Home / Browse projects / Thane, Maharashtra / VIGHNAHARTA CO-OP HSG.SOCIETY
VIGHNAHARTA CO-OP HSG.SOCIETY
By Gaurivinayak Builders and Developers Pvt Ltd
RG-MH-06472 · RERA P51700055012 · Last updated on MahaRERA portal: 5 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 11 other registrations.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
VIGHNAHARTA CO-OP HSG.SOCIETY is a Residential / Group Housing project by Gaurivinayak Builders and Developers Pvt Ltd in Thane, Maharashtra, registered with MahaRERA as P51700055012 on 26 Feb 2024. Possession is promised by 31 Dec 2028.
At a glance
Project
- NameVIGHNAHARTA CO-OP HSG.SOCIETY
- TypeResidential / Group Housing
- Location
- poona link road
- Kalyan E
- Tisgaon
- Kalyan
- Thane
- 421306
- Pincode421306
- RERA no.P51700055012
- ReraGenie IDRG-MH-06472
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on26 Feb 2024
- Promised completion31 Dec 2028
- Revised completionNone
- Buildings1 building record
- Documents filed58 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Vighnaharta Co op Hsg Society | NA | 8 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 5 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 9%.
Vighnaharta Co op Hsg Society: 1% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 9% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 5 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed87
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Vighnaharta Co-op Hsg Society | Tisgaon | Thane |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | DILIP TAMBDAY & ASSOCIATES |
| Engineer | Rajesh Thakre & Associates |
| Chartered Accountant | Gayakwad & Arracken |
| Chartered Accountant | SUNIL MADHUKAR GAYAKWAD |
| Partner | Role in project |
|---|---|
| Gauri Vinayak Builder and Developers Pvt Ltd | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 14 Oct 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 17 Aug 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 17 Aug 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 16 Aug 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2028
Documents filed58
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: GAURIVINAYK VIGHANAHARTH ARCHITECTS CERTIFICAT MARCH 2025.pdf | 5 Jun 2026 |
| Form 2File: GAURIVINAYAK VIGHANHARTHA ENGINEERS CERTIFICATE MARCH 2025.pdf | 5 Jun 2026 |
| Form 3File: GAURIVINAYAK VIGHANHARTA FORM 03 MARCH 2025.pdf | 5 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: GAURIVINAYK SOLD UNSOLD VIGHNAHARTA MARCH 2025.pdf | 5 Jun 2026 |
| Form 1File: GAURIVINAYK VIGHANAHARTH ARCHITECTS CERTIFICAT JUNE 2025.pdf | 5 Jun 2026 |
| Form 2File: GAURIVINAYAK VIGHANHARTHA ENGINEERS CERTIFICATE JUNE 2025.pdf | 5 Jun 2026 |
| Form 3File: GAURIVINAYAK VIGHANHARTA FORM 03 JUNE 2025.pdf | 5 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: GAURIVINAYK SOLD UNSOLD VIGHNAHARTA JUNE 2025.pdf | 5 Jun 2026 |
| Form 1File: GAURIVINAYK VIGHANAHARTH ARCHITECTS CERTIFICAT SEP 2025.pdf | 5 Jun 2026 |
| Form 2File: GAURIVINAYAK VIGHANHARTHA ENGINEERS CERTIFICATE SEP 2025.pdf | 5 Jun 2026 |
| Form 3File: GAURIVINAYAK VIGHANHARTA FORM 03 SEP 2025.pdf | 5 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: GAURIVINAYK SOLD UNSOLD VIGHNAHARTA SEP 2025.pdf | 5 Jun 2026 |
| Form 1File: GAURIVINAYK VIGHANAHARTH ARCHITECTS CERTIFICAT DEC 2025.pdf | 5 Jun 2026 |
| Form 2File: GAURIVINAYAK VIGHANHARTHA ENGINEERS CERTIFICATE DEC 2025.pdf | 5 Jun 2026 |
| Form 3File: GAURIVINAYAK VIGHANHARTA FORM 03 DEC 2025.pdf | 5 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: GAURIVINAYK SOLD UNSOLD VIGHNAHARTA DEC 2025.pdf | 5 Jun 2026 |
| Form 1File: GAURIVINAYK VIGHANAHARTH ARCHITECTS CERTIFICAT MARCH 2026.pdf | 5 Jun 2026 |
| Form 2File: GAURIVINAYAK VIGHANHARTHA ENGINEERS CERTIFICATE MARCH 2026.pdf | 5 Jun 2026 |
| Form 3File: GAURIVINAYAK VIGHANHARTA FORM MARCH 2026.pdf | 5 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: GAURIVINAYK SOLD UNSOLD VIGHNAHARTA MARCH 2026.pdf | 5 Jun 2026 |
| Form 5 (FY 2024-2025)File: FORM 5 VIGHNAHARTA CO OPHSG SOCIETY MARCH 2025.pdf | 12 Nov 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: GAURIVINAYAK FORM-3 VIGHNAHARTA CO-OP HSG SOCIETYBLTD 31-12-20.pdf | 21 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: VIGHNAHARTA CO-PO HSG COCIETY.pdf | 21 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: VIGHNAHARTA ENGINEER S CERTIFICATE FORM-2 31-03-2024.pdf | 7 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: VIGHNAHARTA ENGINEER S CERTIFICATE FORM-2 30-06-2024.pdf | 7 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: VIGHNAHARTA ENGINEER S CERTIFICATE FORM-2 30-09-2024.pdf | 7 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: VIGHNAHARTA ENGINEER S CERTIFICATE QUALITY ASSURANCE FORM-2 31-.pdf | 7 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: VIGHNAHARTA SOCIETY FORM-3 31-03-2024.pdf | 3 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: VIGHNAHARTA SOCIETY FORM-3 30-06-2024.pdf | 3 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: VIGHNAHARTA SOCIETY FORM-3 30-09-2024.pdf | 3 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM-2A VIGHNAHARTA 31-03-2024.pdf | 3 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form No 5_VIGHNAHARTA CHS as on 31-03-2024.pdf | 19 Dec 2024 |
| Other - FinanceFile: Gauri Vinayak Declaration 15-02-2024.pdf | 15 Feb 2024 |
| PAN CardFile: GetUserDocumentFileContent.pdf | 7 Feb 2024 |
| PAN CardFile: pan gauri.pdf | 11 Jan 2024 |
| Copy of the legal title reportFile: VIGHNAHARTA new TITLE.pdf | 14 Oct 2023 |
| CERSAI detailsFile: CER VIGHNAHARTA.pdf | 4 Sep 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: SAN G DEC.pdf | 4 Sep 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: order Dev.pdf | 4 Sep 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: BANK AC VIGHNAHARTA.pdf | 4 Sep 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 VIGHNAHARTA NEW.pdf | 21 Aug 2023 |
| Layout approvalFile: vighnaharta lay.pdf | 17 Aug 2023 |
| Building plan approvalFile: v plan.pdf | 17 Aug 2023 |
| Details of encumbrances concerned to FinanceFile: NO ENCUMBRANCE CERTIFICATE fin.pdf | 17 Aug 2023 |
| Details of encumbrances concerned to LegalFile: NO ENCUMBRANCE CERTIFICATE fin.pdf | 17 Aug 2023 |
| Copy of Layout Approval (in case of layout)File: vighnaharta lay.pdf | 17 Aug 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: v plan.pdf | 17 Aug 2023 |
| Declaration about Commencement CertificateFile: COMMECEMENT CERTIFICATE.pdf | 17 Aug 2023 |
| Declaration in FORM BFile: Form B GAURIVINAYAK BUILDERS AND DEVELOPERS PVT LTD.pdf | 17 Aug 2023 |
| Proforma of Agreement for saleFile: Model_AFS_in_English vighnaharta new.pdf | 17 Aug 2023 |
| Proforma of Allotment letterFile: ALLOTMENTLETTER vighnaharta.pdf | 17 Aug 2023 |
| Details of encumbrances concerned to FinanceFile: NO ENCU - 2.pdf | 16 Aug 2023 |
| Details of encumbrances concerned to LegalFile: NO ENCU - 2.pdf | 16 Aug 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: cc vighnaharta.pdf | 16 Aug 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE_PROJECT VIGHNAHARTA.pdf | 16 Aug 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERTIFICATE_PROJECT VIGHNAHARTA.pdf | 16 Aug 2023 |
| Deviation Report with respect to Allotment letterFile: ALLOTEMENT LETTER.pdf | 16 Aug 2023 |
| Deviation Report with respect to model copy of AgreementFile: draft agreemant.pdf | 16 Aug 2023 |
Promoter's earlier projects9
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| VIGHNAHARTA CO-OP HSG.SOCIETYp51700055012 | Survey no 11 Hissa no 1, poona link road, Kalyan E, Tisgaon, Kalyan, Thane, 421306, MAHARASHTRA | - | - | Certificate Signed | Dec 2028 | Not due yet |
| ASHTAVINAYAK PARK CO-OP.HSG SOCIETY LTDp51700053952 | Survey no 8 Hissa no 5B, Tisgaon, Kalyan E, Tisgaon, Kalyan, Thane, 421306, MAHARASHTRA | - | - | Certificate Signed | Dec 2028 | Not due yet |
| METRO PRIDEp51700052871 | Gut No 2, KACHORE GAON, KALYAN, KACHORE, Kalyan, Thane, 421301, MAHARASHTRA | - | - | Certificate Signed | Dec 2027 | Not due yet |
| SHUBHAM MONOLITH D WINGp51700049500 | Survey no 30 Hissa no 15A, Survey no 31/1,2, and 19, kalyan E, KALYAN , Tisgaon, Kalyan, Thane, 421306, MAHARASHTRA | - | - | Certificate Signed | Dec 2026 | Not due yet |
| SHUBHAM MONOLITHP51700022647 | TISGAON, Thane | - | Oct 2019 | Certificate Signed | May 2024 | Not delivered |
| KASHISH GALAXY PHASE 1,2 | AT MALUJE KACHORE GAT NO 2 4 7 5 NARAYAN NAGAR KALYAN E | 316 | - | Completed | Dec 2016 | Dec 2016 |
| MITALI HEIGHTS | SURVEY NO 29 HISSA NO 43 16 17 | 117 | - | Completed | Nov 2015 | Nov 2015 |
| SHUBHAM COMPLEX -2 | AT MAUJE TISGAON SURVEY NO 30 HISSA NO 12 13 GAVLI NAGAR KALYAN E | 76 | - | Completed | Mar 2015 | Mar 2015 |
| SOHAN TOWER | SURVEY NO 31 HISSA NO 12 GAVALI NAGAR TISGAON KALYAN E | 94 | - | Completed | Jun 2014 | Jun 2014 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 11 other registrations, which the RERA portal never shows together
- All 58 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep VIGHNAHARTA CO-OP HSG.SOCIETY on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Kalyan E7,600+ in Thane
Kohinoor Eden
KGI REALTY PRIVATE LIMITED
Olympia City Phase 1
Balaji Rattan Lifespaces
Krishna Trident
Sonawane Infrastructure Private Limited
Rai s Heaven
RAI RESIDENCY Private Limited
Metro Grande Tower C and D
West Pioneer Properties India Pvt Ltd
SEASON SAHARA BUILDING NO 4 AND 5
SAMARTH SAI BUILDERS & DEVELOPERS
See every Thane project, with the district possession charts
Builder: Gaurivinayak Builders and Developers Pvt Ltd
Gaurivinayak Builders and Developers Pvt Ltd has 12 registrations on MahaRERA, including BISTURIBAI TOWER and EKNATH ENCLAVE. Its filings disclose 9 earlier MahaRERA projects: declares 4 of 4 past projects completed on time. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What are my rights if VIGHNAHARTA CO-OP HSG.SOCIETY is delayed beyond 31 Dec 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of VIGHNAHARTA CO-OP HSG.SOCIETY?
The registered promoter entity is Gaurivinayak Builders and Developers Pvt Ltd, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in VIGHNAHARTA CO-OP HSG.SOCIETY?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for VIGHNAHARTA CO-OP HSG.SOCIETY?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at VIGHNAHARTA CO-OP HSG.SOCIETY?
The professionals named in the filing: Architect: DILIP TAMBDAY & ASSOCIATES; Engineer: Rajesh Thakre & Associates; Chartered Accountant: Gayakwad & Arracken; Chartered Accountant: SUNIL MADHUKAR GAYAKWAD. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in VIGHNAHARTA CO-OP HSG.SOCIETY?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback