229 projects are registered in Chandrapur district: 4,381 units across them, 6 registered in the last 12 months. Sales and inventory trends accumulate from each future quarterly update; this page shows the first one.

229Projects covered
6Registered, last 12 months
4,381Units declared
3,212Units not yet booked
25Completion dates revised
0With declared litigation

Of the 229 covered registrations, 25 have revised their promised completion date and 0 declare litigation. The median project here is 18% booked as of the current data. Every figure comes from the projects' own MahaRERA filings.

Also free on ReraGenie: a monthly RERA report for the seven biggest markets in Maharashtra (Pune, Mumbai, Thane, Navi Mumbai, Nagpur, Nashik and Vasai-Virar): what registered that month, the possession pipeline and the busiest pincodes, from the filings. See the latest editions.

When Chandrapur projects promise possession

Promised possession year as filed by the builder with MahaRERA, split by what the registration says today. Of 229 projects with a promised date, 100 are recorded delivered, 38 are still on the register and 91 have a registration that has lapsed or been cancelled.

DeliveredOn the registerRegistration lapsed or cancelled

012253750today2017: 2 projects, delivered’172018: 14 projects, delivered’182019: 14 projects, delivered2019: 1 projects, registration lapsed or cancelled’192020: 5 projects, delivered2020: 5 projects, registration lapsed or cancelled’202021: 10 projects, delivered2021: 6 projects, registration lapsed or cancelled’212022: 18 projects, delivered2022: 19 projects, registration lapsed or cancelled’222023: 16 projects, delivered2023: 18 projects, registration lapsed or cancelled’232024: 8 projects, delivered2024: 25 projects, registration lapsed or cancelled’242025: 10 projects, delivered2025: 10 projects, registration lapsed or cancelled’252026: 1 projects, delivered2026: 7 projects, on the register2026: 6 projects, registration lapsed or cancelled’262027: 2 projects, delivered2027: 13 projects, on the register2027: 1 projects, registration lapsed or cancelled’272028: 9 projects, on the register’282029: 1 projects, on the register’292030: 5 projects, on the register’302031: 2 projects, on the register’312034: 1 projects, on the register’34

48 projects promise possession in 2026 or later. Facts as per filings on RERA website.

05001,0001,5002,000today’17’18’192020: 2 flats, delivered (only 1 of 10 projects filed a flat count)’202021: 20 flats, delivered (only 1 of 16 projects filed a flat count)’212022: 212 flats, delivered (only 14 of 37 projects filed a flat count)2022: 55 flats, registration lapsed or cancelled (only 14 of 37 projects filed a flat count)’222023: 392 flats, delivered (only 13 of 34 projects filed a flat count)2023: 57 flats, registration lapsed or cancelled (only 13 of 34 projects filed a flat count)’232024: 205 flats, delivered2024: 1,019 flats, registration lapsed or cancelled’242025: 118 flats, delivered2025: 225 flats, registration lapsed or cancelled’252026: 268 flats, on the register2026: 86 flats, registration lapsed or cancelled’262027: 34 flats, delivered2027: 151 flats, on the register2027: 20 flats, registration lapsed or cancelled’272028: 309 flats, on the register’282029: 30 flats, on the register’292030: 183 flats, on the register’302031: 103 flats, on the register’312034: 892 flats, on the register’34

2,076 flats are promised in 2026 or later, across the 73% of those projects that file a flat count. Hatched years are ones where most builders never filed a count, so the bar understates real supply and cannot be compared with the years beside it. Facts as per filings on RERA website.

How far Chandrapur possession dates have moved

Builders may revise the possession date they filed at registration. Each bar is the year a project first promised, split by how far that date has since moved. 25 of 229 projects (11%) have moved at least once; the median move is 20 months and the longest is 72 months.

Kept the original dateMoved by under 2 yearsMoved by 2 years or more

012253750Originally due 2017: 2 projects kept the original date, 100% of the year’17Originally due 2018: 14 projects kept the original date, 100% of the year’18Originally due 2019: 15 projects kept the original date, 68% of the yearOriginally due 2019: 5 projects moved by under 2 years, 23% of the yearOriginally due 2019: 2 projects moved by 2 years or more, 9% of the year’19Originally due 2020: 5 projects kept the original date, 83% of the yearOriginally due 2020: 1 projects moved by 2 years or more, 17% of the year’20Originally due 2021: 16 projects kept the original date, 89% of the yearOriginally due 2021: 1 projects moved by under 2 years, 6% of the yearOriginally due 2021: 1 projects moved by 2 years or more, 6% of the year’21Originally due 2022: 35 projects kept the original date, 81% of the yearOriginally due 2022: 4 projects moved by under 2 years, 9% of the yearOriginally due 2022: 4 projects moved by 2 years or more, 9% of the year’22Originally due 2023: 29 projects kept the original date, 94% of the yearOriginally due 2023: 1 projects moved by under 2 years, 3% of the yearOriginally due 2023: 1 projects moved by 2 years or more, 3% of the year’23Originally due 2024: 31 projects kept the original date, 97% of the yearOriginally due 2024: 1 projects moved by under 2 years, 3% of the year’24Originally due 2025: 16 projects kept the original date, 84% of the yearOriginally due 2025: 2 projects moved by under 2 years, 11% of the yearOriginally due 2025: 1 projects moved by 2 years or more, 5% of the year’25Originally due 2026: 10 projects kept the original date, 91% of the yearOriginally due 2026: 1 projects moved by 2 years or more, 9% of the year’26Originally due 2027: 15 projects kept the original date, 100% of the year’27Originally due 2028: 8 projects kept the original date, 100% of the year’28Originally due 2029: 1 projects kept the original date, 100% of the year’29Originally due 2030: 4 projects kept the original date, 100% of the year’30Originally due 2031: 2 projects kept the original date, 100% of the year’31Originally due 2034: 1 projects kept the original date, 100% of the year’34

Read down a bar to see how much of that year's cohort held its promise. Facts as per filings on RERA website.

05001,0001,5002,000’17’18’19Originally due 2020: 2 flats kept the original date, 83% of the year (only 1 of 6 projects filed a flat count)’20Originally due 2021: 20 flats kept the original date, 89% of the year (only 2 of 18 projects filed a flat count)Originally due 2021: 19 flats moved by 2 years or more, 6% of the year (only 2 of 18 projects filed a flat count)’21Originally due 2022: 267 flats kept the original date, 81% of the year (only 17 of 43 projects filed a flat count)Originally due 2022: 59 flats moved by 2 years or more, 9% of the year (only 17 of 43 projects filed a flat count)’22Originally due 2023: 449 flats kept the original date, 94% of the year (only 13 of 31 projects filed a flat count)’23Originally due 2024: 1,198 flats kept the original date, 97% of the yearOriginally due 2024: 56 flats moved by under 2 years, 3% of the year’24Originally due 2025: 310 flats kept the original date, 84% of the yearOriginally due 2025: 50 flats moved by under 2 years, 11% of the year’25Originally due 2026: 248 flats kept the original date, 91% of the yearOriginally due 2026: 37 flats moved by 2 years or more, 9% of the year’26Originally due 2027: 186 flats kept the original date, 100% of the year’27Originally due 2028: 272 flats kept the original date, 100% of the year’28Originally due 2029: 30 flats kept the original date, 100% of the year’29Originally due 2030: 183 flats kept the original date, 100% of the year’30Originally due 2031: 103 flats kept the original date, 100% of the year’31Originally due 2034: 892 flats kept the original date, 100% of the year’34

Hatched years are ones where most builders never filed a flat count, so the bar understates the real total. Read down a bar to see how much of that year's cohort held its promise. Facts as per filings on RERA website.

Permissions and land in Chandrapur

Whose name the land is in

Every one of the 229 registrations on this page answers this: on 202 the promoter is the only owner named; on 27 the promoter is an owner with other names on the file, which is what a joint development looks like on paper. Where other names are on the file, ask which of them signs your agreement for sale. A landowner who is not a party to it is a question for your lawyer before you pay, not a defect in the project.

Where in Chandrapur: projects by taluka

229 of the 229 registrations on this page name their taluka.

TalukaProjectsShare
Chandrapur11349%
Brahmapuri6930%
Ballarpur136%
Bhadravati94%
Warora94%
Nagbhir73%
5 other talukas94%

Projects in Chandrapur

Showing 1 to 60 of 229 projects.

Largest first, by the unit count in the filing.

ProjectDeveloperUnitsBookedRegisteredStatus
Suvarnabhumi - A Project by SDPLMouza Chicholi and Hardoli, 441206SANDEEP DWELLERS PVT. LTD.89217%30 Oct 2024Registered
GAURAV NAGARI 2Bramhapuri, 441206PMG Associates16559%29 Jun 2021Registration lapsed
Vaishno CityNA, 442907Tushar Santosh Kumar Agarwal1588%15 Jun 2022Registration lapsed
VAISHNO CITYKhanji Village, 442907Tushar Santosh Kumar Agarwal1307%15 Jun 2022Registration lapsed
CHAWHAN ROYALSMUL ROAD, 442401MANGESH RATILAL CHAWHAN126100%14 Jan 2019Registration lapsed
Krushna Sneha NagariTalodhi Balapur, 441206Ashok K. Bhaiyya ,Ajay D. Bhattad and Jivan B Kontamwar1186%15 Feb 2022Completed
VAIBHAVLAXMI NAGARIBELDATI CHANDRAPUR, 441206MAITRI PLOTS AND CONSTRUCTION10476%18 Mar 2020Registration lapsed
vaishno CityNA, 442907Tushar Santosh Kumar Agarwal971%15 Jun 2022Registration lapsed
G S HEIGHTSBHANAPETH, 442402G S FORT REALTORS8933%10 May 2022Registered
Vaishno cityNA, 442907Tushar Santosh Kumar Agarwal7828%15 Jun 2022Registration lapsed
MAULI PARKMadheli, 442907VInod P Dhoble, Savita A Chafale and Prakash S Jumde7723%7 Nov 2020Completed
BALAJI TOWNBHADRAVATI, 442501SHRIHARI BUILDERS AND DEVELOPERS7515%3 Jan 2023Completed
RAKESH YADAORAO RATNAWARANTARGAON PARADWAHI, 441224RAKESH YADAORAO RATNAWAR700%15 Aug 2021Completed
TADOBA ESTATETekepar tukum, 442903Offybee Properties6534%17 Oct 2024Registered
Sai Taj Nagar 2Delanwad, Bhrampuri, 441206Masum Shabbirali Jiwani and Mohammad Ali Shabbirali Jiwani620%11 Sep 2026Registered
Vyankatesh City 2Samta Colony, 441206Dipak Dasharath Urade and Sharad Dasharath Urade6219%3 Jul 2023Registration lapsed
RISHI PLAZABALLARPUR, 442701PREMKUMAR SADHUMAL MULANI610%25 Aug 2025Registered
NIKHIL PLANETBALLARPUR, 442701J K BUILDERS AND DEVELOPERS5650%28 Aug 2019Registration lapsed
RIDDHI 55 VILLASkhutala, 442406VIBHA RAJESH THAKUR557%9 Sep 2025Registered
SINGH TOWERWADGAON, 442401SINGH BUILDCON & SOLUTIONS524%28 Mar 2025Registered
NARAYAN NAGARIAT NARAYAN NAGARI, KHEDMAKTA, TAH. BRAHMAPURI, DIST.CHANDRAPUR., 441206RAHUL NARAYANJI SHETIYE510%27 Dec 2023Registration lapsed
vaishno cityNA, 442907Tushar Santosh Kumar Agarwal5120%28 Jul 2022Registration lapsed
Shree Ambaji NagarDelanwadi, 441206Bhikubhai K Lodhiya ,Namitaben B lodhiya , Pankaj B Lodhiya, Varun B Lodhiya4914%10 Jan 2022Completed
NEW MUSABHAI NAGAR - IINagbhid Chandrapur, 441205Gulzar Kamruddin Dhamani480%10 Oct 2022Registered
RIDDHI LEGACY TOWERSKosara, 442406YUVRAJ RAJESH THAKUR484%26 Aug 2025Registered
Astha NagriBrahmapuri, 441206Shakuntala Shamrao Urade4719%18 Feb 2021Completed
MAULI PARK-2Behind Bikaner Hotel, 442907VInod P Dhoble, Savita A Chafale and Prakash S Jumde4743%27 Jan 2021Completed
GAJANAN NAGARIMOUZA - NANDORI BU, 442907R B INFRA460%2 Jul 2026Registered
Bokade layoutBrahmapuri, 441206Mahendra Shrawanji Bokade & Others4139%19 Dec 2019Completed
CHAWHAN ROYALS TOWER-1CHAWHAN COLONY, 442401MANGESH RATILAL CHAWHAN410%18 Apr 2026Registered
ATHARVA PLAZABIYANI NAGAR,DEWAI GOVINDPUR RYT, 442401ATHARVA INFRA4010%16 Feb 2026Registered
GAURAV NAGARIBra, 441206Satish D Humne & Taufik N Pathan3887%28 Aug 2019Completed
9 Star HeightBhadravati, 4429029 Star Developers3711%7 Nov 2024Registered
RAJWADA TOWNSHIP PHASE IIChandrapur, 442501SKYLINE BUILDERS AND DEVELOPERS3776%2 Mar 2021Registered
Shree Dutta Pushpa PlazaNear Sawarkar Square, 441206Atul Dattatry Gourshettiwar3617%3 Jul 2024Registered
New Bramhapuri City-2Near Toll Plaza, 441206Sarita Bhaskar Makode350%25 Aug 2022Registration lapsed
Urkude Nagari -2Brahmapuri, 441206Manohar Marotrao Urkude359%11 Sep 2020Completed
GAJANAN PLAZA 4DEVAI GOVINDPUR RAYATWARI, 442401S V BUILDERS3468%3 Jan 2024Registered
S.R. Developers-1Mouza Udapur, 441206S. R. Developers3476%29 Apr 2024Registered
AK-FLORENZABALLARPUR, 442701ANKLESH NATHUJI KHAIRE3272%2 Nov 2022Registered
New Bramhapuri City-1Near Toll Plaza, 441206Meena Diwakar Makode310%19 Aug 2022Registration lapsed
RADHA HEIGHTSGANJ WARD, 442402M/s SALASAR INFRA3119%3 Oct 2024Registered
Gaurav Nagari-4Mouza - Delanwadi, 441206PMG Associates300%27 Jun 2023Registration lapsed
Namo Nagari Part - 1Near Kharbi gaon, 441206Amrapali Ravindra Meshram300%22 Sep 2020Registration lapsed
SKAND RESIDENCYCHANDA RAYYATWARI, 442401VAISHNAVI CONSTRUCTION300%15 Jun 2026Registered
GAURAV NAGARI 3Rajoli, 441212PMG Associates2945%20 Dec 2020Registration lapsed
CHAWHAN EMPIREMOUJE DEWAI GOVINDPUR RAYYATWARI, 441221CHAWHAN INFRATECH PRIVATE LIMITED2818%8 Jul 2025Registered
DELANWADIBramhapuri, 441206Prabhakar N Pilare and 4 others280%16 Feb 2022Registration lapsed
Radha Krushna NagariKurza, 441206Ashok Kisanlal Bhaiyya2681%3 Dec 2021Completed
SHREE VRUNDAVAN HEIGHTSBHANAPETH, 442401NEETA RAMESHCHANDRA SHAH268%18 Mar 2026Registered
Shree Gurukrupa LayoutMouza Khedmakta, 441206Shree Gurukrupa Builders And Developers2592%11 Mar 2024Completed
Vaibhav Laxmi NagariTah Brahamapuri, 441206Gangadhar Harihar Bhupal250%9 Feb 2022Registration lapsed
PILARE LAYOUTBramhapuri, 441206Rajesh Deoraoji Pilare2467%10 Jan 2022Registration lapsed
GAYATRI NAGARGONDI VIHIRGAO, 441224BANDU LAXMANRAO AHIRKAR23100%30 Mar 2021Completed
Lalaji TownshipOpp HP Petrol Pump, 441205Abhishek Rajan Jaiswal230%24 Jan 2022Completed
VASAVI DEVELOPERS GAT NO 801NEAR ITI COLLEGE, 441206Vasavi Developers2383%15 Aug 2021Completed
Gangaputra LayoutKhedmakta, 441206Indira Pramod Meshram220%8 Dec 2023Registration lapsed
Krushna Sneha NagariBramhapuri, 441206Gaurav Ashok Bhaiyya and Ashok K. Bhaiyya2040%22 Feb 2022Completed
KSHITIJRAJ NAGAR, 442507BLACK PEARL200%16 Jan 2021Registration lapsed
MATAI NAGARBrahmapuri, 441206Shri. Ashish Madanrao karande and Sau. Anjali Ashish Karande2060%15 Mar 2019Completed
Planning a launch in Chandrapur? The area market report packs one pincode's whole filed market into one document: every registration and what it has become, when the active stock promises to land, what the market absorbs, the operators and who finances them. A flat Rs 2,999 per pincode. Area report · Rs 2,999  Read a full sample

Developers active in Chandrapur

VIDARBHA TOWN DEVELOPERS (15), PMG Associates (7), VIBHA RAJESH THAKUR (7), Tushar Santosh Kumar Agarwal (5), GAJANAN MORESHWAR NILAWAR (5), Shree Gurukrupa Builders And Developers (4). Each link opens the promoter's track record built from their own filings.

Frequently asked questions

How do I shortlist among the Chandrapur projects listed above?

Compare each project against its neighbours, not against the brochure. The median project on this page is 18% booked, which is the benchmark to hold any single project against. A project selling much slower than the district may have a pricing or credibility problem; one selling much faster deserves a look at whether construction is keeping pace with collections. Then open the developer link to check their delivery record on other projects, and compare filed carpet areas rather than super built-up marketing areas.

What does a revised completion date on a Chandrapur project actually mean?

The promoter has moved their deadline with the regulator, usually under section 6, which allows an extension of up to one year for reasons beyond their control. It does not move the date in your agreement for sale: your section 18 claim for delay interest or refund runs from the possession date you signed for. Before booking a project with a revision on record, ask which approvals or works the new date depends on.

What stamp duty will I pay on a flat in Chandrapur district?

The rate depends on the local body: roughly 6 to 7 percent inside municipal corporations, 4 percent in municipal council areas and 3 percent in gram panchayat areas, with women buying in their sole name paying 1 percent less. The registration fee is 1 percent of value, capped at Rs 30,000. Duty is charged on the higher of your agreement value and the ready reckoner value. ReraGenie has a free Maharashtra stamp duty calculator under Tools.

What does it mean that some Chandrapur registrations have lapsed?

A RERA registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then, the registration lapses and the project stops being a registered project: the promoter may not legally market or sell in it, and the Authority can act under section 7 against a defaulting promoter. It does not cancel your agreement for sale or your section 18 rights if you have already booked, and it does not mean construction has stopped. Ask the promoter for the current registration position in writing, and verify it on the MahaRERA portal before you pay any further instalment.

What if a Chandrapur project shows strong sales but slow construction?

That shape means the promoter is collecting money faster than they are building, which is fine under a disciplined promoter and dangerous under a stretched one. The law helps: withdrawals from the project account need architect, engineer and CA certificates in proportion to progress. Check the promoter's delivery record, and watch the next quarterly filing (due within 20 days of each quarter end) to see whether the construction line moves.

Does something here look wrong, or is there a number you expected to find and did not? Every figure on this page is summed from the projects' own MahaRERA filings, and we read every report.

Report an errorShare feedback

Data from official MahaRERA filings.

Report an error or share feedback

About Chandrapur district. Every figure on this page is summed from the projects' own filings, so if a number looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.