Red flags
- Litigation declared, 3 cases
- 2 complaints at MahaRERA
Clear
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
VERVE ELINA is a Residential / Group Housing project by VERVE GREENS HOLDING AND REALTY PRIVATE LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800050378 on 5 Apr 2023. Possession is promised by 31 Dec 2026. 34 of the 68 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete. 2 complaints are on record with the regulator.
At a glance
Project
- NameVERVE ELINA
- TypeResidential / Group Housing
- Location
- AIYAPPA MANDIR ROAD
- I C COLONY
- BORIVALI WEST
- Eksar
- Borivali
- Mumbai Suburban
- 400103
- Pincode400103
- RERA no.P51800050378
- ReraGenie IDRG-MH-05310
Builder
- NameVERVE GREENS HOLDING AND REALTY PRIVATE LIMITED
- Entity typeCompany
- DirectorsVIJAY PRAVINCHANDRA THAKKAR, KARAN VIJAY THAKKAR
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on5 Apr 2023
- Promised completion31 Dec 2026
- Revised completionNone
- Buildings1 building record
- Documents filed141 files
Current status
Figures as on 6 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| VERVE ELINA | NA | 38 | 38 | 68 | 0 | 68 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 6 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
3 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 95%.
VERVE ELINA: 76% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 95% |
| Podiums (if any) | 95% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 83% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 80% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 60% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 80% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 45% |
Progress on shared amenities15
As on 6 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 90% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 60% |
| Storm Water Drains | Yes | 70% |
| Landscaping & Tree Planting | Yes | 65% |
| Street Lighting | Yes | 80% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 70% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed202
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| VERVE ELINA | NA | Rs 88.99 cr | Rs 91.70 cr |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | THE DESIGN STUDIO |
| Engineer | HITEN R MAHIMTURA OF MAHIMTURA CONSULTANTS PRIVATE LIMITED |
| Engineer | Atul Patel |
| Chartered Accountant | VISHAL H SHAH & ASSOCIATES |
| Chartered Accountant | NITIN POTA & ASSOCIATES |
| Partner | Role in project |
|---|---|
| VERVE GREENS HOLDING AND REALTY PRIVATE LIMITED | - |
Litigation declared3
| Case | Court | Status |
|---|---|---|
| 892/2022 | BOMBAY CITY CIVIL COURT | Ongoing |
| 1435/2022 | BOMBAY CITY CIVIL COURT | Ongoing |
| 892/2022 | Bombay City Civil Court | Ongoing |
Complaints filed with MahaRERA2
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12504492 | Crimson Interactive Pvt Ltd Shilpa Mittal | VERVE GREENS HOLDING AND REALTY PRIVATE LIMITED | 16/12/2025 |
| CC12504495 | Crimson Interactive Pvt Ltd Shilpa Mittal | VERVE GREENS HOLDING AND REALTY PRIVATE LIMITED | 16/12/2025 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 27 Mar 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 9 Aug 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 5 Feb 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 6 Jul 2026Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2026
Documents filed141
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 141 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Commencement certificateFile: cc Revalidation upto 010327.pdf | 6 Jul 2026 |
| Withdrawal Update Form 1File: 300626_Annexure-A_Form-1_Architects Certificate.pdf | 4 Jul 2026 |
| Withdrawal Update Form 2File: 300626_form2 Engg cert.pdf | 4 Jul 2026 |
| Withdrawal Update Form 3File: 300626_Annexure-D_Form-3_CA Certificate.pdf | 4 Jul 2026 |
| Form 2A (FY 2025-2026)File: 310325_2A engnr cert.pdf | 19 May 2026 |
| Form 5 (FY 2025-2026)File: 24-25_Form5_Auditor cert.pdf | 19 May 2026 |
| Withdrawal Update Form 1File: 310326_Annexure-A_Form-1_Architects Certificate.pdf | 27 Apr 2026 |
| Withdrawal Update Form 2File: 310326_form2 Engg cert.pdf | 27 Apr 2026 |
| Withdrawal Update Form 3File: 310326_Annexure-D_Form-3_CA Certificate.pdf | 27 Apr 2026 |
| Withdrawal Update Form 1File: 311225_Annexure-A_Form-1_Architects Certificate.pdf | 11 Feb 2026 |
| Withdrawal Update Form 1File: 311225_Annexure-A_Form-1_Architects Certificate.pdf | 11 Feb 2026 |
| Withdrawal Update Form 2File: 311225_form2 Engg cert.pdf | 11 Feb 2026 |
| Withdrawal Update Form 2File: 311225_form2 Engg cert.pdf | 11 Feb 2026 |
| Withdrawal Update Form 3File: 311225_Annexure-D_Form-3_CA Certificate.pdf | 11 Feb 2026 |
| Withdrawal Update Form 3File: 311225_Annexure-D_Form-3_CA Certificate.pdf | 11 Feb 2026 |
| Withdrawal Update Form 1File: 300925_Annexure-A_Form-1_Architects Certificate.pdf | 12 Nov 2025 |
| Withdrawal Update Form 2File: 300925_form2 Engg cert.pdf | 12 Nov 2025 |
| Withdrawal Update Form 3File: 300925_Annexure-D_Form-3_CA Certificate.pdf | 12 Nov 2025 |
| Form 1File: 300623_Architect cert_Form 1.pdf | 8 Aug 2025 |
| Form 2File: 300623_Engineer cert_Form 2.pdf | 8 Aug 2025 |
| Form 3File: 300623_CA cert_Form 3.pdf | 8 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: 300623_VGHRPL sold_booked inventory.pdf | 8 Aug 2025 |
| Form 1File: 300923_Architect cert_Form 1.pdf | 8 Aug 2025 |
| Form 2File: 300923_Engineer cert_Form 2.pdf | 8 Aug 2025 |
| Form 3File: 300923_CA cert_Form 3.pdf | 8 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: 300923_VGHRPL sold_booked inventory.pdf | 8 Aug 2025 |
| Form 1File: 311223_Architect cert_Form 1.pdf | 8 Aug 2025 |
| Form 2File: 311223_Engineer cert_Form 2.pdf | 8 Aug 2025 |
| Form 3File: 311223_CA cert_Form 3.pdf | 8 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: 311223_VGHRPL sold_booked inventory.pdf | 8 Aug 2025 |
| Form 1File: 310324_Architect cert_Form 1.pdf | 8 Aug 2025 |
| Form 2File: 310324_form2 Engg cert.pdf | 8 Aug 2025 |
| Form 3File: 310324_form3 CA cert.pdf | 8 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: 310324_VGHRPL sold_booked inventory.pdf | 8 Aug 2025 |
| Form 1File: 300624_Architect cert_Form 1.pdf | 8 Aug 2025 |
| Form 2File: 300624_form2 Engg cert.pdf | 8 Aug 2025 |
| Form 3File: 300624_form3 CA cert.pdf | 8 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: 300624_VGHRPL sold_booked inventory.pdf | 8 Aug 2025 |
| Form 1File: 300924_Architect cert_Form 1.pdf | 8 Aug 2025 |
| Form 2File: 300924_form2 Engg cert.pdf | 8 Aug 2025 |
| Form 3File: 300924_form3 CA cert.pdf | 8 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: 300924_VGHRPL sold_booked inventory.pdf | 8 Aug 2025 |
| Form 1File: 311224_Annexure-A_Form-1_Architects Certificate.pdf | 8 Aug 2025 |
| Form 2File: 311224_form2 Engg cert.pdf | 8 Aug 2025 |
| Form 3File: 311224_form3 CA cert.pdf | 8 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: 311224_VGHRPL sold_booked inventory.pdf | 8 Aug 2025 |
| Form 1File: 310325_Annexure-A_Form-1_Architects Certificate.pdf | 8 Aug 2025 |
| Form 2File: 310325_form2 Engg cert.pdf | 8 Aug 2025 |
| Form 3File: 310325_form3 CA cert.pdf | 8 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: 310325_VGHRPL sold_booked inventory.pdf | 8 Aug 2025 |
| Withdrawal Update Form 1File: 300625_Annexure-A_Form-1_Architects Certificate.pdf | 8 Aug 2025 |
| Withdrawal Update Form 2File: 300625_form2 Engg cert.pdf | 8 Aug 2025 |
| Withdrawal Update Form 3File: 300625_Annexure-D_Form-3_CA Certificate.pdf | 8 Aug 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 310325_Annexure-A_Form-1_Architects Certificate.pdf | 13 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 310325_form3 CA cert.pdf | 13 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 310325_form2 Engg cert.pdf | 13 May 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: CC revalidated upto 010326.pdf | 13 May 2025 |
| Disclosure of sold/ booked inventoryFile: 310325_VGHRPL sold_booked inventory.pdf | 13 May 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2024-25)File: 24-25_Form5_Auditor cert.pdf | 13 May 2025 |
| Building plan approvalFile: 031224_approved floor plans.pdf | 5 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 311224_Annexure-A_Form-1_Architects Certificate.pdf | 5 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 311224_form3 CA cert.pdf | 5 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 311224_form2 Engg cert.pdf | 5 Feb 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 031224_approved floor plans.pdf | 5 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: 311224_VGHRPL sold_booked inventory.pdf | 5 Feb 2025 |
| Building plan approvalFile: 031224 PODIUM_APPROVED DRAWING.pdf | 20 Dec 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: CC_33flrs_upto 010325.pdf | 20 Dec 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 031224 PODIUM_APPROVED DRAWING.pdf | 20 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 300924_form3 CA cert.pdf | 18 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 300924_Architect cert_Form 1.pdf | 18 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 300924_form2 Engg cert.pdf | 18 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: 300924_VGHRPL sold_booked inventory.pdf | 18 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 300924_Architect cert_Form 1.pdf | 18 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 300924_form3 CA cert.pdf | 18 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 300924_form2 Engg cert.pdf | 18 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: 300924_VGHRPL sold_booked inventory.pdf | 18 Nov 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: CC revalidated till 010325.pdf | 12 Aug 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 300624_Architect cert_Form 1.pdf | 12 Aug 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 300624_form2 Engg cert.pdf | 12 Aug 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 310324_2A engnr cert.pdf | 12 Aug 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- All 141 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep VERVE ELINA on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near BORIVALI WEST6,700+ in Mumbai Suburban
MAYFAIR AANGAN
MAYFAIR HOUSING PRIVATE LIMITED
THE CASTLE
SOLIDAGO REALTY
103 West
M/s. RELCON ZP JE CONSTRUCTION LLP
HAPPY HOME CHSL
SUMUKH INFRA
Romell Ariana
ROMELL REAL ESTATE PRIVATE LIMITED
Kamla Borivali Lucky
Kamla Homes and Lifestyles Private Limited
See every Mumbai Suburban project, with the district possession charts
Builder: VERVE GREENS HOLDING AND REALTY PRIVATE LIMITED
VERVE GREENS HOLDING AND REALTY PRIVATE LIMITED has 1 registration on MahaRERA, including VERVE ELINA. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if VERVE ELINA is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of VERVE ELINA?
The registered promoter entity is VERVE GREENS HOLDING AND REALTY PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in VERVE ELINA?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against VERVE ELINA?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for VERVE ELINA?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at VERVE ELINA?
The professionals named in the filing: Architect: THE DESIGN STUDIO; Engineer: HITEN R MAHIMTURA OF MAHIMTURA CONSULTANTS PRIVATE LIMITED; Engineer: Atul Patel; Chartered Accountant: VISHAL H SHAH & ASSOCIATES; Chartered Accountant: NITIN POTA & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in VERVE ELINA?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback