Home / Browse projects / Thane, Maharashtra / Veer Vishwa

Registered No litigation declared Residential / Group Housing project

Veer Vishwa

By VEER LIFE SPACES LLP

RG-MH-06695 · RERA P51700054017 · Last updated on MahaRERA portal: 22 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 3 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Feb 2027Possession promisedno revision filed
9 of 22Construction stages doneacross 2 buildings; furthest along: Internal walls, 50%
0Complaints at MahaRERAon this registration
Jump to the 57 documents Report an error

Veer Vishwa is a Residential / Group Housing project by VEER LIFE SPACES LLP in Thane, Maharashtra, registered with MahaRERA as P51700054017 on 19 Dec 2023. Possession is promised by 20 Feb 2027.

At a glance

Project

  • NameVeer Vishwa
  • TypeResidential / Group Housing
  • Location
    • Mahatma ghandhi road
    • Naupada Thane west
    • Thane (M Corp.)
    • Thane
    • 400602
  • Pincode400602
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700054017
  • ReraGenie IDRG-MH-06695

Builder

  • NameVEER LIFE SPACES LLP
  • Entity typePartnership
  • PartnerTina Bhushan Bhanushali
  • Other registrations3 more →
  • Declared earlier projects5 →

Key dates

this monthRegisteredDec 2023PromisedFeb 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on19 Dec 2023
  • Promised completion20 Feb 2027
  • Revised completionNone
  • Buildings2 building records
  • Documents filed57 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Veer VishwaWing ANA77000
Veer Vishwa Wing BNA99000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 22 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 50%.

Veer VishwaWing A38%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises20%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Veer Vishwa Wing B52%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises20%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks5%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 22 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,029 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
Vishweshwari co-op Hsg Soc LtdThane (M Corp.)Thane
BHUSHAN BHANUSHALIThane (M Corp.)Thane

Approvals and building plan

Sanctioning authorityThane Municipal Corporation
Permissible FSI4744.19
Proposed, not sanctioned3,682 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchTEEN HAT NAKA THANE WEST

Certifying professionals and partners

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

PartnerRole in project
VEER LIFE SPACES LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Sep 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Sep 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Sep 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Sep 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 20 Feb 2027

Documents filed57

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: FORM 1-VEER VISHWA 31-03-2026.pdf22 May 2026
Form 2File: FORM-2 VEER VISHWA 31-03-2026.pdf22 May 2026
Form 3File: Form 3 Veer vishwa AS ON MARCH 2026.pdf22 May 2026
Disclosure of Sold and Booked InventoryFile: Circular 29 - VEER VISHWA AS ON MARCH 2026.pdf22 May 2026
Form 1File: Form 1 - Veer Vishwa as on Dec 2025.pdf28 Jan 2026
Form 2File: Form 2 - Veer Vishwa as on Dec 2025.pdf28 Jan 2026
Form 3File: Form 3 - Veer Vishwa as on Dec 2025.pdf28 Jan 2026
Disclosure of Sold and Booked InventoryFile: Circular 29 - Veer Vishwa as on Dec 2025.pdf28 Jan 2026
Form 1File: Form 1 - Veer Vishwa as on June 2025.pdf22 Nov 2025
Form 2File: Form 2 - Veer Vishwa as on June 2025.pdf22 Nov 2025
Form 3File: Form 3 - Veer Vishwa as on June 2025.pdf22 Nov 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 - Veer Vishwa as on June 2025.pdf22 Nov 2025
Form 1File: Form 1 - Veer Vishwa as on Sep 2025.pdf21 Nov 2025
Form 2File: Form 2 - Veer Vishwa as on Sep 2025.pdf21 Nov 2025
Form 3File: Form 3 - Veer Vishwa as on Sep 2025.pdf21 Nov 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 - Veer Vishwa as on Sep 2025.pdf21 Nov 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: QTR-4 FORM-1 VEER VISHWA.pdf9 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: QTR-4 FORM -3 veer vishwa_.pdf9 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: QTR-4 FORM -2 VEER VISHWA.pdf9 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: VEER VISHWA FORM 1.pdf6 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: veer vishwa form 3.pdf6 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate - Veer Vishwa.pdf6 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: VEER VISHWA -ANNUAL REPORT SIGN.pdf24 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 VEER VISHWA.pdf21 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 - VEER VISHWA1.pdf21 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 - veer vishwa - certificate - rcc.pdf21 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate - 13 Dec 2023 (3)_compressed.pdf14 Dec 2023
Declaration about Commencement CertificateFile: FORM D - VEER VISHWA - VEER LIFE SPACES LLP.pdf6 Dec 2023
Deviation Report with respect to model copy of AgreementFile: Deviation report new.pdf16 Nov 2023
CERSAI detailsFile: CERSAI_Search_Report_200282404425_For_Asset_Based_Search_03_10_2023_16_35_44_884.pdf3 Oct 2023
Layout approvalFile: SANCTION PLAN - LAYOUT.pdf30 Sep 2023
Building plan approvalFile: SANCTION PLAN - PLOTED DEVELOPMENT_compressed 1.pdf30 Sep 2023
Building plan approvalFile: SANCTION PLAN - PLOTED DEVELOPMENT_compressed 2.pdf30 Sep 2023
PAN CardFile: VEER LIFE SPACES LLP - PAN.pdf30 Sep 2023
PAN CardFile: Bhushan Sir Pan Card.pdf30 Sep 2023
PAN CardFile: Tina Mam Pan Card.pdf30 Sep 2023
PAN CardFile: Vishweshwari soc pan card .pdf30 Sep 2023
Copy of the legal title reportFile: Title Report Vishweshwari.pdf30 Sep 2023
Details of encumbrances concerned to FinanceFile: ENCUBRANCE FINANCE.pdf30 Sep 2023
Details of encumbrances concerned to FinanceFile: ENCUBRANCE LEGAL.pdf30 Sep 2023
Details of encumbrances concerned to LegalFile: ENCUBRANCE FINANCE.pdf30 Sep 2023
Details of encumbrances concerned to LegalFile: ENCUBRANCE LEGAL.pdf30 Sep 2023
Copy of Layout Approval (in case of layout)File: SANCTION PLAN - LAYOUT.pdf30 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: SANCTION PLAN - PLOTED DEVELOPMENT_compressed 1.pdf30 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: SANCTION PLAN - PLOTED DEVELOPMENT_compressed 2.pdf30 Sep 2023
Commencement Certificates / NA Order for plotted developmentFile: CC - VISHWESHWARI.pdf30 Sep 2023
Declaration in FORM BFile: Affidavit 1 - Form B - Veer life Spacess.pdf30 Sep 2023
Declaration in FORM BFile: Affidavit 2 - Form B - Veer life Spacess.pdf30 Sep 2023
Declaration in FORM BFile: AFFIDAVIT FORM B CUM DECLARATION society chairman.pdf30 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Rera form-1 - vishweshvari_compressed.pdf30 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Rera form-2 -vishweshvari_compressed (1).pdf30 Sep 2023
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD BOOK INVENTORY.pdf30 Sep 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Discloser of other real estate organisation Anexure A.pdf30 Sep 2023
Proforma of Agreement for saleFile: Vishweshwaari CHSL Agr A F SALE.pdf30 Sep 2023
Proforma of Allotment letterFile: ANENEXURE I -MODEL FORM OF ALLOTMENT LETTER_compressed (1).pdf30 Sep 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: RERA BANK AC DETAILS FORM.pdf30 Sep 2023
Deviation Report with respect to Allotment letterFile: Deviation Report.pdf30 Sep 2023

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Urban villaLouiswadi thane west78CompletedDec 2023Apr 2023

How this compares with Thane

24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Veer Vishwa on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Naupada Thane west7,600+ in Thane

2 kmVeer VishwaCompleted 103Lapsed / revoked 75Other 137Dot size: filed unitsN

Filed coordinates, straight-line distance. 315 registered projects within 2 km.

Builder: VEER LIFE SPACES LLP

VEER LIFE SPACES LLP has 4 registrations on MahaRERA, including Veer Vishwa and Veer Heights. Its filings disclose 5 earlier MahaRERA projects: declares 1 of 2 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Veer Vishwa is delayed beyond 20 Feb 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Veer Vishwa?

The registered promoter entity is VEER LIFE SPACES LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Veer Vishwa?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Veer Vishwa?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

What should I check before booking in Veer Vishwa?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Veer Vishwa. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Veer Vishwa to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.