VELVET VILLAS PHASE 1

By ASHDAN DEVELOPERS PRIVATE LIMITED

RG-MH-22662 · RERA P52100031829 · Last updated on MahaRERA portal: 18 Jul 2026

Source: official MahaRERA filing

Red flags

  • 2 complaints at MahaRERA
  • Completion date moved by 12 months
  • 1 extension taken
  • Rs 410.00 crore secured on the land, in favour of TATA CAPITAL HOUSING FINANCE LIMITED

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 12 months from the original
88 of 341Construction stages doneacross 31 buildings; furthest along: Internal walls, 90%
12 of 31Units unsoldnot recorded sold or booked
2Complaints at MahaRERAon this registration
Jump to the 110 documents Report an error

VELVET VILLAS PHASE 1 is a Residential / Group Housing project by ASHDAN DEVELOPERS PRIVATE LIMITED in Pune, Maharashtra, registered with MahaRERA as P52100031829 on 12 Nov 2021. Possession is promised by 31 Dec 2026. The completion date has moved by 12 months from the original filing. 19 of the 31 units on this registration are recorded sold or booked, and 88 of 341 construction stages are filed complete. 2 complaints are on record with the regulator.

At a glance

Project

  • NameVELVET VILLAS PHASE 1
  • TypeResidential / Group Housing
  • Location
    • AWHALWADI ROAD
    • MANJARI KH
    • Haveli
    • Pune
    • 412307
  • Pincode412307
  • RERA no.P52100031829
  • ReraGenie IDRG-MH-22662

Builder

  • NameASHDAN DEVELOPERS PRIVATE LIMITED
  • Entity typeCompany
  • DirectorsMEENA KARNE, Bhushan Vilas Kumar Palresha, Nilesh Vilas Kumar Palresha, Anil Shantilal Kankaria
  • Other registrations15 more →
  • Completed4 of 16
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredNov 2021First promiseDec 2025Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on12 Nov 2021
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 31 Dec 2025)
  • Buildings31 building records
  • Documents filed110 files

Current status

61%19 of 31 units booked
42.4%Work done, per cost certificate

Figures as on 18 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
TYPE- V2NA22101
TYPE- V2NA22101
TYPE V2NA22101
TYPE- V2NA22101
TYPE V2NA22101
TYPE V2NA22101
TYPE V2NA22101
TYPE V2NA22101
TYPE V2NA22101
TYPE V2NA22101
TYPE V2NA22101
TYPE V2NA22101
TYPE V2NA22101
TYPE V1NA22101
TYPE V1NA22101
TYPE V1NA22101
TYPE V1NA22101
TYPE V1NA22101
TYPE V1NA22101
TYPE V1NA22101
TYPE V1NA22101
TYPE V1NA22101
TYPE B1NA22101
TYPE B1NA22101
TYP1 B1NA22101
TYPE B1NA22101
TYPE B1NA22101
TYPE B1NA22101
TYPE B1NA22101
TYPE B1NA22101
TYPE B1NA22101

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building20

As on 18 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection. The count above covers all 31 buildings; the table lists the first 20.

88 of 341 construction stages are filed complete across 31 buildings. The stage furthest along is Internal walls, at 90%.

TYPE- V228%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises10%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
TYPE- V227%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
TYPE V227%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
TYPE- V227%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
TYPE V235%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
TYPE V236%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
TYPE V227%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
TYPE V227%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
TYPE V227%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
TYPE V236%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
TYPE V236%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
TYPE V227%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
TYPE V236%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
TYPE V135%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
TYPE V122%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure40%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
TYPE V122%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure40%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
TYPE V135%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
TYPE V135%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
TYPE V116%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth80%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
TYPE V128%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises10%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 18 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes60%
Water SupplyYes60%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes50%
Storm Water DrainsYes60%
Landscaping & Tree PlantingYes0%
Street LightingYes25%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes80%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntYes0%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed58

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots58
Open Space58
BuildingOpen SpaceTotal
TYPE- V222
TYPE- V222
TYPE V222
TYPE- V222
TYPE V222
TYPE V222
TYPE V222
TYPE V222
TYPE V222
TYPE V222
TYPE V222
TYPE V222
TYPE V122
TYPE V122
TYPE V122
TYPE V122
TYPE V122
TYPE V122
TYPE V122
TYPE V122
TYPE V122
TYPE B122
TYPE B122
TYP1 B122
TYPE B122
TYPE B122
TYPE B122
TYPE B122
TYPE B122

Land and ownership1

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area9,591 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared present
Charge in favour ofTATA CAPITAL HOUSING FINANCE LIMITED
Secured amountRs 410.00 crore
CERSAI search filedYes
Declared on13 Aug 2026
LandownerVillageDistrict
ARHUM ERECTORS PRIVATE LIMITED-Pune

Approvals and building plan

Sanctioning authorityPune Metropolitan Regional Development Authority, Pune (PMRDA)
Permissible FSI8762.72
Proposed, not sanctioned7,763 sq m
Buildings approved31
Buildings sanctioned31

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchVIMAN NAGAR, PUNE
Estimated costRs 40.41 cr
Cost incurredRs 17.12 cr
Work done42.37%
BuildingWingEstimatedIncurred
-NARs 2.29 crRs 2.26 cr
TYPE V2NARs 2.07 crRs 80.62 lakh
TYPE V2NARs 1.75 crRs 68.13 lakh
TYPE V2NARs 1.75 crRs 68.13 lakh
TYPE V2NARs 1.75 crRs 68.13 lakh
TYPE V2NARs 1.72 crRs 66.69 lakh
TYPE V1NARs 1.72 crRs 66.99 lakh
TYPE V1NARs 1.72 crRs 66.99 lakh
TYPE V1NARs 1.69 crRs 65.86 lakh
TYPE B1NARs 1.67 crRs 65.29 lakh
TYPE- V2NARs 1.46 crRs 56.78 lakh
TYPE- V2NARs 1.43 crRs 55.64 lakh

Certifying professionals and partners14

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVk arch
ArchitectANA CONSORTIUM PVT LTD.
ArchitectANA CONSORTIUM PVT LTD
ArchitectVK:a
EngineerPravin Bhosale
EngineerGirish Awinashe
EngineerSTRUDCOM CONSULTANT PRIVATE LIMITED
EngineerMR PRAVIN BHOSALE
Chartered AccountantSAC & cO LLP
Chartered AccountantSUNIL SHAHA
Chartered AccountantBogati & Company
Chartered AccountantSPAK & CO.
PartnerRole in project
ASHDAN DEVELOPERS PRIVATE LIMITED-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA26122519027Dec 2025 → Dec 2026

Reason as filed by the promoterAs per order of the Hon'ble Chairman (MahaRERA) Dated 23/01/2026. we request you kindly to grant us extension till 31/12/2026.

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC12603483ASHDAN DEVELOPERS PRIVATE LIMITEDHAMEED AMEER SAYYAD06/06/2026
CC12604637ASHDAN DEVELOPERS PRIVATE LIMITEDADITYA TRIPATHI24/07/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 3 Nov 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 3 Nov 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 3 Nov 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 3 Nov 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed110

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 110 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1 VV Phase 1 07072026.pdf18 Jul 2026
Withdrawal Update Form 2File: FORM 2 VV Phase 1 30062026.pdf18 Jul 2026
Withdrawal Update Form 3File: FORM 3 VV PH 1 30062026.pdf18 Jul 2026
Form 2A (FY 2025-2026)File: VV - Phase 1.pdf18 Jun 2026
Withdrawal Update Form 1File: FORM 1 VV Ph 1 07042026.pdf20 Apr 2026
Withdrawal Update Form 2File: Form 2 vv ph 1 30032026.pdf20 Apr 2026
Withdrawal Update Form 3File: FORM 3 VV ph 1 30032026_11zon.pdf20 Apr 2026
Withdrawal Update Form 1File: FORM 1 Velvet VIllas Phase 1 07012026 compressed.pdf17 Jan 2026
Withdrawal Update Form 2File: FORM 2 Velvet Villas Phase 1 20122025 compressed.pdf17 Jan 2026
Withdrawal Update Form 3File: FORM 3 velvet villa phase 1.pdf17 Jan 2026
Withdrawal Update Form 1File: FORM 1 VELVET VILLAS PH1 27062024.pdf20 Oct 2025
Withdrawal Update Form 1File: FORM 1 VELVET VILLAS PH1 27062024.pdf20 Oct 2025
Withdrawal Update Form 1File: FORM 1 VELVET VILLAS PH1 27062024.pdf20 Oct 2025
Withdrawal Update Form 2File: FORM 2 VELVET VILLA Phase I 30092025.pdf20 Oct 2025
Withdrawal Update Form 2File: FORM 2 VELVET VILLA Phase I 30092025.pdf20 Oct 2025
Withdrawal Update Form 2File: FORM 2 VELVET VILLA Phase I 30092025.pdf20 Oct 2025
Withdrawal Update Form 3File: FORM 3 VELVET VILLA PHASE 1.pdf20 Oct 2025
Withdrawal Update Form 3File: FORM 3 VELVET VILLA PHASE 1.pdf20 Oct 2025
Withdrawal Update Form 3File: FORM 3 VELVET VILLA PHASE 1.pdf20 Oct 2025
Form 5 (FY 2024-2025)File: vtp VelVet Villa Phase 1.pdf24 Sep 2025
Form 2A (FY 2024-2025)File: FORM 2A- VELVET VILLAS PHASE 1 - Copy.pdf23 Jun 2025
Form 1File: FORM 1 VELVET VILLA PHASE 1 31032025.pdf22 May 2025
Form 2File: Form 2 Velvet Villa Ph 1.pdf22 May 2025
Form 3File: Form 3 Velvet Villa Ph 1.pdf22 May 2025
Disclosure of Sold and Booked InventoryFile: VELVET PH1 31032025.pdf22 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Velvet Villa Ph 1.pdf30 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Velvet Villa Ph 1.pdf23 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 VELVET VILLA PHASE 1 31032025.pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 VELVET VILLA PHASE 1 31032025.pdf12 Apr 2025
Disclosure of sold/ booked inventoryFile: VELVET PH1 31032025.pdf7 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 VELVET VILLA PHASE 1 31122024.pdf29 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 VELVET VILLAS PHASE 1 31122024.pdf21 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 VELVET VILLAS PHASE 1 31122024.pdf10 Jan 2025
Disclosure of sold/ booked inventoryFile: VELVET PHASE 1 31122024.pdf9 Jan 2025
Details of encumbrancesFile: velvet vilas phase 1.pdf21 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Velvet villas phase 1 form 1 30 9 2022.pdf9 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 VELVET VILLAS 1 31062022_compressed.pdf9 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 VELV 1 31122022.pdf9 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 VELVET 1 30092023.pdf7 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Velvet villa ph1 Sept 2022.pdf7 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 VElvet Villa ph1 Sept 2024.pdf7 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form-5 Velvet Villa Phase1.pdf25 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 VELVET VILLAS PHASE 1 30092024.pdf22 Oct 2024
Disclosure of sold/ booked inventoryFile: VELVET VILLA PH1 30062024.pdf16 Oct 2024
Disclosure of sold/ booked inventoryFile: VELVET VILLA PH1 30092024.pdf16 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1- VELVET VILLA PHASE 1 09102024.pdf14 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2-VELVET VILLAS PHASE 2 24062024.pdf16 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 VELVET VILLA PHASE 1 26062024.pdf16 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 270624 VelvetVillas P 1.pdf6 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2-VELVET VILLAS PHASE 1 24062024.pdf5 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A VELVET VILLAS PHASE 1 31032024.pdf16 May 2024
Disclosure of sold/ booked inventoryFile: INVENTORY VELVET VILLAS PHASE 1 31032024.pdf15 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 VELVET VILLAS PHASE 1 31032024.pdf27 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 VELVET VILLAS 1 31032024.pdf27 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 VELVET PHASE 1 26032024.pdf4 Apr 2024
Disclosure of sold/ booked inventoryFile: INVENTORY VELVET VILLAS PHASE 1 30092022.pdf16 Mar 2024
Disclosure of sold/ booked inventoryFile: INVENTORY VELVET VILLAS PHASE 1 31122022.pdf16 Mar 2024
Disclosure of sold/ booked inventoryFile: INVENTORY VELVET VILLAS PHASE 1 31032023.pdf16 Mar 2024
Disclosure of sold/ booked inventoryFile: INVENTORY VELVET VILLAS PHASE 1 30062023.pdf16 Mar 2024
Disclosure of sold/ booked inventoryFile: INVENTORY VELVET VILLAS PHASE 1 30092023.pdf16 Mar 2024
Disclosure of sold/ booked inventoryFile: INVENTORY VELVET VILLAS PHASE 1 31122023.pdf16 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 VELVET VILLAS PHASE 1 31122023.pdf22 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 VELVET PHASE 1 31122023.pdf22 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 VELVET VILLAS PHASE 1 31122023.pdf22 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 VELVET 1 30092023.pdf19 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 VELVET 1 30092023.pdf19 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 Velvet villa 1 30062023.pdf14 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 VELVET VILLAS PHASE 1 2022-23.pdf28 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 VELVET VILLAS PHASE 1 30092023.pdf19 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 VELVET VILLAS PHASE 1 30062023.pdf21 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A VELVET VILLAS PHASE 1 31032023.pdf29 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 VELVET VILLAS PHASE 1 30062023_compressed.pdf24 Aug 2023
Details of encumbrancesFile: FE Velvet Villas 1 010823.pdf2 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 VELVET VILLAS PHASE 1 30062023_compressed.pdf24 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 VELVET VILLAS PH 1 31032023.pdf12 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 VELVET VILLAS PH 1 31032023.pdf12 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 VELVET VILLAS 1 31032023.pdf6 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 VELVET VILLAS 1 31032023.pdf21 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 VELVET VILLAS 1 31032022_compressed.pdf17 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 VELVET VILLAS 1 31062022_compressed.pdf17 Apr 2023

How this compares with Pune

61%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 12 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep VELVET VILLAS PHASE 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MANJARI KH13,700+ in Pune

Builder: ASHDAN DEVELOPERS PRIVATE LIMITED

Ashdan Developers Private Limited has 16 registrations on MahaRERA, including Vtp Cygnus- Nation R1-Tower 9 and VTP Beaumonde-Nation R2 T1. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 9 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if VELVET VILLAS PHASE 1 is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VELVET VILLAS PHASE 1?

The registered promoter entity is ASHDAN DEVELOPERS PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VELVET VILLAS PHASE 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against VELVET VILLAS PHASE 1?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for VELVET VILLAS PHASE 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VELVET VILLAS PHASE 1?

The professionals named in the filing: Architect: Vk arch; Architect: ANA CONSORTIUM PVT LTD.; Architect: ANA CONSORTIUM PVT LTD; Architect: VK:a; Engineer: Pravin Bhosale; Engineer: Girish Awinashe. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VELVET VILLAS PHASE 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VELVET VILLAS PHASE 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VELVET VILLAS PHASE 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.