ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / Vibha

Completed No litigation declared Residential / Group Housing project

Vibha

By BKP Infraa

RG-MH-12120 · RERA P52100005970 · Last updated on MahaRERA portal: 13 Jan 2020

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 5 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2019Possession promisedregistration recorded completed
6 of 22Construction stages doneacross 2 buildings; furthest along: Internal walls, 95%
0Complaints at MahaRERAon this registration
Jump to the 28 documents Report an error

Vibha is a Residential / Group Housing project by BKP Infraa in Pune, Maharashtra, registered with MahaRERA as P52100005970 on 14 Aug 2017. The registration is recorded completed; possession was promised by 30 Jun 2019. The completion date has moved by 12 months from the original filing.

At a glance

Project

  • NameVibha
  • TypeResidential / Group Housing
  • Location
    • NARHE
    • Haveli
    • Pune
    • 411041
  • Pincode411041
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100005970
  • ReraGenie IDRG-MH-12120

Builder

  • NameBKP Infraa
  • Entity typePartnership
  • PartnerJaswandi Lalitkumar Kudale
  • Declared earlier projects5 →

Key dates

this monthRegisteredAug 2017First promiseJun 2018Revised toJun 2019Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on14 Aug 2017
  • Promised completion30 Jun 2019
  • Revised completionRevised to 30 Jun 2019 (originally 30 Jun 2018)
  • Buildings2 building records
  • Documents filed28 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
VibhaNA50000
Vibha IINA50000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 13 Jan 2020, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 95%.

Vibha84%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks85%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.75%
Vibha II0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 13 Jan 2020, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes90%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed26

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots26
Closed/Covered23
Open Space3

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,700 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI2038.28
Proposed, not sanctioned1,198 sq m
Buildings approved2
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchOffice no 1 bhargav House Manikbaugh Chawk SInhagad road Pune 4111051

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSunil Bhamre
EngineerGABhilare Consultants Pvt Ltd
PartnerRole in project
BKP Infraa-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100000455Jun 2018 → Jun 2019

Reason as filed by the promoter1) As per the sanction plan Dated 27/05/2016; we get the sanction and permission to construct the 28 number of tenements out of the total 32 tenements and accordingly we have commenced development of the said land. Whereas we have completed the constriction up-to 4th floor i.e. total 28 tenements and have applied for PART-COMPLETION with the PMRDA Authority. Accordingly PMRDA, Pune have issued Part Occupancy/ Completion Certificate with respect to 24 tenements up-to the 3rd floors on 25/04/2018 vide No. 117/16-17. (2) As the matter of facts out of the total 32 units/tenements we have completed

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 28 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 28 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 2 Oct 2019

Documents filed28

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Registration Certificate VIBHA.pdf13 Jan 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: VIBHA-Form-2- Engineer Certificate_compressed.pdf2 Oct 2019
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: VIBHA OC.pdf2 Oct 2019
OtherFile: VIBHA OC.pdf2 Oct 2019
Certificates of CA (Form 5)File: Audit Report BKP INFRAA CA Form No 5.pdf26 Dec 2018
Certificates of CA (Form 5)File: Audit Report-ilovepdf-compressed.pdf26 Dec 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: VIBHA Architect Certificate 30-06-18.pdf30 Jun 2018
OtherFile: VIBHA OC.pdf30 Jun 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate 2018-03-31 (1).pdf31 Mar 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eng Cert.pdf31 Mar 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arc cret vibha ii-min.pdf30 Oct 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: vibha ii eng-min.pdf30 Oct 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate_Vibha-ilovepdf-compressed.pdf30 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate_Final.pdf30 Jul 2017
Certificates of Architect (Form 4)File: Architect Certificate_Vibha-ilovepdf-compressed.pdf30 Jul 2017
Layout approvalFile: Layout VIBHA.pdf29 Jul 2017
Copy of the legal title reportFile: Final VIBHA TITLE JULY 2017.pdf29 Jul 2017
Details of encumbrancesFile: VIBHA Certificate of Encumbarancess.pdf29 Jul 2017
Copy of Layout Approval (in case of layout)File: Layout VIBHA.pdf29 Jul 2017
Declaration in FORM BFile: New Doc 2017-07-29 (1).pdf29 Jul 2017
Certificates of CA (Form 3)File: FORM-3 .pdf29 Jul 2017
Proforma of Allotment letterFile: FINAL VIBHA RERA FLA PURCHASE .pdf29 Jul 2017
OtherFile: NA Vibha.pdf29 Jul 2017
OtherFile: vibha 7 12.pdf29 Jul 2017
Building plan approvalFile: jpg2pdf.pdf28 Jul 2017
PAN CardFile: BKP Infraa (1).pdf28 Jul 2017
Building Plan Approval (IOD)File: jpg2pdf.pdf28 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: CCcompressed.pdf28 Jul 2017

Promoter's earlier projects5

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

5 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Abelone Wing BAmbegaon64CompletedMar 2016Jan 2016
Anuj ApartmentWadgaon6CompletedJun 2014May 2014
Bhargav HouseHingne6CompletedMar 2014Mar 2014
Aryan ApartmentWadgaon23CompletedDec 2009Oct 2009
Bhargav PalaceVadgaon72CompletedMar 2008Mar 2008

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 12 months
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Vibha on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NARHE13,700+ in Pune

2 kmVibhaCompleted 5Other 3Dot size: filed unitsN

Filed coordinates, straight-line distance. 8 registered projects within 2 km.

Builder: BKP Infraa

BKP Infraa has 1 registration on MahaRERA, including Vibha. Its filings disclose 5 earlier MahaRERA projects: declares 5 of 5 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Vibha is delayed beyond 30 Jun 2019?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Vibha?

The registered promoter entity is BKP Infraa, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Vibha?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Vibha?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Vibha?

The professionals named in the filing: Architect: Sunil Bhamre; Engineer: GABhilare Consultants Pvt Ltd. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Vibha?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Vibha. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Vibha to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.