 Jan 2023 |
| RAKESH YADAORAO RATNAWAR | RAKESH YADAORAO RATNAWAR | 70 | 0% | 15 Aug 2021 |
| TADOBA ESTATE | Offybee Properties | 65 | 34% | 17 Oct 2024 |
| Vyankatesh City 2 | Dipak Dasharath Urade and Sharad Dasharath Urade | 62 | 19% | 3 Jul 2023 |
| RISHI PLAZA | PREMKUMAR SADHUMAL MULANI | 61 | 0% | 25 Aug 2025 |
| NIKHIL PLANET | J K BUILDERS AND DEVELOPERS | 56 | 50% | 28 Aug 2019 |
| RIDDHI 55 VILLAS | VIBHA RAJESH THAKUR | 55 | 7% | 9 Sep 2025 |
| SINGH TOWER | SINGH BUILDCON & SOLUTIONS | 52 | 4% | 28 Mar 2025 |
| vaishno city | Tushar Santosh Kumar Agarwal | 51 | 20% | 28 Jul 2022 |
| NARAYAN NAGARI | RAHUL NARAYANJI SHETIYE | 51 | 0% | 27 Dec 2023 |
| Shree Ambaji Nagar | Bhikubhai K Lodhiya ,Namitaben B lodhiya , Pankaj B Lodhiya, Varun B Lodhiya | 49 | 14% | 10 Jan 2022 |
| NEW MUSABHAI NAGAR - II | Gulzar Kamruddin Dhamani | 48 | 0% | 10 Oct 2022 |
| RIDDHI LEGACY TOWERS | YUVRAJ RAJESH THAKUR | 48 | 4% | 26 Aug 2025 |
| Astha Nagri | Shakuntala Shamrao Urade | 47 | 19% | 18 Feb 2021 |
| MAULI PARK-2 | VInod P Dhoble, Savita A Chafale and Prakash S Jumde | 47 | 43% | 27 Jan 2021 |
| GAJANAN NAGARI | R B INFRA | 46 | 0% | 2 Jul 2026 |
| Bokade layout | Mahendra Shrawanji Bokade & Others | 41 | 39% | 19 Dec 2019 |
| CHAWHAN ROYALS TOWER-1 | MANGESH RATILAL CHAWHAN | 41 | 0% | 18 Apr 2026 |
| ATHARVA PLAZA | ATHARVA INFRA | 40 | 10% | 16 Feb 2026 |
| GAURAV NAGARI | Satish D Humne & Taufik N Pathan | 38 | 87% | 28 Aug 2019 |
| RAJWADA TOWNSHIP PHASE II | SKYLINE BUILDERS AND DEVELOPERS | 37 | 76% | 2 Mar 2021 |
| 9 Star Height | 9 Star Developers | 37 | 11% | 7 Nov 2024 |
| Shree Dutta Pushpa Plaza | Atul Dattatry Gourshettiwar | 36 | 17% | 3 Jul 2024 |
| Urkude Nagari -2 | Manohar Marotrao Urkude | 35 | 9% | 11 Sep 2020 |
| New Bramhapuri City-2 | Sarita Bhaskar Makode | 35 | 0% | 25 Aug 2022 |
| GAJANAN PLAZA 4 | S V BUILDERS | 34 | 68% | 3 Jan 2024 |
| S.R. Developers-1 | S. R. Developers | 34 | 76% | 29 Apr 2024 |
| AK-FLORENZA | ANKLESH NATHUJI KHAIRE | 32 | 72% | 2 Nov 2022 |
| New Bramhapuri City-1 | Meena Diwakar Makode | 31 | 0% | 19 Aug 2022 |
| RADHA HEIGHTS | M/s SALASAR INFRA | 31 | 19% | 3 Oct 2024 |
| Namo Nagari Part - 1 | Amrapali Ravindra Meshram | 30 | 0% | 22 Sep 2020 |
| Gaurav Nagari-4 | PMG Associates | 30 | 0% | 27 Jun 2023 |
| SKAND RESIDENCY | VAISHNAVI CONSTRUCTION | 30 | 0% | 15 Jun 2026 |
| GAURAV NAGARI 3 | PMG Associates | 29 | 45% | 20 Dec 2020 |
| DELANWADI | Prabhakar N Pilare and 4 others | 28 | 0% | 16 Feb 2022 |
| CHAWHAN EMPIRE | CHAWHAN INFRATECH PRIVATE LIMITED | 28 | 18% | 8 Jul 2025 |
| Radha Krushna Nagari | Ashok Kisanlal Bhaiyya | 26 | 81% | 3 Dec 2021 |
| SHREE VRUNDAVAN HEIGHTS | NEETA RAMESHCHANDRA SHAH | 26 | 8% | 18 Mar 2026 |
| Vaibhav Laxmi Nagari | Gangadhar Harihar Bhupal | 25 | 0% | 9 Feb 2022 |
| Shree Gurukrupa Layout | Shree Gurukrupa Builders And Developers | 25 | 92% | 11 Mar 2024 |
| PILARE LAYOUT | Rajesh Deoraoji Pilare | 24 | 67% | 10 Jan 2022 |
| VASAVI DEVELOPERS GAT NO 801 | Vasavi Developers | 23 | 83% | 15 Aug 2021 |
| GAYATRI NAGAR | BANDU LAXMANRAO AHIRKAR | 23 | 100% | 30 Mar 2021 |
| Lalaji Township | Abhishek Rajan Jaiswal | 23 | 0% | 24 Jan 2022 |
| Gangaputra Layout | Indira Pramod Meshram | 22 | 0% | 8 Dec 2023 |
| MATAI NAGAR | Shri. Ashish Madanrao karande and Sau. Anjali Ashish Karande | 20 | 60% | 15 Mar 2019 |
| KSHITIJ | BLACK PEARL | 20 | 0% | 16 Jan 2021 |
| Krushna Sneha Nagari | Gaurav Ashok Bhaiyya and Ashok K. Bhaiyya | 20 | 40% | 22 Feb 2022 |
| TULIP | ANAYA INFRASTRUCTURE | 20 | 0% | 17 Oct 2024 |
| VIGHNESH RESIDENCY | GAJANAN MORESHWAR NILAWAR | 19 | 100% | 29 Jan 2019 |
| Lalaji Township | Rajan Pannalal Jaiswal | 19 | 53% | 24 Jan 2022 |
| LAXMI NAGRI | Vijay Tulsiram Yerne & Swapnil Ramesh Yerne | 18 | 0% | 20 Jun 2022 |
| RIDDHI VENTURA | VIBHA RAJESH THAKUR | 18 | 28% | 22 Apr 2024 |
| Sidheshwar Nagari-3 | Sidheshwar Bhaiyyaji Bharre | 18 | 39% | 22 Apr 2024 |
| Sidheshwar Nagari-2 | Sidheshwar Bhaiyyaji Bharre | 17 | 29% | 4 Apr 2024 |
| Avadh Nagari | Anjali Ashish Karande | 17 | 71% | 25 Sep 2024 |
| GOKULDHAM APPARTMENT | SHRI GAJANAN BUILDERS AND DEVELOPERS | 16 | 100% | 15 Dec 2022 |
| Misar Layout-2 | Yogesh Balaji Misar | 16 | 69% | 16 Sep 2022 |
| SAI TAJ NAGAR | MASUM SHABBIR JIWANI | 16 | 6% | 3 Jan 2023 |
| Vistari Layout | Diwakar Vistariji Pilare | 16 | 0% | 8 Dec 2023 |
| Shree Royal Heights | Shree Gurukrupa Builders And Developers | 16 | 12% | 4 Mar 2025 |
| SAI NAGARI | Rajendra Arjun Shetiya | 15 | 40% | 13 Nov 2020 |
| Gajanan Nagari | PMG Associates | 14 | 57% | 21 Jan 2021 |
| Aradhy Nagri Khed | Nayeem Abbas Sherali Jiwani | 14 | 36% | 5 Aug 2021 |
| Bundele Nagari-1 | Sujata Eknath Bundele | 14 | 64% | 4 Aug 2022 |
| Gaurav Nagari | Jiya Shabir Qureshi & 1 Other | 14 | 0% | 1 Sep 2022 |
| Gurudevnagari Layout | Ashish M Karande and Anjali A Karande | 13 | 54% | 4 Jan 2022 |
| Shri Sai | Vinod Nawghade and Rajendra Nimje | 11 | 0% | 18 Mar 2020 |
| Shree Sai Krupa Layout | Amit Vasantrao Mendhule | 11 | 100% | 21 Jan 2021 |
| Hajare Layout | AKSHAY HAJARE, MAHADEO HAJARE, SARASWATI HAJARE & MADHAO HAJARE | 11 | 45% | 22 May 2023 |
| KHUSHI RESIDENCY | RAVNEETKAUR CHARANJEETSINGH WADHWA | 10 | 100% | 2 Jan 2020 |
| Shree Gurukrupa Layout | Anup Mendhule, Sarang Mendhule & Husain Abid Karori | 10 | 100% | 24 Feb 2020 |
| ANTARGAON PARADWAHI | SHAMA ARIFKHAN PATHAN | 10 | 0% | 22 Nov 2021 |
| Shiv Nagar | Teju Giridhari Tahliyani | 10 | 50% | 2 Mar 2022 |
| Misar Layout | Yogesh Balaji Misar | 10 | 60% | 12 Aug 2022 |
| Shree Saikrupa Layout | Shree Gurukrupa Builders And Developers | 10 | 0% | 21 Feb 2024 |
| Vaibhav Laxmi | Namdeo T Kapgate, Meghendra H kapgate & Ravikumar H Sonwane | 9 | 0% | 3 Feb 2020 |
| Unnati Nagari | PMG Associates | 8 | 0% | 11 Jun 2024 |
| Gurudeonagari Layout -2 | Ashish M Karande and Anjali A Karande | 7 | 57% | 22 Feb 2022 |
| Sara Nagari | Ashish Madanrao Karande | 6 | 0% | 28 Jul 2022 |
| SIDHESHWAR NAGARI | SIDHESHWAR BHAYYAJI BHARRE AND YOGESH BALAJI MISAR | 5 | 0% | 24 Nov 2020 |
| Misar Layout- 3 | Yogesh Misar And Hitendra Raut | 5 | 0% | 20 Sep 2022 |
| Urkude Nagari - 1 | VINODINI MANOHAR Urkude | 2 | 100% | 6 Jan 2020 |
| GAT NO 114 | Prabhakar Narayan Pilare and 4 others | 2 | 0% | 25 Oct 2021 |
| ADITYA INFINITY | Aditya Infraventures | 1 | 0% | 9 Aug 2020 |
| Site No.124, Datala, New Chandrapur | MHADA(Nagpur Board) | - | - | 5 Jul 2017 |
| TARA RESIDENCY | VAIBHAVI BUILDERS | - | - | 31 Aug 2017 |
| Construction of 96Ts EWS 36Ts MIG 8 Shops and 4 Office Chambers at site No 125 Datala New Chandrapur | MHADA ( Nagpur Board ) | - | - | 26 Jul 2017 |
| atharva heights | santosh sadashiv kolettiwar | - | - | 5 Aug 2017 |
| SAIDWARKA APPARTMENT | NIRAJ PRALHADRAO PADGILWAR | - | - | 1 Aug 2017 |
| atharva sadan | santosh sadashiv kolettiwar | - | - | 14 Aug 2017 |
| GANESHA RESIDENCY | GAJANAN MORESHWAR NILAWAR | - | - | 24 Aug 2017 |
| DSK GREEN | DSK INFRA PROJECT | - | - | 31 Jul 2017 |
| VRUNDAWAN RESIDENCY-II | SMITA GAJANAN NILAWAR | - | - | 16 Aug 2017 |
| VAIBHAVI HEIGHTS | YASHPAL DEWANAND KHOBRAGADE | - | - | 18 Aug 2017 |
| Construction of 100 Flats under MIG on site No.134 at New Chandrapur | MHADA(Nagpur Board) | - | - | 4 Aug 2017 |
| VIGHNAHARTA | GAJANAN MORESHWAR NILAWAR | - | - | 18 Aug 2017 |
| CARNATION | SYNERGY PLOTTERS AND STRUCTURES | - | - | 6 Sep 2017 |
| DAISY | SYNERGY PLOTTERS AND STRUCTURES | - | - | 6 Sep 2017 |
| LILAC | SYNERGY PLOTTERS AND STRUCTURES | - | - | 22 Aug 2017 |
| LILY | SYNERGY PLOTTERS AND STRUCTURES | - | - | 18 Aug 2017 |
| ShriLaxmi Chambers | Sudhir Tulshiram Thakre | - | - | 31 Aug 2017 |
| Saivilla Appartment | NIRAJ PRALHADRAO PADGILWAR | - | - | 14 Aug 2017 |
| SHREE BALAJI TOWER | VIJAY RAMDAS KHADE | - | - | 14 Aug 2017 |
| Aditya Enclave | Aditya Infraventures | - | - | 14 Aug 2017 |
| Mrunalini | Deshak | - | - | 14 Aug 2017 |
| JOSA RESIDENCY II | JOSA INFRA | - | - | 11 Aug 2017 |
| VASANT VILLA | SMITA GAJANAN NILAWAR | - | - | 18 Aug 2017 |
| CHINTAMANI RESIDENCY | SHREE CHINTAMANI DEVELOPERS | - | - | 9 Aug 2017 |
| SHLOK APPARTMENT | SWATI PRASHANT DHATRAK | - | - | 1 Sep 2017 |
| VASANT VILLA | D Y DEVELOPERS | - | - | 9 Aug 2017 |
| SYNERGY INFRA VENTURES | SYNERGY INFRA VENTURES | - | - | 8 Aug 2017 |
| BALLARPUR BUSINESS CENTER | DILIP DADAJI MAMIDWAR | - | - | 9 Aug 2017 |
| RAJWADA TOWNSHIP | SKYLINE BUILDERS AND DEVELOPERS | - | - | 9 Aug 2017 |
| VARAD RESIDENCY | GAJANAN MORESHWAR NILAWAR | - | - | 22 Aug 2017 |
| VST3-AAKASH | VIDARBHA TOWN DEVELOPERS | - | - | 18 Aug 2017 |
| VST3- AAKASJ GANGA 1 | VIDARBHA TOWN DEVELOPERS | - | - | 31 Aug 2017 |
| VST3- AAKASH GANGA 6 | VIDARBHA TOWN DEVELOPERS | - | - | 22 Aug 2017 |
| VST3-AAKASH GANGA 7 | VIDARBHA TOWN DEVELOPERS | - | - | 31 Aug 2017 |
| VST3-JAL AND AAKASH GANGA 5 | VIDARBHA TOWN DEVELOPERS | - | - | 9 Aug 2017 |
| VST3-AAKASH GANGA4 | VIDARBHA TOWN DEVELOPERS | - | - | 14 Aug 2017 |
| SWAPNAPURTI INFRACON PRIVATE LIMITED | SWAPNAPURTI INFRACON PRIVATE LIMITED | - | - | 19 Aug 2017 |
| PARIVARTAN PLAZA | ANKIT BUILDERS AND DEVELOPER | - | - | 17 Aug 2017 |
| EXOTICA | NATHUJI SAMBAJI KHAIRE | - | - | 14 Aug 2017 |
| DEVALAYA PHASE 1 | PRASHANT SUDHAKARRAO KASHETTIWAR | - | - | 31 Aug 2017 |
| SHREE HEIGHTS | Anuj Vasantrao Mendhule | - | - | 1 Sep 2017 |
| CHANDRAPUR BUSSINESS CENTER | SYNERGY INFRA PROJECT | - | - | 1 Sep 2017 |
| RIDDHI APARTMENT | VIBHA RAJESH THAKUR | - | - | 4 Dec 2017 |
| JET KINGDOM BREEZE | JET KINGDOM ESTATE | - | - | 21 Sep 2017 |
| JET KINGDOM BREEZE PHASE I | JET KINGDOM ESTATE | - | - | 23 Oct 2017 |
| ASHIYANA PLAZA | DEVASHREE BUILDER | - | - | 7 Nov 2017 |
| CAPITAL RESIDENCY PHASE 1 | ELEVATE CONSTRUCTION COMPANY | - | - | 20 Nov 2017 |
| RIDDHI NAGRI WING A | VIBHA RAJESH THAKUR | - | - | 14 Nov 2017 |
| RISHI RESIDENCY - WING E | APEKSHA DHAWAL RAJA | - | - | 20 Dec 2017 |
| VST-5 JASMINE | VIDARBHA TOWN DEVELOPERS | - | - | 20 Feb 2018 |
| VTD 3 VAAYU APARTMENT AND AAKASH GANGA 08-09 | VIDARBHA TOWN DEVELOPERS | - | - | 27 Feb 2018 |
| Balaji Heights | DNR INFRA VENTURES | - | - | 31 Jul 2018 |
| CLUB BUILDING | Rajya Sarkari Karmachari Madhyavarti Sanghatana | - | - | 9 Apr 2018 |
| VASANT VILLA | R&P DEVELOPERS | - | - | 26 Mar 2018 |
| NIRMAL RESIDENCY | PRITAM SURESH PACHARE | - | - | 27 Mar 2018 |
| KALPATARU ENCLAVE | KALPANA PUNDALIK TELMASRE | - | - | 20 Jun 2018 |
| VST 5- DAFFODIL | VIDARBHA TOWN DEVELOPERS | - | - | 22 Jun 2018 |
| VST5-DAISY | VIDARBHA TOWN DEVELOPERS | - | - | 28 Jun 2018 |
| Rich Infra India pVt Ltd | Rich Infra India Pvt Limited | - | - | 11 Sep 2018 |
| VST5-TULIP | VIDARBHA TOWN DEVELOPERS | - | - | 13 Aug 2018 |
| SHREE PALACE | Amit Vasantrao Mendhule | - | - | 13 Aug 2018 |
| DEVALAYA PHASE 2 | PRASHANT SUDHAKARRAO KASHETTIWAR | - | - | 17 Dec 2018 |
| DEUL CONSTRUCTION MANDIRAYAN PHASE 1 | PRASHANT SUDHAKARRAO KASHETTIWAR | - | - | 17 Dec 2018 |
| GANPATI HERITAGE | BHASKAR MANOHAR WADASKAR | - | - | 24 Jul 2018 |
| SUMUKHAY APARTMENT | SAURABH SUNIL ABHYANKAR | - | - | 17 Sep 2018 |
| RIDDHI NAGRI WING C | VIBHA RAJESH THAKUR | - | - | 28 Aug 2018 |
| ATHARVA RIDDHI APPARTMENT | santosh sadashiv kolettiwar | - | - | 5 Mar 2019 |
| ARYAN APPARTMENT - 4 | ARYAN DEVELOPERS | - | - | 15 Oct 2018 |
| SAFAL HEIGHTS | SAIRAM DEVELOPERS | - | - | 14 Jan 2019 |
| HANISHA ENCLAVE | HANISHA INFRA | - | - | 10 Oct 2018 |
| VIDARBHA ESTATE 5 ROSE | VIDARBHA TOWN DEVELOPERS | - | - | 13 Nov 2018 |
| DSK HOMES | DSKINFRAPROJECT | - | - | 8 Feb 2019 |
| VST5-GULMOHAR | VIDARBHA TOWN DEVELOPERS | - | - | 9 Jan 2019 |
| Mahalaxmi Apartment | Darshan Erectors Private Limited | - | - | 14 Feb 2019 |
| Thakrewadi | vyankatesh infraalliance | - | - | 13 Mar 2019 |
| RISHA RESIDENCE WING - D | DHWANI BHARAT RAJA | - | - | 8 Aug 2019 |
| SHANTI RESIDENCY | AHTESHAN ALI DEVELOPERS | - | - | 5 Mar 2019 |
| SHRI GANESH RESIDENCY | GHARKUL CONSTRUCTION COMPANY PRIVATE LIMITED | - | - | 5 Mar 2019 |
| SHRI SUKHKARTA PLAZA | GHARKUL CONSTRUCTION COMPANY PRIVATE LIMITED | - | - | 5 Mar 2019 |
| ROYAL AMBIENCE | A B PLOTTERS & STRUCTURES | - | - | 26 Apr 2019 |
| RAJWADA HEIGHT | SKYLINE BUILDERS AND DEVELOPERS | - | - | 2 Mar 2020 |
| VINAYAKVILLA | SHREE DEVELOPER PARTNER | - | - | 22 Apr 2019 |
| TANUSH RESIDENCY | GAJANAN MORESHWAR NILAWAR | - | - | 5 Apr 2019 |
| SAI AWAS APARTMENT | NIRAJ PRALHADRAO PADGILWAR | - | - | 9 Apr 2019 |
| SHIVKAMAL TOWER | SHIVKAMAL CONSTRUCTIONS | - | - | 19 Jul 2019 |
| SHRI PRAGATI DEVELOPERS AND BUILDERS | JITENDRA NANAJI ITANKAR | - | - | 22 Jul 2019 |
| SAI RESIDENCY | SHREE SAI BUILDERS & DEVLOPERS | - | - | 3 Jan 2020 |
| PUSHPARAJ APPARTMENT | SHREE CHINTAMANI DEVELOPERS | - | - | 25 Aug 2019 |
| SIDDHESH RESIDENCY | PRITIMA DEEPAK NILAWAR | - | - | 12 Oct 2019 |
| SITARAM RESIDENCY 4 | SURESH RAMCHANDRA PACHARE | - | - | 16 Dec 2019 |
| RISHA RESIDENCE WING - C | SNEHA HIRENDRA RAJA | - | - | 27 Jan 2020 |
| DSK PARK | DSK INFRA PROJECT | - | - | 7 Feb 2020 |
| PRABHULEELA APPARTMENT | PRATIBHA VINOD BHUSARI | - | - | 16 Dec 2019 |
| ADTIYA PLAZA | ANKLESH NATTHUJI KHAIRE | - | - | 2 Jan 2020 |
| Vst3 Aakash Ganga 11 | VIDARBHA TOWN DEVELOPERS | - | - | 16 Jan 2020 |
| Vst3 Aakash Ganga-10 | VIDARBHA TOWN DEVELOPERS | - | - | 14 Jan 2020 |
| STAR PRIME | MUSTAFA HATIMBHAI MAIMOON | - | - | 13 May 2020 |
| GANPATI PRIME | BHASKAR MANOHAR WADASKAR | - | - | 1 Jul 2020 |
| WING A RIDDHI NAGRI TOWNSHIP | VIBHA RAJESH THAKUR | - | - | 2 Sep 2020 |
| YASHODHAN VEHAR PART - 1 | PM INFRAVENTURES | - | - | 3 Nov 2020 |
| GAJANAN PLAZA 3 | S V BUILDERS | - | - | 24 Nov 2020 |
| VAIBHAV HEIGHT | PUSPRAJ DEVELOPERS | - | - | 24 Nov 2020 |
| RIDDHI NAGRI TOWNSHIP - 3 | VIBHA RAJESH THAKUR | - | - | 24 Nov 2020 |
| AVIGHANA HEIGHTS | DEEP SURENDRA DAVE | - | - | 25 Dec 2020 |
| AMAN PLAZA | Mohammad Nizam Uddin | - | - | 10 Feb 2021 |
| DSKPARK 2 | DSK INFRA PROJECT | - | - | 10 Feb 2021 |
| Gajanan Residency | SHRI VAISHNAVI DEVELOPERS | - | - | 29 May 2021 |
| Vasavi 4 | Vasavi Developers | - | - | 23 Oct 2021 |
| Shree Niwas Apartment | Shree Gurukrupa Builders And Developers | - | - | 30 Mar 2021 |
| RELIABLE RESIDENCY | RELIABLE INFRAVENTURES | - | - | 4 Jun 2021 |
| NYSA RESIDENCY | SMITA GAJANAN NILAWAR | - | - | 11 Jun 2021 |
| GURUNANAK NAGARI | RAVNEETKAUR CHARANJEETSINGH WADHWA | - | - | 22 Nov 2021 |
| PUSHPARAJ RESIDENCY | SANTOSH SADASHIVRAO KOLETTIWAR | - | - | 31 Jul 2021 |
| GURUKRUPA TOWERS | RR BUILDERS AND DEVELOPERS | - | - | 8 Sep 2021 |
| SAKSHAM RESIDENCY | H K PETROLEUM | - | - | 3 Feb 2022 |
| MEERA RESIDENCY | SAROJ SURESH MAHAKULKAR | - | - | 11 Apr 2022 |
| CAPITAL RESIDENCY PHASE IV | ELEVATE CONSTRUCTION | - | - | 28 Apr 2022 |
| KRISHNA AMRUT PALACE | KRISHNAKANCHAN DEVELOPERS | - | - | 28 Apr 2022 |
| Yashodhan Vihar | PM INFRAVENTURES | - | - | 15 Jun 2022 |
| Mahalaxmi Appartment | Darshan Erectors Pvt.Ltd | - | - | 15 Jun 2022 |
| Riddhi Township-4 | Riddhi Builders & Developers | - | - | 15 Jun 2022 |
| Shree Mahalaxmi | Darshan Erectors Pvt. Ltd | - | - | 3 Nov 2022 |
| Shree Mahabhaga | Darshan Erectors Pvt Ltd | - | - | 3 Nov 2022 |
| VISVASA | JOSA INFRA | - | - | 8 Feb 2023 |
| CHHAYA ENCLAVE | DHOK INFRAPROJECTS | - | - | 22 Feb 2023 |
| KRUSHNA KUNJ | NIRMAN DEVELOPERS | - | - | 12 Apr 2023 |
| ATHARVA ELITE | SANTOSH SADASHIVRAO KOLETTIWAR | - | - | 22 May 2023 |
| ATHARVA PALACE | ATHARVA CONSTRUCTION | - | - | 27 Jun 2023 |
| RIDDHI SKYLINE | YUVRAJ RAJESH THAKUR | - | - | 10 Oct 2023 |
| Gaurav Nagari | PMG Associates | - | - | 13 Nov 2024 |
| Gaurav Nagari-6 | PMG Associates | - | - | 31 Jan 2025 |
| Damodhar Shrawan Misar | Damodhar Shrawan Misar | - | - | 29 May 2025 |
Developers active in Chandrapur
VIDARBHA TOWN DEVELOPERS (15), PMG Associates (7), VIBHA RAJESH THAKUR (7), Tushar Santosh Kumar Agarwal (5), GAJANAN MORESHWAR NILAWAR (5), Shree Gurukrupa Builders And Developers (4). Each link opens the promoter's track record built from their own filings.
Frequently asked questions
How do I shortlist among the Chandrapur projects listed above?
Compare each project against its neighbours, not against the brochure. The median project on this page is 18% booked, which is the benchmark to hold any single project against. A project selling much slower than the district may have a pricing or credibility problem; one selling much faster deserves a look at whether construction is keeping pace with collections. Then open the developer link to check their delivery record on other projects, and compare filed carpet areas rather than super built-up marketing areas.
What does a revised completion date on a Chandrapur project actually mean?
The promoter has moved their deadline with the regulator, usually under section 6, which allows an extension of up to one year for reasons beyond their control. It does not move the date in your agreement for sale: your section 18 claim for delay interest or refund runs from the possession date you signed for. Before booking a project with a revision on record, ask which approvals or works the new date depends on.
What stamp duty will I pay on a flat in Chandrapur district?
The rate depends on the local body: roughly 6 to 7 percent inside municipal corporations, 4 percent in municipal council areas and 3 percent in gram panchayat areas, with women buying in their sole name paying 1 percent less. The registration fee is 1 percent of value, capped at Rs 30,000. Duty is charged on the higher of your agreement value and the ready reckoner value. ReraGenie has a free Maharashtra stamp duty calculator under Tools.
What does it mean that some Chandrapur registrations have lapsed?
A RERA registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then, the registration lapses and the project stops being a registered project: the promoter may not legally market or sell in it, and the Authority can act under section 7 against a defaulting promoter. It does not cancel your agreement for sale or your section 18 rights if you have already booked, and it does not mean construction has stopped. Ask the promoter for the current registration position in writing, and verify it on the MahaRERA portal before you pay any further instalment.
What if a Chandrapur project shows strong sales but slow construction?
That shape means the promoter is collecting money faster than they are building, which is fine under a disciplined promoter and dangerous under a stretched one. The law helps: withdrawals from the project account need architect, engineer and CA certificates in proportion to progress. Check the promoter's delivery record, and watch the next quarterly filing (due within 20 days of each quarter end) to see whether the construction line moves.