Home / Browse projects / Udupi, Karnataka / VENKATESHWARA RESIDENCY

Registration approved No litigation declared Residential/Group Housing project

VENKATESHWARA RESIDENCY

By VENUS DEVELOPERS

RG-KA-61028 · RERA PRM/KA/RERA/1273/318/PR/180524/006897 · Last updated on RERA Karnataka portal: 1 May 2026

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Dec 2027Possession promisedno revision filed
14 of 14Construction stages doneevery applicable stage filed complete
9 of 15Units unsoldnot recorded sold or booked
0Complaints at RERA Karnatakaon this registration
Jump to the 86 documents Report an error

VENKATESHWARA RESIDENCY is a Residential/Group Housing project by VENUS DEVELOPERS in Udupi, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1273/318/PR/180524/006897 on 18 May 2024. Possession is promised by 31 Dec 2027. 6 of the 15 units on this registration are recorded sold or booked, and 14 of 14 construction stages are filed complete.

At a glance

Project

  • NameVENKATESHWARA RESIDENCY
  • TypeResidential/Group Housing
  • Location
    • Udupi
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1273/318/PR/180524/006897
  • ReraGenie IDRG-KA-61028

Builder

  • NameVENUS DEVELOPERS
  • Entity typePartnership Firm
  • GSTIN29AAVFV5861F1ZD
  • Authorized SignatoryMOHANDAS RAMDAS BHAKTA

Key dates

this monthRegisteredMay 2024PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on18 May 2024
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed86 files

Current status

40%6 of 15 units booked
78.0%Of the estimated cost spent so far

Figures as on 1 May 2026, this project's latest RERA Karnataka filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
VENKATESHWARA RESIDENCY---15015

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 1 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

14 of 14 construction stages are filed complete.

Building: 100% average across the applicable activities

ActivityProgress
Earth work and other leveling preparation work100%
Foundation footing work100%
Upto Plinth Level100%
Sub-structure flooring (Parking Floor, more than one floor below general ground level)100%
Retaining wall (All types)Not applicable
RCC or MS Framed structure100%
Masonry Construction100%
Plastering inside , outside & Ceiling100%
Joinery: Doors, Windows, Ventilators etc100%
Basic work of Water supply, Sanitary and Electrification100%
Dadoing, Skirting, Flooring, Tiles work (All types)100%
Railing and Grill fixing100%
Electrification, Water supply and Sanitary Finishing100%
Painting100%
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)Not applicable
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work100%
Internal and External work including landscapes as per sanctioned drawingsNot applicable

Progress on shared amenities40

As on 1 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes100%
Sewage and Drainage SystemYes100%
Water conservation/rain water harvesting/recharge of ground waterYes100%
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Solid waste management and disposalNoNot applicable
Emergency Evacuation servicesNoNot applicable
Internal Roads & FootpathsNoNot applicable
Electricity supply transformer and substationYes100%
Storm water drainsNoNot applicable
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)NoNot applicable
Parks & Tree plantingNoNot applicable
Street LightingNoNot applicable
ElectricityYes100%
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes100%
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksNoNot applicable
Power BackupYes100%
Piped GasYes100%
Water and SanitationYes100%
Air ConditioningNoNot applicable
StaircasesYes100%
LiftsYes100%
Corridor/LobbiesYes100%
Fire escapesNoNot applicable
Common entrance and exit for the building/common portico/foyer/verandahYes100%
BasementYes100%
TerraceYes100%
Outer WallNoNot applicable
Open parking areasYes100%
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable
Common storage spacesNoNot applicable

Land and ownership1

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Named landowners1
LandownerVillageDistrict
K VISHNUMURTHY SHENOY--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 4.20 cr
Cost incurredRs 3.27 cr
Spent of the estimate77.97%
BuildingWingEstimatedIncurred
-NARs 4.20 crRs 2.80 cr
-NA-Rs 10.31 lakh
-NA-Rs 2.83 lakh

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSHALINI SURESH
EngineerGANESH BAILOOR
Chartered AccountantPRITESH BURTON D'SA

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed86

As listed on the registration, under the names the promoter filed them with; the newest 80 of 86 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1273/318/PR/180524/006897 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form 4 - Q4.pdf1 May 2026
Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Architect's Certificate.pdf1 May 2026
Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: engineer Q4.pdf1 May 2026
Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: form 4 CA.pdf28 Mar 2026
Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Architect Certificate.pdf28 Mar 2026
Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: engineer certifcate.pdf28 Mar 2026
VILLAGE MAPFile: village map.pdf17 May 2024
FORM 5File: Arc Form 5.pdf17 May 2024
FORM 6File: engineer form 6.pdf17 May 2024
CLARIFICATIONFile: clarifivcation.pdf17 May 2024
RTC, survey 6-9A5-
Mutation, survey 6-9A5-
Encumbrance Certificate, survey 6-9A5-
Conversion/Alienation Order, survey 6-9A5-
Sale/Title/Gift Deed, survey 6-9A5-
Khatha, survey 6-9A5-
Registration CertificateFile: firm registartion certiifcate.pdf-
Partnership DeedFile: partnership deed.pdf-
Partner Details-
Partner Details-
Partner Details-
Partner Details-
Partner Details-
Certificate issued by CA Form 1File: Revised Form 1.pdf-
Certificate issued by Architect Form 2File: Arc Form 2.pdf-
Certificate issued by Engineer Form 3File: engineer certificate from 3.pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: litigation affidavit.pdf-
Certificate from Chartered AccountFile: Revised Form 1.pdf-
Balance Sheet 2022 - 2023File: BS 2023.pdf-
Audited Profit and Loss Statement 2022 - 2023File: PL 2023.pdf-
building licence-
approved sanction plan-
single layout-
approved sanction plan-
approved plan-
approved sanction plan-
specification-
single layout-
single layout-
Stability certiifcate-
search report-
Title deed-
Convertion license-
Convertion license-
Sale deed-
proforma AOS-
proforma allotment letter-
Broucher-
form b-
affidavit 3(1)-
mescom noc -
water noc application-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
danapatra-
village map-
Deed of partnership 2022-
form D-
affidavit for sold unsold unit-
stp-
land calculation sheet-
sharing agreement-
water noc affidavit-
estimation cost by engineer-

How this compares with Udupi

40%of this project is bookeddistrict median 0%
22%of Udupi projects moved their completion datethis one has not
0%of Udupi registrations have lapsed or been cancelledthis one is on the register

Computed across the 260+ Udupi projects on ReraGenie, from their own filings.

Keep VENKATESHWARA RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Udupi260+ in Udupi

Builder: VENUS DEVELOPERS

VENUS DEVELOPERS has 1 registration on RERA Karnataka, including VENKATESHWARA RESIDENCY. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Udupi district page.

Frequently asked questions

What are my rights if VENKATESHWARA RESIDENCY is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of VENKATESHWARA RESIDENCY?

The registered promoter entity is VENUS DEVELOPERS, a partnership firm as per the filing. Its GSTIN 29AAVFV5861F1ZD can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in VENKATESHWARA RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at VENKATESHWARA RESIDENCY?

The professionals named in the filing: Architect: SHALINI SURESH; Engineer: GANESH BAILOOR; Chartered Accountant: PRITESH BURTON D'SA. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VENKATESHWARA RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VENKATESHWARA RESIDENCY. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VENKATESHWARA RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.