Venkatesh Apartment

By Supreme Builders and Developers

RG-MH-06605 · RERA P52900053532 · Last updated on MahaRERA portal: 6 Apr 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 10 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Sindhudurg registration emailed to you, free during the pilot beta.
Dec 2025Possession promised10 months past this date
9 of 11Construction stages donefurthest along: Podiums (if any), 0%
16 of 38Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 60 documents Report an error

Venkatesh Apartment is a Others project by Supreme Builders and Developers in Sindhudurg, Maharashtra, registered with MahaRERA as P52900053532 on 10 Nov 2023. Possession was promised by 31 Dec 2025 and is now 10 months past that date. 22 of the 38 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete.

At a glance

Project

  • NameVenkatesh Apartment
  • TypeOthers
  • Location
    • Malvan
    • Malwan (M Cl)
    • Malwan
    • Sindhudurg
    • 416606
  • Pincode416606
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52900053532
  • ReraGenie IDRG-MH-06605

Builder

  • NameSupreme Builders and Developers
  • Entity typePartnership
  • PartnersMahesh Manohar Andhari, Apurva Mahesh Andhari, Nita Nilesh Andhari
  • Other registrations1 more →
  • Completed1 of 2
  • No longer live1 lapsed, de-registered or revoked

Key dates

10 months past promisethis monthRegisteredNov 2023PromisedDec 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on10 Nov 2023
  • Promised completion31 Dec 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed60 files

Current status

58%22 of 38 units booked

Figures as on 6 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Venkatesh ApartmentNA55281038

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 6 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

Venkatesh Apartment: 82% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 6 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed38

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots38
Closed/Covered27
Open Space11

Land and ownership20

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area790 sq m
Land owned byThe promoter, with other names on the file
Named landowners20
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on7 Jul 2025
LandownerVillageDistrict
Shruti Paresh KulkarniKandivaliMumbai Suburban
Tanvi Ravindra PednekarKanjurmargMumbai Suburban
Madhuri Nitin PatwardhanMulundMumbai Suburban
Sangeeta Nilesh AdurkarMulundMumbai Suburban
Sunil Subhash OtawanekarMumbai CityMumbai City
Aarti Ajit OtawanekarGoregaonMumbai Suburban
Amol Ajit OtawanekarGoregaonMumbai Suburban
Rohini Sachin KulkarniMumbai CityMumbai City
Sacchidanand Subhash OtavanekarMumbai CityMumbai City
Meena Milind HalepatyMumbai CityMumbai City
Kalpana Sanjay PowaleThane (M Corp.)Thane
Sadanand Vasantrao OtavanekarMumbai CityMumbai City
Sujata Satish OtavanekarMumbai CityMumbai City
Sheetal Satish OtavanekarMumbai CityMumbai City
Shilpa Satish OtavanekarMumbai CityMumbai City
Pratibha Prakash OtavanekarKandivaliMumbai Suburban
Sandhya Vinay KshirsagarBorivaliMumbai Suburban
Priyanka Prashant OtavanekarKandivaliMumbai Suburban
Purva Prashant OtavanekarKandivaliMumbai Suburban
Sunanda Subhash OtawanekarNavi Mumbai (M Corp.)Thane

Approvals and building plan

Sanctioning authorityMalvan Municipal Council
Permissible FSI2027.79
Proposed, not sanctioned1,678 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMadhu Sindhu, Taluka - Malvan, District - Sindhudurg PIN - 416606

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
Chartered AccountantSagar Gajanan Teli
PartnerRole in project
Supreme Builders and Developers-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 2 Nov 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 16 Oct 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 Aug 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 26 Aug 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed60

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Architects Certificate.pdf6 Apr 2026
Withdrawal Update Form 2File: ANDHARI - RERA - ENGINEER-28-0-23.pdf6 Apr 2026
Withdrawal Update Form 3File: Combined Forms.pdf6 Apr 2026
Withdrawal Update Form 1File: Architects Certificate.pdf25 Mar 2026
Withdrawal Update Form 2File: ANDHARI - RERA - ENGINEER-28-0-23.pdf25 Mar 2026
Withdrawal Update Form 3File: Form 3 CA Certificate Sep 25.pdf25 Mar 2026
Form 1File: 01 Architects Certificate Supreme Q1 25-26.pdf7 Aug 2025
Form 2File: 02 Engineer Certificate Supreme Q1 25-26.pdf7 Aug 2025
Form 3File: 03 CA Certificate Supreme Q1 25-26.pdf7 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Inventory Supreme June 25.pdf7 Aug 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate Venkatesh Apartment.pdf6 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate March 2025.pdf6 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate Venkatesh Apartment.pdf23 Apr 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory Supreme.pdf18 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Certificate Supreme Builders1.pdf12 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 04 CA Certificate Sep 2024.pdf8 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 05 CA Certificate Dec 2024.pdf8 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 03 CA Certificate June 2024.pdf8 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 02 CA Certificate Mar 2024.pdf8 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 01 CA Certificate Dec 2023.pdf8 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 02 Architect Certificate 31Mar2024.pdf7 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 03 Architect Certificate 30Jun2024.pdf7 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 04 Architect Certificate 30Sep2024.pdf7 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 05 Engineer Certificate 31Dec2024.pdf7 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 01 Architect Certificate 31Dec2023.pdf7 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 01 Engineer Certificate 31Dec2023.pdf7 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 02 Engineer Certificate 31Mar2024.pdf7 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 03 Engineer Certificate 30Jun2024.pdf7 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 04 Engineer Certificate 30Sep2024.pdf7 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 05 Engineer Certificate 31Dec2024.pdf7 Mar 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory Supreme .pdf7 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Quality Assurance Certificate 31Mar2024.pdf7 Mar 2025
Other - LegalFile: 1-40 (2MB).pdf7 Nov 2023
Other - LegalFile: 41-80 (2MB).pdf7 Nov 2023
Other - LegalFile: 81-120 (2MB).pdf7 Nov 2023
Other - LegalFile: 121-160 (2MB).pdf7 Nov 2023
Other - LegalFile: 161-190 (2MB).pdf7 Nov 2023
Copy of the legal title reportFile: VENKATESH APARTMENT 3010.pdf2 Nov 2023
Layout approvalFile: Plan.pdf16 Oct 2023
Copy of Layout Approval (in case of layout)File: Plan.pdf16 Oct 2023
Other - LegalFile: Reconciliation of Landowner And Title Report.pdf4 Oct 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest Revised.pdf11 Sep 2023
Proforma of Agreement for saleFile: Agreement Supreme Final.pdf11 Sep 2023
Proforma of Allotment letterFile: 06 Allotment Letter Supreme.pdf11 Sep 2023
Deviation Report with respect to Allotment letterFile: Final Deviation Report - Allotment Letter.pdf11 Sep 2023
Deviation Report with respect to model copy of AgreementFile: Final Deviation Report - Agreement.pdf11 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ANDHARI - RERA - ENGINEER-28-0-23.pdf1 Sep 2023
CERSAI detailsFile: CERSAI Declaration Final.pdf1 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Supreme.pdf1 Sep 2023
Other - TechnicalFile: Built-up Area Availment Letter.pdf1 Sep 2023
Building plan approvalFile: NA Order.pdf26 Aug 2023
PAN CardFile: Pan Card Supreme Developers.pdf26 Aug 2023
Details of encumbrances concerned to FinanceFile: 02 No Encumbrance.pdf26 Aug 2023
Details of encumbrances concerned to LegalFile: 02 No Encumbrance.pdf26 Aug 2023
Building Plan Approval / NA Order for plotted developmentFile: NA Order.pdf26 Aug 2023
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf26 Aug 2023
Declaration about Commencement CertificateFile: 03 Declaration about Commencement Certificate.pdf26 Aug 2023
Declaration in FORM BFile: Form B Mahesh Andhari Promoter.pdf26 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate.pdf26 Aug 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 07 Format A Bank Account Declaration.pdf26 Aug 2023

How this compares with Sindhudurg

58%of this project is bookeddistrict median 15%
21%of Sindhudurg projects moved their completion datethis one has not
30%of Sindhudurg registrations have lapsed or been cancelledthis one is among them

Computed across the 530+ Sindhudurg projects on ReraGenie, from their own filings.

Keep Venkatesh Apartment on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Malvan530+ in Sindhudurg

2 kmVenkatesh ApartmentCompleted 8Lapsed / revoked 3Other 7Dot size: filed unitsN

Filed coordinates, straight-line distance. 18 registered projects within 2 km.

Builder: Supreme Builders and Developers

Supreme Builders and Developers has 2 registrations on MahaRERA, including SUPREME HERITAGE and Venkatesh Apartment. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Sindhudurg district page.

Frequently asked questions

What does it mean that Venkatesh Apartment shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Venkatesh Apartment is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Venkatesh Apartment?

The registered promoter entity is Supreme Builders and Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Venkatesh Apartment?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Venkatesh Apartment?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Venkatesh Apartment?

The professionals named in the filing: Chartered Accountant: Sagar Gajanan Teli. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Venkatesh Apartment?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Venkatesh Apartment. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Venkatesh Apartment to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.