Home / Browse projects / Mumbai Suburban, Maharashtra / Vidyalankar CHSL
Vidyalankar CHSL
By DESAI RESIDENCY PRIVATE LIMITED
RG-MH-05868 · RERA P51800052458 · Last updated on MahaRERA portal: 12 Jun 2026
Source: official MahaRERA filing
Red flags
- Completion date moved by 12 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Vidyalankar CHSL is a Residential / Group Housing project by DESAI RESIDENCY PRIVATE LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800052458 on 8 Sep 2023. The registration is recorded completed; possession was promised by 31 Jul 2026. The completion date has moved by 12 months from the original filing. 7 of the 20 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete.
At a glance
Project
- NameVidyalankar CHSL
- TypeResidential / Group Housing
- Location
- Ram Mandir Road
- Vile parle East
- Vileparle
- Andheri
- Mumbai Suburban
- 400057
- Pincode400057
- RERA no.P51800052458
- ReraGenie IDRG-MH-05868
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on8 Sep 2023
- Promised completion31 Jul 2026
- Revised completionRevised to 31 Jul 2026 (originally 31 Jul 2025)
- Buildings1 building record
- Documents filed54 files
Current status
Figures as on 12 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Vidyalankar CHSL | NA | 10 | 10 | 20 | 0 | 20 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 12 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
6 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 90%.
Vidyalankar CHSL: 79% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 90% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 90% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90% |
Progress on shared amenities15
As on 12 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 90% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed32
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Vidyalankar CHSL | Vileparle | Mumbai Suburban |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Vidyalankar CHSL | NA | Rs 8.65 cr | Rs 8.03 cr |
| - | NA | Rs 18.62 lakh | Rs 5.01 lakh |
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | saumil jhaveri |
| Engineer | Mr. Aditya Mehta |
| Chartered Accountant | NEHALI & CO |
| Partner | Role in project |
|---|---|
| DESAI RESIDENCY PRIVATE LIMITED | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterWith reference to above subject, we would like to bring to your information that one of the Garage known as Litigant, filed a suit on 08.02.2023 in City arage occupaers in above mentioned Vidyalankar Society while we obtained CC for our project on 20.02.2023. in City Civil Court. Dindoshi which was located in This litigant was not ready to vacate his premises which the exact place of the tower parking in the new building premises. Due to which, we the develop Hon'ble High Cour developer M/s Desai Residency Pvt. Ltd. filed appeal in Court on 24.03 2023 and the Honl 19 10 2023 to ätigant to vaca
Litigation declared2
| Case | Court | Status |
|---|---|---|
| 445 OF 2023/2023 | CITY CIVIL DINDOSHI | PENDING |
| 8802 OF 2023/2023 | HIGH COURT MUMBAI | PENDING |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 23 Aug 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 12 May 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 12 May 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 24 Aug 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed54
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: form 1.pdf | 12 Jun 2026 |
| Withdrawal Update Form 2File: form 2 march 26 signed.pdf | 12 Jun 2026 |
| Withdrawal Update Form 3File: form 3.pdf | 12 Jun 2026 |
| Occupational CertificateFile: 2522868_OC_signed.pdf | 12 Jun 2026 |
| Withdrawal Update Form 1File: form 1.pdf | 4 Jun 2026 |
| Withdrawal Update Form 2File: form 2 dec 25 signed.pdf | 4 Jun 2026 |
| Withdrawal Update Form 3File: form 3.pdf | 4 Jun 2026 |
| Withdrawal Update Form 1File: form 1 june 25.pdf | 27 Sep 2025 |
| Withdrawal Update Form 1File: form 1 june 25.pdf | 27 Sep 2025 |
| Withdrawal Update Form 1File: form 1 june 25.pdf | 27 Sep 2025 |
| Withdrawal Update Form 1File: form 1 june 25.pdf | 27 Sep 2025 |
| Withdrawal Update Form 2File: form 2 june 25.pdf | 27 Sep 2025 |
| Withdrawal Update Form 2File: form 2 june 25.pdf | 27 Sep 2025 |
| Withdrawal Update Form 2File: form 2 june 25.pdf | 27 Sep 2025 |
| Withdrawal Update Form 2File: form 2 june 25.pdf | 27 Sep 2025 |
| Withdrawal Update Form 3File: Form 3 - RERA Vidyalankar.pdf | 27 Sep 2025 |
| Withdrawal Update Form 3File: Form 3 - RERA Vidyalankar.pdf | 27 Sep 2025 |
| Withdrawal Update Form 3File: Form 3 - RERA Vidyalankar.pdf | 27 Sep 2025 |
| Withdrawal Update Form 3File: Form 3 - RERA Vidyalankar.pdf | 27 Sep 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Vidyalankar- Dec 24.pdf | 3 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3-Vidyalankar-June 2024.pdf | 21 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5-Vidyalankar-Mar 2024.pdf | 20 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 jan to march 24.pdf | 5 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf | 3 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 (1).pdf | 3 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf | 3 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf | 3 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate 23 Q4 Vidyalankar.pdf | 16 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate Dec 23.pdf | 23 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate sept 23.pdf | 23 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Vidyalankar - Sept 23.pdf | 5 Dec 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Accounts 70.pdf | 31 Aug 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: PLINTH - STILT CC 01 08 2023 CORRECTED.pdf | 24 Aug 2023 |
| Proforma of Agreement for saleFile: 1 Proforma of Agreement for sale (6).pdf | 24 Aug 2023 |
| Deviation Report with respect to model copy of AgreementFile: Deviation Report agreement.pdf | 24 Aug 2023 |
| Copy of the legal title reportFile: Title Report-RERA.pdf | 23 Aug 2023 |
| Details of encumbrances concerned to FinanceFile: ENcumbrance to Finance_Vidyalankar.pdf | 23 Aug 2023 |
| Details of encumbrances concerned to FinanceFile: Encumbrance to Legal_Vidyalankar.pdf | 23 Aug 2023 |
| Details of encumbrances concerned to LegalFile: ENcumbrance to Finance_Vidyalankar.pdf | 23 Aug 2023 |
| Details of encumbrances concerned to LegalFile: Encumbrance to Legal_Vidyalankar.pdf | 23 Aug 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed CA Certificate (1).pdf | 2 Aug 2023 |
| Proforma of Allotment letterFile: 251 DRPL-Vidyalankar CHSL_ Allotment Letter DG 03-06-23.pdf | 26 Jun 2023 |
| Deviation Report with respect to Allotment letterFile: Deviation Report of Allotment.pdf | 26 Jun 2023 |
| CERSAI detailsFile: CERSAI DECLARATION.pdf | 6 Jun 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A DOI.pdf | 6 Jun 2023 |
| Building plan approvalFile: 2309199_IOD_signed.pdf | 12 May 2023 |
| Layout approvalFile: Drawing (1)_1-2.pdf | 12 May 2023 |
| Layout approvalFile: Drawing (1)_3-end.pdf | 12 May 2023 |
| PAN CardFile: PAN CARD OF Desai Residency DRPL.pdf | 12 May 2023 |
| Copy of Layout Approval (in case of layout)File: Drawing (1)_1-2.pdf | 12 May 2023 |
| Copy of Layout Approval (in case of layout)File: Drawing (1)_3-end.pdf | 12 May 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 2309199_IOD_signed.pdf | 12 May 2023 |
| Declaration about Commencement CertificateFile: Declaration about CC_VD.pdf | 12 May 2023 |
| Declaration in FORM BFile: Form B- PRomoter_VD.pdf | 12 May 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration, which the RERA portal never shows together
- All 54 filed documents as one ZIP, foldered, with a manifest
Keep Vidyalankar CHSL on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Vile parle East6,700+ in Mumbai Suburban
Vijayraj Residency
Vijayraj Realtors
ZEE HAPPY VEENA
ZEE LIFESPACES
Romell Espalier
ROMELL REAL ESTATE PRIVATE LIMITED
ZEE SHAAN
TRISUL DEVELOPERS
SALE BUILDING 1 - CHAMUNDA CROWN AND SALE BUIL
Chamunda Builders & Developers
ARKADE PEARL 1
ARKADE DEVELOPERS LIMITED
See every Mumbai Suburban project, with the district possession charts
Builder: DESAI RESIDENCY PRIVATE LIMITED
DESAI RESIDENCY PRIVATE LIMITED has 2 registrations on MahaRERA, including DESAI HARMONY and Vidyalankar CHSL. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if Vidyalankar CHSL is delayed beyond 31 Jul 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Vidyalankar CHSL?
The registered promoter entity is DESAI RESIDENCY PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Vidyalankar CHSL?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Vidyalankar CHSL?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Vidyalankar CHSL?
The professionals named in the filing: Architect: saumil jhaveri; Engineer: Mr. Aditya Mehta; Chartered Accountant: NEHALI & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Vidyalankar CHSL?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback