VENKATESH SKYLIFE
RG-MH-32728 · RERA P52100080415 · Last updated on MahaRERA portal: 14 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 5 complaints at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- All 4 earlier projects delivered on promise
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
VENKATESH SKYLIFE is a Others project by SHREE VENKATESH SPACES in Pune, Maharashtra, registered with MahaRERA as P52100080415 on 2 Jun 2025. Possession is promised by 31 Mar 2029. 4 of the 61 units on this registration are recorded sold or booked, and 1 of 11 construction stages are filed complete. 5 complaints are on record with the regulator.
At a glance
Project
- NameVENKATESH SKYLIFE
- TypeOthers
- Location
- SINHAGAD ROAD
- VADGAON KHURD
- Pune (M Corp.)
- Pune City
- Pune
- 411041
- Pincode411041
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100080415
- ReraGenie IDRG-MH-32728
Builder
- NameSHREE VENKATESH SPACES
- Entity typePartnership
- Declared earlier projects4 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on2 Jun 2025
- Promised completion31 Mar 2029
- Revised completionNone
- Buildings1 building record
- Documents filed102 files
Current status
Figures as on 14 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| VENKATESH SKYLIFE | NA | 11 | 9 | 55 | 6 | 61 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 14 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
1 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 95%.
VENKATESH SKYLIFE: 18% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 95% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 14 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed398
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| SANJAY DNYANOBA DHAWADE | Pune (M Corp.) | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| VENKATESH SKYLIFE | NA | Rs 42.94 cr | Rs 2.51 cr |
| - | NA | Rs 3.29 cr | - |
Certifying professionals and partners7
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | AVINASH NAWATHE |
| Architect | ANA CONSORTIUM PVT LTD |
| Engineer | MAHENDRA RAMPURE |
| Engineer | NIKHIL MILIND GHOLAP |
| Chartered Accountant | CA SUNILKUMAR WADHWANI |
| Chartered Accountant | SUNILKUMAR WADHWANI |
| Chartered Accountant | Avinash Jeevan Utgikar |
| Partner | Role in project |
|---|---|
| SHREE VENKATESH SPACES | - |
Complaints filed with MahaRERA5
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| SM12600131 | Ram Gawali | SHREE VENKATESH SPACES | 09/02/2026 |
| SM12600247 | Ram Gawali | SHREE VENKATESH SPACES | 06/04/2026 |
| SM12600302 | Ram Gawali | SHREE VENKATESH SPACES | 07/05/2026 |
| SM12600307 | Ram Gawali | SHREE VENKATESH SPACES | 07/05/2026 |
| SM12600369 | Ram Gawali | SHREE VENKATESH SPACES | 26/05/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 26 Apr 2025 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 22 Dec 2025 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 22 Dec 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 4 Dec 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Mar 2029
Documents filed102
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 102 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: ARCH CERTIFICATE-SKYLIFE-JUN-26.pdf | 14 Jul 2026 |
| Withdrawal Update Form 2File: ENGG CERTIFICATE-SKYLIFE-JUN-26.pdf | 14 Jul 2026 |
| Withdrawal Update Form 3File: CA CERTIFICATE - SKYLIFE-JUN-2026.pdf | 14 Jul 2026 |
| Form 5 (FY 2025-2026)File: FORM 5 - SKYLIFE - MAR-2026.pdf | 16 May 2026 |
| Form 2A (FY 2025-2026)File: FORM 2A-SKYLIFE-MAR-2026.pdf | 12 May 2026 |
| Withdrawal Update Form 1File: ARCH CERTIFICATE -SKYLIFE-MAR-2026.pdf | 24 Apr 2026 |
| Withdrawal Update Form 1File: ARCH CERTIFICATE SKYLIFE - 16-12-2025.pdf | 24 Apr 2026 |
| Withdrawal Update Form 1File: ARCH CERTIFICATE SKYLIFE - 16-12-2025.pdf | 24 Apr 2026 |
| Withdrawal Update Form 1File: ARCH CERTIFICATE -SKYLIFE-MAR-2026.pdf | 24 Apr 2026 |
| Withdrawal Update Form 2File: ENGG CERTIFICATE -SKYLIFE-MAR-2026.pdf | 24 Apr 2026 |
| Withdrawal Update Form 2File: ENGG CERTIFICATE SKYLIFE - 16-12-2025.pdf | 24 Apr 2026 |
| Withdrawal Update Form 2File: ENGG CERTIFICATE SKYLIFE - 16-12-2025.pdf | 24 Apr 2026 |
| Withdrawal Update Form 2File: ENGG CERTIFICATE -SKYLIFE-MAR-2026.pdf | 24 Apr 2026 |
| Withdrawal Update Form 3File: CA CERTIFICATE- SKYLIFE-MAR-2026.pdf | 24 Apr 2026 |
| Withdrawal Update Form 3File: CA CERTIFICATE SKYLIFE DEC-25.pdf | 24 Apr 2026 |
| Withdrawal Update Form 3File: CA CERTIFICATE SKYLIFE DEC-25.pdf | 24 Apr 2026 |
| Withdrawal Update Form 3File: CA CERTIFICATE- SKYLIFE-MAR-2026.pdf | 24 Apr 2026 |
| Layout approvalFile: 1-15 LAYOUT.pdf | 22 Dec 2025 |
| Building plan approvalFile: 2-15-2ND BASEMENT.pdf | 22 Dec 2025 |
| Building plan approvalFile: 3-15-1ST BASEMENT.pdf | 22 Dec 2025 |
| Building plan approvalFile: 4-15-GROUND FLOOR.pdf | 22 Dec 2025 |
| Building plan approvalFile: 5-15-1ST FLOOR.pdf | 22 Dec 2025 |
| Building plan approvalFile: 6-15-1ST PODIUM PARKING.pdf | 22 Dec 2025 |
| Building plan approvalFile: 7-15-2ND PODIUM PARKING.pdf | 22 Dec 2025 |
| Building plan approvalFile: 8-15-AMENITY FLOOR.pdf | 22 Dec 2025 |
| Building plan approvalFile: 9-15-2ND-3RD-5TH-6TH AND 7TH FLOOR.pdf | 22 Dec 2025 |
| Building plan approvalFile: 10-15-4TH FLOOR.pdf | 22 Dec 2025 |
| Building plan approvalFile: 11-15-EIGHT FLOOR.pdf | 22 Dec 2025 |
| Building plan approvalFile: 12-15-ELEVATION.pdf | 22 Dec 2025 |
| Building plan approvalFile: 13-15-SECTION.pdf | 22 Dec 2025 |
| Building plan approvalFile: 14-15-SECTION.pdf | 22 Dec 2025 |
| Building plan approvalFile: 15-15-SECTION.pdf | 22 Dec 2025 |
| Declaration and undertaking (Annexure A)File: ANNEXURE A- DECLARATION-CUM-UNDERTAKING-LAND -ORDER 50.pdf | 22 Dec 2025 |
| Layout approvalFile: 1-15 LAYOUT.pdf | 4 Dec 2025 |
| Building plan approvalFile: 2-15-2ND BASEMENT.pdf | 4 Dec 2025 |
| Building plan approvalFile: 3-15-1ST BASEMENT.pdf | 4 Dec 2025 |
| Building plan approvalFile: 4-15-GROUND FLOOR.pdf | 4 Dec 2025 |
| Building plan approvalFile: 5-15-1ST FLOOR.pdf | 4 Dec 2025 |
| Building plan approvalFile: 6-15-1ST PODIUM PARKING.pdf | 4 Dec 2025 |
| Building plan approvalFile: 7-15-2ND PODIUM PARKING.pdf | 4 Dec 2025 |
| Building plan approvalFile: 8-15-AMENITY FLOOR.pdf | 4 Dec 2025 |
| Building plan approvalFile: 9-15-2ND-3RD-5TH-6TH AND 7TH FLOOR.pdf | 4 Dec 2025 |
| Building plan approvalFile: 10-15-4TH FLOOR.pdf | 4 Dec 2025 |
| Building plan approvalFile: 11-15-EIGHT FLOOR.pdf | 4 Dec 2025 |
| Building plan approvalFile: 12-15-ELEVATION.pdf | 4 Dec 2025 |
| Building plan approvalFile: 13-15-SECTION.pdf | 4 Dec 2025 |
| Building plan approvalFile: 14-15-SECTION.pdf | 4 Dec 2025 |
| Building plan approvalFile: 15-15-SECTION.pdf | 4 Dec 2025 |
| Building plan approval or NA orderFile: COMMENCEMENT CERTIFICATE -CC-NO-3027-2025-3-11-2025.pdf | 4 Dec 2025 |
| Withdrawal Update Form 1File: ARCH CERTIFICATE SKYLIFE-SEPT-25.pdf | 17 Oct 2025 |
| Withdrawal Update Form 2File: ENGG CERTIFICATE SKYLIFE-SEPT-25.pdf | 17 Oct 2025 |
| Withdrawal Update Form 3File: CA CERTIFICATE SKYLIFE SEPT-25.pdf | 17 Oct 2025 |
| Withdrawal Update Form 1File: ARCH CERTIFICATE SKYLIFE -JUN-25.pdf | 4 Aug 2025 |
| Withdrawal Update Form 2File: ENGG CERTIFICATE SKYLIFE -JUN-25.pdf | 4 Aug 2025 |
| Withdrawal Update Form 3File: CA CERTIFICATE VENKATESH SKYLIFE-JUN-25.pdf | 4 Aug 2025 |
| Details of encumbrances concerned to FinanceFile: EUNCUMBRANCE TO FINANCE AND LEGAL.pdf | 29 Apr 2025 |
| CERSAI detailsFile: CERSAI UNDERTAKING BY PROMOTER.pdf | 29 Apr 2025 |
| Details of encumbrances concerned to LegalFile: EUNCUMBRANCE TO FINANCE AND LEGAL.pdf | 29 Apr 2025 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: lo bank decl.pdf | 28 Apr 2025 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: Format A- Seprate Bank Account - BY PROMOTER.pdf | 28 Apr 2025 |
| Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Bank Format B - Bank Declaration on Bank branch letterhead.pdf | 28 Apr 2025 |
| Layout approvalFile: 3-10_compressed.pdf | 26 Apr 2025 |
| Building plan approvalFile: 4-10 - 2ND-3RD AND 4TH FLOOR_compressed.pdf | 26 Apr 2025 |
| Building plan approvalFile: 5-10 - 1ST AND 2ND BASEMENT_compressed.pdf | 26 Apr 2025 |
| Building plan approvalFile: 6-10 - GROUND AND 1ST FLOOR_compressed.pdf | 26 Apr 2025 |
| Building plan approvalFile: 7-10 - 5TH AND TERRACE FLOOR_compressed.pdf | 26 Apr 2025 |
| Building plan approvalFile: 8-10 - 1ST AND 2ND PODIUM PARKING_compressed.pdf | 26 Apr 2025 |
| Building plan approvalFile: 9-10 - SECTION PLAN_compressed.pdf | 26 Apr 2025 |
| Building plan approvalFile: 10-10 - AMENITY FLOOR AND SECTION_compressed.pdf | 26 Apr 2025 |
| Copy of the legal title reportFile: SEARCH AND TITLE CERTIFICATE-SKYLIFE.pdf | 26 Apr 2025 |
| Copy of the legal title reportFile: TITLE CERTIFICATE - SKYLIFE.pdf | 26 Apr 2025 |
| Copy of Layout Approval (in case of layout)File: 3-10_compressed.pdf | 26 Apr 2025 |
| Proforma of Allotment letterFile: Allotment Letter - Proforma.pdf | 26 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH CERTIFICATE SKLYLIFE.pdf | 26 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE SKYLIFE.pdf | 26 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 4-10 - 2ND-3RD AND 4TH FLOOR_compressed.pdf | 26 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 10-10 - AMENITY FLOOR AND SECTION_compressed.pdf | 26 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 9-10 - SECTION PLAN_compressed.pdf | 26 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 8-10 - 1ST AND 2ND PODIUM PARKING_compressed.pdf | 26 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 7-10 - 5TH AND TERRACE FLOOR_compressed.pdf | 26 Apr 2025 |
Promoter's earlier projects4
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| VENKATESH SKYDALE PH 3 | SURVEY NO 20 BY 1 PLOT H SINHAGAD ROAD HINGANE KHURD PUNE 411051 | 138 | Completed | Jun 2026 | Oct 2024 |
| VENKATESH SKYDALE PH 2 | SURVEY NO 20 BY 1 PLOT H SINHAGAD ROAD HINGANE KHURD PUNE 411051 | 132 | Completed | Dec 2025 | Mar 2024 |
| VENKATESH GRAFFITI ELAN PHASE 2 | MUNDHWA MANJARI ROAD KESHAVNAGAR MUNDHWA PUNE 411036 | 124 | Completed | Jun 2024 | Jun 2023 |
| VENKATESH SKYDALE PH 1 | SURVEY NO 20 BY 1 PLOT H SINHAGAD ROAD HINGANE KHURD PUNE 411051 | 105 | Completed | Mar 2024 | Mar 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 102 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep VENKATESH SKYLIFE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near VADGAON KHURD13,700+ in Pune
Filed coordinates, straight-line distance. 132 registered projects within 2 km.
VYANA PHASE-I -T5, T6, T7
KOLTE-PATIL DEVELOPERS LIMITED
Pratham Vihar Phase I
LJR Constructions LLP
VYANA PHASE-I-T2,T3 AT THE RESERVE
KOLTE-PATIL DEVELOPERS LIMITED
MAITREE MEGA CITY
MAITREE INFRA
RAMANA MYRA
SAI AND SHANTISHOBHA VENTURE
Apple Regency
Sri Sidhievinayak associetes
Builder: SHREE VENKATESH SPACES
SHREE VENKATESH SPACES has 1 registration on MahaRERA, including VENKATESH SKYLIFE. Its filings disclose 4 earlier MahaRERA projects: declares 4 of 4 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if VENKATESH SKYLIFE is delayed beyond 31 Mar 2029?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of VENKATESH SKYLIFE?
The registered promoter entity is SHREE VENKATESH SPACES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in VENKATESH SKYLIFE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against VENKATESH SKYLIFE?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for VENKATESH SKYLIFE?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at VENKATESH SKYLIFE?
The professionals named in the filing: Architect: AVINASH NAWATHE; Architect: ANA CONSORTIUM PVT LTD; Engineer: MAHENDRA RAMPURE; Engineer: NIKHIL MILIND GHOLAP; Chartered Accountant: CA SUNILKUMAR WADHWANI; Chartered Accountant: SUNILKUMAR WADHWANI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in VENKATESH SKYLIFE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback