Registered No litigation declared Others project

GAJANAN PLAZA 4

By S V BUILDERS

RG-MH-56804 · RERA P50900054202 · Last updated on MahaRERA portal: 25 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Chandrapur registration emailed to you, free during the pilot beta.
Oct 2027Possession promisedno revision filed
10 of 11Construction stages donefurthest along: Sanitary Fittings within the flats /..., 99%
11 of 34Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 119 documents Report an error

GAJANAN PLAZA 4 is a Others project by S V BUILDERS in Chandrapur, Maharashtra, registered with MahaRERA as P50900054202 on 3 Jan 2024. Possession is promised by 31 Oct 2027. 23 of the 34 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete.

At a glance

Project

  • NameGAJANAN PLAZA 4
  • TypeOthers
  • Location
    • CHAWHAN COLONY
    • SARKAR NAGAR
    • DEVAI GOVINDPUR RAYATWARI
    • Chandrapur (M Cl)
    • Chandrapur
    • 442401
  • Pincode442401
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50900054202
  • ReraGenie IDRG-MH-56804

Builder

  • NameS V BUILDERS
  • Entity typePartnership
  • PartnersVIBHA RAJESH SINGH, SAROJ SANDIP AWARI
  • Other registrations2 more →
  • Completed1 of 3
  • Declared earlier projects1 →

Key dates

this monthRegisteredJan 2024PromisedOct 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on3 Jan 2024
  • Promised completion31 Oct 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed119 files

Current status

68%23 of 34 units booked
99.7%Work done, per cost certificate

Figures as on 25 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
GAJANAN PLAZA 4NA7626834

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 25 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 99%.

GAJANAN PLAZA 4: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises99%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 25 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area955 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on2 Jul 2025
LandownerVillageDistrict
SAROJ SANDIP AWARIChandrapur (M Cl)Chandrapur
VIBHA RAJESH SINGHChandrapur (M Cl)Chandrapur

Approvals and building plan

Sanctioning authorityChandrapur Municipal Corporation
Permissible FSI2790.22
Proposed, not sanctioned2,790 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNAGAR PARISHAD COMPLEX GANDHI CHOWK CHANDRAPUR
Estimated costRs 4.50 cr
Cost incurredRs 4.49 cr
Work done99.67%
BuildingWingEstimatedIncurred
GAJANAN PLAZA 4NARs 4.50 crRs 4.49 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDEVENDRA MOTWANI
EngineerSWAPNIL D BOKADE
EngineerVAIBHAV NARENDRA HEDAU
Chartered AccountantRIYA UTTARWAR
Chartered AccountantMURTAZA KAPASI
PartnerRole in project
S V BUILDERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 6 Nov 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 6 Nov 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 6 Nov 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 6 Nov 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Oct 2027

Documents filed119

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 119 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1 FINAL.pdf25 Apr 2026
Withdrawal Update Form 2File: FORM 2 FINAL.pdf25 Apr 2026
Withdrawal Update Form 3File: FORM 3 FINAL.pdf25 Apr 2026
Withdrawal Update Form 1File: FORM 1 Q-3.pdf28 Jan 2026
Withdrawal Update Form 2File: FORM 2 Q-3.pdf28 Jan 2026
Withdrawal Update Form 3File: FORM 3 Q3.pdf28 Jan 2026
Withdrawal Update Form 1File: FORM 1 SV BUILDERS .pdf2 Dec 2025
Withdrawal Update Form 1File: FORM 1 SV BUILDERS .pdf2 Dec 2025
Withdrawal Update Form 1File: FORM 1 SV BUILDERS .pdf2 Dec 2025
Withdrawal Update Form 1File: FORM 1 SV BUILDERS .pdf2 Dec 2025
Withdrawal Update Form 1File: FORM 1 SV BUILDERS .pdf2 Dec 2025
Withdrawal Update Form 1File: FORM 1 SV BUILDERS .pdf2 Dec 2025
Withdrawal Update Form 1File: FORM 1 SV BUILDERS .pdf2 Dec 2025
Withdrawal Update Form 1File: FORM 1 SV BUILDERS .pdf2 Dec 2025
Withdrawal Update Form 1File: FORM 1 SV BUILDERS .pdf2 Dec 2025
Withdrawal Update Form 2File: FORM 2 SV BUILDERS .pdf2 Dec 2025
Withdrawal Update Form 2File: FORM 2 SV BUILDERS .pdf2 Dec 2025
Withdrawal Update Form 2File: FORM 2 SV BUILDERS .pdf2 Dec 2025
Withdrawal Update Form 2File: FORM 2 SV BUILDERS .pdf2 Dec 2025
Withdrawal Update Form 2File: FORM 2 SV BUILDERS .pdf2 Dec 2025
Withdrawal Update Form 2File: FORM 2 SV BUILDERS .pdf2 Dec 2025
Withdrawal Update Form 2File: FORM 2 SV BUILDERS .pdf2 Dec 2025
Withdrawal Update Form 2File: FORM 2 SV BUILDERS .pdf2 Dec 2025
Withdrawal Update Form 2File: FORM 2 SV BUILDERS .pdf2 Dec 2025
Withdrawal Update Form 3File: FORM 3 SV BUILDERS .pdf2 Dec 2025
Withdrawal Update Form 3File: FORM 3 SV BUILDERS .pdf2 Dec 2025
Withdrawal Update Form 3File: FORM 3 SV BUILDERS .pdf2 Dec 2025
Withdrawal Update Form 3File: FORM 3 SV BUILDERS .pdf2 Dec 2025
Withdrawal Update Form 3File: FORM 3 SV BUILDERS .pdf2 Dec 2025
Withdrawal Update Form 3File: FORM 3 SV BUILDERS .pdf2 Dec 2025
Withdrawal Update Form 3File: FORM 3 SV BUILDERS .pdf2 Dec 2025
Withdrawal Update Form 3File: FORM 3 SV BUILDERS .pdf2 Dec 2025
Withdrawal Update Form 3File: FORM 3 SV BUILDERS .pdf2 Dec 2025
Form 1File: 2 Form 1 March 2024.pdf26 Nov 2025
Form 2File: gajanan plaza 4 form 2 31 03 24 2.pdf26 Nov 2025
Form 3File: 2 Form 3 MAR 24.pdf26 Nov 2025
Disclosure of Sold and Booked InventoryFile: 2 Form 3 MAR 24.pdf26 Nov 2025
Form 1File: 3 Form 1 June 2024.pdf26 Nov 2025
Form 2File: Form 2 30th June 2024.pdf26 Nov 2025
Form 3File: 3 Form 3 30th June 2024.pdf26 Nov 2025
Disclosure of Sold and Booked InventoryFile: 3 Form 3 30th June 2024.pdf26 Nov 2025
Form 1File: 4 Form 1 September 2024.pdf26 Nov 2025
Form 2File: Form 2 30th September 2024.pdf26 Nov 2025
Form 3File: 4 Form 3 30th September 2024.pdf26 Nov 2025
Disclosure of Sold and Booked InventoryFile: 4 Form 3 30th September 2024.pdf26 Nov 2025
Form 1File: 5 Form 1 December 2024.pdf26 Nov 2025
Form 2File: Form 2 30th December 2024.pdf26 Nov 2025
Form 3File: 5 Form 3 31st December 2024.pdf26 Nov 2025
Disclosure of Sold and Booked InventoryFile: 5 Form 3 31st December 2024.pdf26 Nov 2025
Form 1File: 6 Form 1 March 2025.pdf26 Nov 2025
Form 2File: from 2.pdf26 Nov 2025
Form 3File: 6 FORM 3 MAR 25.pdf26 Nov 2025
Disclosure of Sold and Booked InventoryFile: 6 FORM 3 MAR 25.pdf26 Nov 2025
Form 2A (FY 2023-2024)File: Gajanan plaza 4, 2A-form(2024)_page-0001.pdf26 Nov 2025
Withdrawal Update Form 1File: FORM 1 SV BUILDERS .pdf22 Nov 2025
Withdrawal Update Form 2File: FORM 2 SV BUILDERS .pdf22 Nov 2025
Withdrawal Update Form 3File: FORM 3 SV BUILDERS .pdf22 Nov 2025
Form 5 (FY 2024-2025)File: SV BUILDERS.pdf12 Nov 2025
Form 5 (FY 2023-2024)File: FORM 5 GAJANAN PLAZA 4.pdf11 Nov 2025
Withdrawal Update Form 1File: FORM 1 FINAL.pdf22 Jul 2025
Withdrawal Update Form 1File: FORM 1 FINAL.pdf22 Jul 2025
Withdrawal Update Form 2File: Form 2 CERTIFICATE.pdf22 Jul 2025
Withdrawal Update Form 2File: Form 2 CERTIFICATE.pdf22 Jul 2025
Withdrawal Update Form 3File: Form 3 Gajanan Plaza 4 30 06 24 3.pdf22 Jul 2025
Withdrawal Update Form 3File: Form 3 Gajanan Plaza 4 30 06 24 3.pdf22 Jul 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Gajanan plaza 4, 2A-form(2024)_page-0001.pdf18 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 GAJANAN PLAZA 4.pdf17 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 30th September 2024.pdf19 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 December 2024.pdf19 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 30th September 2024.pdf15 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 31st December 2024.pdf15 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 30th June 2024.pdf15 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 30th September 2024.pdf15 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 30th December 2024.pdf15 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Gajanan plaza 4 31 12 2023 1.pdf8 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Gajanan plaza4 31 03 2024 2.pdf8 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Gajanan plaza4 30 06 2024 3.pdf8 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: gajanan plaza 4 form 2 31 12 23 1.pdf8 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: gajanan plaza 4 form 2 31 03 24 2.pdf8 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 gajanan plaza 4 31 12 23 1.pdf8 Aug 2024

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
GAJANAN PLAZA 3PLOT NO 3 SURVEY NO 107 43 1 DEVAI GOVINDPUR RAYATWARI CHNDRAPUR31CompletedOct 2023Sep 2023

How this compares with Chandrapur

68%of this project is bookeddistrict median 18%
10%of Chandrapur projects moved their completion datethis one has not
39%of Chandrapur registrations have lapsed or been cancelledthis one is on the register

Computed across the 220+ Chandrapur projects on ReraGenie, from their own filings.

Keep GAJANAN PLAZA 4 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near DEVAI GOVINDPUR RAYATWARI220+ in Chandrapur

2 kmGAJANAN PLAZA 4Completed 8Lapsed / revoked 7Other 3Dot size: filed unitsN

Filed coordinates, straight-line distance. 18 registered projects within 2 km.

Builder: S V BUILDERS

S V BUILDERS has 3 registrations on MahaRERA, including GAJANAN PLAZA 3 and AL AMIN TOWER. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Chandrapur district page.

Frequently asked questions

What are my rights if GAJANAN PLAZA 4 is delayed beyond 31 Oct 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of GAJANAN PLAZA 4?

The registered promoter entity is S V BUILDERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in GAJANAN PLAZA 4?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for GAJANAN PLAZA 4?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at GAJANAN PLAZA 4?

The professionals named in the filing: Architect: DEVENDRA MOTWANI; Engineer: SWAPNIL D BOKADE; Engineer: VAIBHAV NARENDRA HEDAU; Chartered Accountant: RIYA UTTARWAR; Chartered Accountant: MURTAZA KAPASI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GAJANAN PLAZA 4?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GAJANAN PLAZA 4. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GAJANAN PLAZA 4 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.