Home / Browse projects / Mumbai Suburban, Maharashtra / Veena Suyog

Registered No litigation declared Residential / Group Housing project

Veena Suyog

By Veena Developers

RG-MH-42553 · RERA P51800050707 · Last updated on MahaRERA portal: 22 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 3 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 6 other registrations.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
0 of 22Construction stages doneacross 2 buildings; furthest along: Excavation, 0%
6 of 62Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 109 documents Report an error

Veena Suyog is a Residential / Group Housing project by Veena Developers in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800050707 on 28 Apr 2023. Possession is promised by 31 Dec 2026. 56 of the 62 units on this registration are recorded sold or booked, and 0 of 22 construction stages are filed complete.

At a glance

Project

  • NameVeena Suyog
  • TypeResidential / Group Housing
  • Location
    • S V Road
    • Opp N L High School
    • Borivali
    • Mumbai Suburban
    • 400064
  • Pincode400064
  • RERA no.P51800050707
  • ReraGenie IDRG-MH-42553

Builder

  • NameVeena Developers
  • Entity typeOthers
  • GSTIN27AAMFN6585H1ZN
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersVEENA Sanghavi, Haresh Natvarlal Sanghavi Sanghavi
  • PartnerNIKUNJ Sanghavi
  • Other registrations6 more →
  • Completed4 of 7
  • Declared earlier projects4 →

Key dates

this monthRegisteredApr 2023PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on28 Apr 2023
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings2 building records
  • Documents filed109 files

Current status

90%56 of 62 units booked

Figures as on 22 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Veena Suyog - A wingNA23060262
Veena Suyog - B wingNA10000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 22 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Excavation, at 0%.

Veena Suyog - A wing0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Veena Suyog - B wing0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 22 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed106

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots106
Closed/Covered106

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,991 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI6642.18
Proposed, not sanctioned4,679 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchVile Parle East

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectNishit Sunil Sanghavi
EngineerRajeev Ranjan
Chartered AccountantThar & Co.
Chartered AccountantSanjayK Sharma & Co
PartnerRole in project
Veena Developers-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 6 Feb 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 1 Mar 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 7 Nov 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Dec 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed109

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 109 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: FORM 01 Q4 2025-26.pdf22 Apr 2026
Form 2File: Form 02 Q4 2025-26.pdf22 Apr 2026
Form 3File: Form 3 Q4 2025-26.pdf22 Apr 2026
Disclosure of Sold and Booked InventoryFile: VEENA Suyog Sold Inventary - as on Mar- 2026.pdf22 Apr 2026
Form 1File: FORM 01 RERA CERTIFICATE.pdf4 Feb 2026
Form 2File: Form 2 Veena Suyog 120120260001.pdf4 Feb 2026
Form 3File: Form 03 Veena Suyog Q3 FY 25-26.pdf4 Feb 2026
Disclosure of Sold and Booked InventoryFile: Rera Inventory Details Q3 FY 25-26.pdf4 Feb 2026
Form 1File: RERA FORM 01 CERTIFICATE DATED.pdf4 Dec 2025
Form 2File: Form 2 Engineer Certificate REvised Suyog.pdf4 Dec 2025
Form 3File: Veena Suyog form 3 Sep 2025 Final Signed_compressed.pdf4 Dec 2025
Disclosure of Sold and Booked InventoryFile: Inventory Details Veena Suyog Q3 FY 25 26.pdf4 Dec 2025
Form 1File: Form1 Architect Certificate Suyog.pdf19 Jul 2025
Form 2File: Form 2 Engineer Certificate Q1 FY 25-26.pdf19 Jul 2025
Form 3File: Form 03 Q1 FY 25 - 26 30-06-2025.pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: Veena Suyog inventory disclosure 30-06-2025.pdf19 Jul 2025
Form 1File: form 1 Q4.pdf21 May 2025
Form 2File: Form 2 Q4.pdf21 May 2025
Form 3File: Form 3 Q4.pdf21 May 2025
Form 1File: RERA CERTIFICATE DATED.pdf16 May 2025
Form 2File: Form 2 - Engineer Certificate - REvised Suyog Q3 FY 24-25.pdf16 May 2025
Form 3File: Form 03 Veena Suyog Q3 FY 24-25 .pdf16 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Form 3 Suyog June.pdf11 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form -3 Signed Suyog Sep.pdf11 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Veena Suyog Aug 24.pdf11 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Veena Suyog Oct 24.pdf11 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 05 Suyog.pdf11 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: VEENA SUYOG Form 1 Certificate Q12425.pdf25 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: VEENA SUYOG Form 1 Certificate Q22425.pdf25 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Form-1 Veena Suyog (signed).pdf4 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Work Completion Certificate Form1.pdf3 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA CERTIFICATE DATED 31 03 24.pdf3 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate 12 04 2024.pdf3 May 2024
Disclosure of sold/ booked inventoryFile: Sold Inventory 30 03 24.pdf3 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate 29 04 2024.pdf3 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 veena suyog.pdf4 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate dec23.pdf4 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Work Completion Certificate Form 1.pdf3 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 veena suyog.pdf3 Apr 2024
Disclosure of sold/ booked inventoryFile: Sold Inventory Veena Suyog_0001.pdf3 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: From 3 DEC 2023 Veena Suyog uplaod.pdf3 Apr 2024
Commencement Certificates / NA Order for plotted developmentFile: 2407001_FurtherCC_signed.pdf19 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate Veena Suyog 30 09 2023.pdf19 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate 04 11 2023.pdf19 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A Certificate 15 12 2023.pdf19 Dec 2023
Proforma of Agreement for saleFile: VEENA SUYOG-DRAFT AGREEMENT.pdf14 Dec 2023
Building plan approvalFile: AMENDED IOD 6 -9.pdf7 Nov 2023
Building Plan Approval / NA Order for plotted developmentFile: AMENDED IOD 6 -9.pdf7 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate 30 06 2023.pdf28 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Suyog 30062023.pdf28 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A Certificate Form3 Veena Suyog 26102023_compressed.pdf28 Oct 2023
Building plan approvalFile: AMENDED IOD 1-5.pdf26 Oct 2023
Building plan approvalFile: AMENDED IOD 6 -9.pdf26 Oct 2023
Building plan approvalFile: SUYOG IOD.pdf26 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: AMENDED IOD 1-5.pdf26 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: AMENDED IOD 6 -9.pdf26 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: SUYOG IOD.pdf26 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Form-1 Veena Suyog.pdf12 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificale.pdf12 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A Certificate Veena Suyog march 23.pdf12 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3.pdf22 Apr 2023
Other - TechnicalFile: Build up Summary As per IOD Up to 15th Floor.pdf17 Apr 2023
Other - TechnicalFile: Letter To Rera 15 04 2023.pdf17 Apr 2023
Layout approvalFile: IOD.pdf1 Mar 2023
Copy of Layout Approval (in case of layout)File: IOD.pdf1 Mar 2023
Commencement Certificates / NA Order for plotted developmentFile: CC upto Plinth.pdf1 Mar 2023
Declaration about Commencement CertificateFile: CC Declaration.pdf1 Mar 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 1 Disclosure of Interest in Other Real Estate Organizations.pdf1 Mar 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 2 Disclosure of Interest in Other Real Estate Organizations.pdf1 Mar 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 3 Disclosure of Interest in Other Real Estate Organizations (1).pdf1 Mar 2023
Proforma of Agreement for saleFile: SUYOG FINAL RERA AFS.pdf1 Mar 2023
Proforma of Allotment letterFile: ALLOTMENT LETTER suyog 1.pdf1 Mar 2023
Deviation Report with respect to Allotment letterFile: List of Deviation allotment.pdf1 Mar 2023
Deviation Report with respect to model copy of AgreementFile: Deviation of AFS.pdf1 Mar 2023
Building plan approvalFile: Plan1.pdf6 Feb 2023
Building plan approvalFile: Plan2.pdf6 Feb 2023
Building plan approvalFile: Plan3.pdf6 Feb 2023
Building plan approvalFile: Plan4.pdf6 Feb 2023
Building plan approvalFile: Plan5.pdf6 Feb 2023
Building plan approvalFile: Plan6.pdf6 Feb 2023

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
VEENA SKY HEIGHTSVILLAGE KANDIVALI AT MAHAVIR NAGAR KANDIVALI WEST79CompletedJan 2017Jan 2017
VEENA ROYAL VILLASHANKAR LANE KANDIVALI WEST7CompletedNov 2016Nov 2016
VEENA SAHIL VILLASHANKAR LANE KANDIVALI10CompletedDec 2012Dec 2012

How this compares with Mumbai Suburban

90%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Veena Suyog on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Opp N L High School6,700+ in Mumbai Suburban

Builder: Veena Developers

Veena Developers has 7 registrations on MahaRERA, including VEENA SANTOOR PHASE II and VEENA SIGNATURE. Its filings disclose 4 earlier MahaRERA projects: declares 4 of 4 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Veena Suyog is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Veena Suyog?

The registered promoter entity is Veena Developers, an others as per the filing. Its GSTIN 27AAMFN6585H1ZN can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Veena Suyog?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Veena Suyog?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Veena Suyog?

The professionals named in the filing: Architect: Nishit Sunil Sanghavi; Engineer: Rajeev Ranjan; Chartered Accountant: Thar & Co.; Chartered Accountant: SanjayK Sharma & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Veena Suyog?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Veena Suyog. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Veena Suyog to a free account