ReraGenieLog inGet a buyer report

Home / Browse projects / Chandrapur, Maharashtra / CHAWHAN ROYALS

Registration lapsed No litigation declared Residential / Group Housing project

CHAWHAN ROYALS

By MANGESH RATILAL CHAWHAN

RG-MH-42852 · RERA P50900019244 · Last updated on MahaRERA portal: 7 Feb 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 13 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Chandrapur registration emailed to you, free during the pilot beta.
Sep 2025Possession promised13 months past this date
242 of 286Construction stages doneacross 26 buildings; furthest along: Excavation, 0%
0 of 126Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 159 documents Report an error

CHAWHAN ROYALS is a Residential / Group Housing project by MANGESH RATILAL CHAWHAN in Chandrapur, Maharashtra, registered with MahaRERA as P50900019244 on 14 Jan 2019. Possession was promised by 30 Sep 2025 and is now 13 months past that date. 126 of the 126 units on this registration are recorded sold or booked, and 242 of 286 construction stages are filed complete.

At a glance

Project

  • NameCHAWHAN ROYALS
  • TypeResidential / Group Housing
  • Location
    • DEWAI GOVINDPUR RYT.
    • MUL ROAD
    • Chandrapur (M Cl)
    • Chandrapur
    • 442401
  • Pincode442401
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50900019244
  • ReraGenie IDRG-MH-42852

Builder

  • NameMANGESH RATILAL CHAWHAN
  • Entity typeIndividual
  • GSTIN27ADRPC7033K1ZA
  • Other registrations1 more →
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

13 months past promisethis monthRegisteredJan 2019PromisedSep 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on14 Jan 2019
  • Promised completion30 Sep 2025
  • Revised completionNone
  • Buildings26 building records
  • Documents filed159 files

Current status

100%126 of 126 units booked

Figures as on 7 Feb 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ROW HOUSE 18NA22000
ROW HOUSE 19NA20101
ROW HOUSE 20NA20101
PROPOSED 1NA10000
PROPOSED 2NA10000
PROPOSED 3NA10000
PROPOSED 4NA10000
TOWER 1NA9842042
TOWER 2NA9042042
ROW HOUSENA20606
DUPLEX 1 AND 2NA20202
DUPLEX 3 AND 4NA20202
ROW HOUSE 5 AND 6NA20202
DUPLEX 7 AND 8NA20202
DUPLEX 9 AND 10NA20202
DUPLEX 11 AND 12NA20202
DUPLEX 13 AND 14NA20202
COMMERCIAL UNITNA5001212
ROW HOUSE 10NA20101
ROW HOUSE 11NA20101
ROW HOUSE 12NA20101
ROW HOUSE 13NA20101
ROW HOUSE 14NA20101
ROW HOUSE 15NA20101
ROW HOUSE 16NA20101
ROW HOUSE 17NA20101

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building20

As on 7 Feb 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection. The count above covers all 26 buildings; the table lists the first 20.

242 of 286 construction stages are filed complete across 26 buildings. The stage furthest along is Excavation, at 0%.

ROW HOUSE 18100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
ROW HOUSE 19100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
ROW HOUSE 20100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
PROPOSED 10%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
PROPOSED 20%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
PROPOSED 30%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
PROPOSED 40%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
TOWER 1100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
TOWER 2100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
ROW HOUSE100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
DUPLEX 1 AND 2100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
DUPLEX 3 AND 4100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
ROW HOUSE 5 AND 6100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
DUPLEX 7 AND 8100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
DUPLEX 9 AND 10100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
DUPLEX 11 AND 12100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
DUPLEX 13 AND 14100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
COMMERCIAL UNIT100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
ROW HOUSE 10100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
ROW HOUSE 11100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities16

As on 7 Feb 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%
LIFTYes100%

Parking filed270

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots270
Closed/Covered247
Open Space23
BuildingClosed/CoveredOpen SpaceTotal
ROW HOUSE 18011
ROW HOUSE 19011
ROW HOUSE 20011
PROPOSED 1011
PROPOSED 2011
PROPOSED 3011
PROPOSED 4011
TOWER 11010101
TOWER 21010101
ROW HOUSE011
DUPLEX 1 AND 2011
DUPLEX 3 AND 4011
ROW HOUSE 5 AND 6011
DUPLEX 7 AND 8011
DUPLEX 9 AND 10011
DUPLEX 11 AND 12011
DUPLEX 13 AND 14011
COMMERCIAL UNIT45045
ROW HOUSE 10011
ROW HOUSE 11011
ROW HOUSE 12011
ROW HOUSE 13011
ROW HOUSE 14011
ROW HOUSE 15011
ROW HOUSE 16011
ROW HOUSE 17011

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area9,000 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on24 Mar 2026

Approvals and building plan

Sanctioning authorityCHANDRAPUR MUNICIPAL CORPORATION
Permissible FSI5129.14
Proposed, not sanctioned5,129 sq m
Buildings approved26
Buildings sanctioned26

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPattiwar building near warora naka

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRAVI S PACHARE
EngineerSWAPNIL D BOKADE
Chartered AccountantRIYA UTTARWAR
PartnerRole in project
CHAWHAN ROYALS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 24 Dec 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 7 Sep 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 10 Jan 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 10 Jan 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 26 Feb 2025

Documents filed159

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 159 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: 1 Form 1 Architects Certificate 31 3 19.pdf7 Feb 2026
Form 2File: 1 Form 2 Engineer Certificate 31 3 19.pdf7 Feb 2026
Form 3File: 2 Form 3 Certificates of CA 31 03 19.pdf7 Feb 2026
Disclosure of Sold and Booked InventoryFile: 1 Disclosure of sold booked inventory.pdf7 Feb 2026
Form 1File: 2 Form 1 Architects Certificate 31 3 20.pdf7 Feb 2026
Form 2File: 2 Form 2 Engineer Certificate 31 3 20.pdf7 Feb 2026
Form 3File: 3 Form 3 Certificates of CA 31 03 20.pdf7 Feb 2026
Disclosure of Sold and Booked InventoryFile: 1 Disclosure of sold booked inventory.pdf7 Feb 2026
Form 1File: 2 Form 1 Architects Certificate 31 3 20.pdf7 Feb 2026
Form 2File: 2 Form 2 Engineer Certificate 31 3 20.pdf7 Feb 2026
Form 3File: 3 Form 3 Certificates of CA 31 03 20.pdf7 Feb 2026
Disclosure of Sold and Booked InventoryFile: 1 Disclosure of sold booked inventory.pdf7 Feb 2026
Form 1File: 2 Form 1 Architects Certificate 31 3 20.pdf7 Feb 2026
Form 2File: 2 Form 2 Engineer Certificate 31 3 20.pdf7 Feb 2026
Form 3File: 3 Form 3 Certificates of CA 31 03 20.pdf7 Feb 2026
Disclosure of Sold and Booked InventoryFile: 1 Disclosure of sold booked inventory.pdf7 Feb 2026
Form 1File: 2 Form 1 Architects Certificate 31 3 20.pdf7 Feb 2026
Form 2File: 2 Form 2 Engineer Certificate 31 3 20.pdf7 Feb 2026
Form 3File: 3 Form 3 Certificates of CA 31 03 20.pdf7 Feb 2026
Disclosure of Sold and Booked InventoryFile: 1 Disclosure of sold booked inventory.pdf7 Feb 2026
Form 1File: 3 Form 1 Architects Certificate 31 3 21.pdf7 Feb 2026
Form 2File: 3 Form 2 Engineer Certificate 31 3 21.pdf7 Feb 2026
Form 3File: 4 Form 3 Certificates of CA 31 03 21.pdf7 Feb 2026
Disclosure of Sold and Booked InventoryFile: 1 Disclosure of sold booked inventory.pdf7 Feb 2026
Form 1File: 3 Form 1 Architects Certificate 31 3 21.pdf7 Feb 2026
Form 2File: 3 Form 2 Engineer Certificate 31 3 21.pdf7 Feb 2026
Form 3File: 4 Form 3 Certificates of CA 31 03 21.pdf7 Feb 2026
Disclosure of Sold and Booked InventoryFile: 1 Disclosure of sold booked inventory.pdf7 Feb 2026
Form 1File: 3 Form 1 Architects Certificate 31 3 21.pdf7 Feb 2026
Form 2File: 3 Form 2 Engineer Certificate 31 3 21.pdf7 Feb 2026
Form 3File: 4 Form 3 Certificates of CA 31 03 21.pdf7 Feb 2026
Disclosure of Sold and Booked InventoryFile: 1 Disclosure of sold booked inventory.pdf7 Feb 2026
Form 1File: 3 Form 1 Architects Certificate 31 3 21.pdf7 Feb 2026
Form 2File: 3 Form 2 Engineer Certificate 31 3 21.pdf7 Feb 2026
Form 3File: 4 Form 3 Certificates of CA 31 03 21.pdf7 Feb 2026
Disclosure of Sold and Booked InventoryFile: 1 Disclosure of sold booked inventory.pdf7 Feb 2026
Form 1File: 4 Form 1 Architects Certificate 31 3 22.pdf7 Feb 2026
Form 2File: 4 Form 2 Engineer Certificate 21 12 21.pdf7 Feb 2026
Form 3File: 5 Form 3 Certificates of CA 21 12 21.pdf7 Feb 2026
Disclosure of Sold and Booked InventoryFile: 1 Disclosure of sold booked inventory.pdf7 Feb 2026
Form 1File: 4 Form 1 Architects Certificate 31 3 22.pdf7 Feb 2026
Form 2File: 4 Form 2 Engineer Certificate 21 12 21.pdf7 Feb 2026
Form 3File: 5 Form 3 Certificates of CA 21 12 21.pdf7 Feb 2026
Disclosure of Sold and Booked InventoryFile: 1 Disclosure of sold booked inventory.pdf7 Feb 2026
Form 1File: 4 Form 1 Architects Certificate 31 3 22.pdf7 Feb 2026
Form 2File: 4 Form 2 Engineer Certificate 21 12 21.pdf7 Feb 2026
Form 3File: 5 Form 3 Certificates of CA 21 12 21.pdf7 Feb 2026
Disclosure of Sold and Booked InventoryFile: 1 Disclosure of sold booked inventory.pdf7 Feb 2026
Form 1File: 4 Form 1 Architects Certificate 31 3 22.pdf7 Feb 2026
Form 2File: 5 Form 2 Engineer Certificate 31 3 22.pdf7 Feb 2026
Form 3File: 6 Form 3 Certificates of CA 31 03 22.pdf7 Feb 2026
Disclosure of Sold and Booked InventoryFile: 1 Disclosure of sold booked inventory.pdf7 Feb 2026
Form 1File: 5 Form 1 Architects Certificate 30 6 22.pdf7 Feb 2026
Form 2File: 6 Form 2 Engineer Certificate 30 6 22.pdf7 Feb 2026
Form 3File: 7 Form 3 Certificates of CA 30 06 22.pdf7 Feb 2026
Disclosure of Sold and Booked InventoryFile: 1 Disclosure of sold booked inventory.pdf7 Feb 2026
Form 1File: 6 Form 1 Architects Certificate 30 9 22.pdf7 Feb 2026
Form 2File: 7 Form 2 Engineer Certificate 30 9 22.pdf7 Feb 2026
Form 3File: 8 Form 3 Certificates of CA 30 09 22.pdf7 Feb 2026
Disclosure of Sold and Booked InventoryFile: 1 Disclosure of sold booked inventory.pdf7 Feb 2026
Form 1File: 7 Form 1 Architects Certificate 31 12 22.pdf7 Feb 2026
Form 2File: 8 Form 2 Engineer Certificate 31 12 22.pdf7 Feb 2026
Form 3File: 9 Form 3 Certificates of CA 31 12 22.pdf7 Feb 2026
Disclosure of Sold and Booked InventoryFile: 1 Disclosure of sold booked inventory.pdf7 Feb 2026
Form 1File: 8 Form 1 Architects Certificate 31 3 23.pdf7 Feb 2026
Form 2File: 9 Form 2 Engineer Certificate 31 3 23.pdf7 Feb 2026
Form 3File: 10 Form 3 Certificates of CA 31 03 23.pdf7 Feb 2026
Disclosure of Sold and Booked InventoryFile: 1 Disclosure of sold booked inventory.pdf7 Feb 2026
Form 1File: 9 Form 1 Architects Certificate 30 6 23.pdf7 Feb 2026
Form 2File: 10 Form 2 Engineer Certificate 30 6 23.pdf7 Feb 2026
Form 3File: 11 Form 3 Certificates of CA 30 06 23.pdf7 Feb 2026
Disclosure of Sold and Booked InventoryFile: 1 Disclosure of sold booked inventory.pdf7 Feb 2026
Form 1File: 10 Form 1 Architects Certificate 30 9 23.pdf7 Feb 2026
Form 2File: 11 Form 2 Engineer Certificate 30 9 23.pdf7 Feb 2026
Form 3File: 12 Form 3 Certificates of CA 30 09 23.pdf7 Feb 2026
Disclosure of Sold and Booked InventoryFile: 1 Disclosure of sold booked inventory.pdf7 Feb 2026
Form 1File: 11 Form 1 Architects Certificate 31 12 23.pdf7 Feb 2026
Form 2File: 12 Form 2 Engineer Certificate 3112 23.pdf7 Feb 2026
Form 3File: 13 Form 3 Certificates of CA 31 12 23.pdf7 Feb 2026
Disclosure of Sold and Booked InventoryFile: 1 Disclosure of sold booked inventory.pdf7 Feb 2026

How this compares with Chandrapur

100%of this project is bookeddistrict median 18%
10%of Chandrapur projects moved their completion datethis one has not
39%of Chandrapur registrations have lapsed or been cancelledthis one is among them

Computed across the 220+ Chandrapur projects on ReraGenie, from their own filings.

Keep CHAWHAN ROYALS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MUL ROAD220+ in Chandrapur

2 kmCHAWHAN ROYALSLapsed / revoked 2Other 4Dot size: filed unitsN

Filed coordinates, straight-line distance. 6 registered projects within 2 km.

Builder: MANGESH RATILAL CHAWHAN

MANGESH RATILAL CHAWHAN has 2 registrations on MahaRERA, including CHAWHAN ROYALS and CHAWHAN ROYALS TOWER-1. Its filings disclose 1 earlier MahaRERA project, none completed yet. Read the full track record. See more projects on the Chandrapur district page.

Frequently asked questions

What does it mean that CHAWHAN ROYALS shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if CHAWHAN ROYALS is delayed beyond 30 Sep 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of CHAWHAN ROYALS?

The registered promoter entity is MANGESH RATILAL CHAWHAN, an individual as per the filing. Its GSTIN 27ADRPC7033K1ZA can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in CHAWHAN ROYALS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for CHAWHAN ROYALS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at CHAWHAN ROYALS?

The professionals named in the filing: Architect: RAVI S PACHARE; Engineer: SWAPNIL D BOKADE; Chartered Accountant: RIYA UTTARWAR. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in CHAWHAN ROYALS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About CHAWHAN ROYALS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save CHAWHAN ROYALS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.