Home / Browse projects / Thane, Maharashtra / Vedant Palacia Phase III Wing A-AETIUS

Registration lapsed Litigation declared Residential / Group Housing project

Vedant Palacia Phase III Wing A-AETIUS

By THARWANI PROPERTIES

RG-MH-86498 · RERA P51700033028 · Last updated on MahaRERA portal: 3 Nov 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 13 months past the filed date
  • Litigation declared, 2 cases
  • Completion date moved by 2 months
  • 1 extension taken

Clear

  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Sep 2025Possession promised13 months past this date
6 of 11Construction stages donefurthest along: Staircases, 95%
63 of 130Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 126 documents Report an error

Vedant Palacia Phase III Wing A-AETIUS is a Residential / Group Housing project by THARWANI PROPERTIES in Thane, Maharashtra, registered with MahaRERA as P51700033028 on 3 Feb 2022. Possession was promised by 30 Sep 2025 and is now 13 months past that date. The completion date has moved by 2 months from the original filing. 67 of the 130 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete.

At a glance

Project

  • NameVedant Palacia Phase III Wing A-AETIUS
  • TypeResidential / Group Housing
  • Location
    • GHANDHARE
    • Gandhare
    • Kalyan
    • Thane
    • 421301
  • Pincode421301
  • RERA no.P51700033028
  • ReraGenie IDRG-MH-86498

Builder

  • NameTHARWANI PROPERTIES
  • Entity typePartnership
  • GSTIN27ABJFS2357J1ZS
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersMOHAN HARDASMAL THARWANI, SANTOSH RAJKUMAR CHIJWANI
  • Other registrations4 more →
  • Completed2 of 5
  • No longer live1 lapsed, de-registered or revoked

Key dates

13 months past promisethis monthRegisteredFeb 2022First promiseJul 2025Revised toSep 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on3 Feb 2022
  • Promised completion30 Sep 2025
  • Revised completionRevised to 30 Sep 2025 (originally 31 Jul 2025)
  • Buildings1 building record
  • Documents filed126 files

Current status

52%67 of 130 units booked

Figures as on 3 Nov 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING A-AETIUSNA41331300130

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 3 Nov 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 95%.

WING A-AETIUS: 86% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises85%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.85%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 3 Nov 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed141

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots141
Closed/Covered124
Open Space17

Land and ownership11

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area592 sq m
Land owned byThe promoter, with other names on the file
Named landowners11
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on5 Nov 2025
LandownerVillageDistrict
MARUDHARA BUILDERSKalyanThane
Babybai Suresh SonawaneGandhareThane
Parvatibai Shankar BhandariGandhareThane
Bhupendra Maruti BhandariGandhareThane
Ujjwala Rajesh BhandariGandhareThane
Chandni Dnyaneshwar BhoirGandhareThane
Suresh Shankar BhandariGandhareThane
Hirabai Shankar BhandariGandhareThane
Yojana Rajesh BhandariGandhareThane
Karan Rajesh BhandariGandhareThane
Ramchandra Gajanan BhandariGandhareThane

Approvals and building plan

Sanctioning authorityKalyan Dombivli Municipal Corporation
Permissible FSI15310.78
Proposed, not sanctioned15,311 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchULHASNAGAR-2

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectARCHITECT INC
EngineerAVANISH & ASSOCIATES
EngineerEpicons Consultants Pvt.Ltd
Chartered AccountantASL LALCHANDANI & ASSOCIATES
Chartered AccountantVERHANI & CO
Chartered AccountantAtul A Shetye
PartnerRole in project
THARWANI PROPERTIES-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA12112518310Jul 2025 → Sep 2025

Reason as filed by the promoterAs per the order no 24/2021 A (ii) promoter has to apply for an extension which will be valid upto the date upto date of the occupation certificate, post facto extension may be granted

Litigation declared2

CaseCourtStatus
349/2008KALYAN COURTEVIDENCE
349/2008KALYAN COURTOngoing

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 25 Jul 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 20 Jul 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Dec 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 11 Jul 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed126

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 126 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2File: Form 2.pdf3 Nov 2025
Form 3File: Form 3.pdf3 Nov 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold 2.pdf3 Nov 2025
Form 1File: Form 1.pdf3 Nov 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Vedant Palacia Wing - A.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_compressed.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold.pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf23 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_compressed.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: VEDANT PALACIA WING A.pdf4 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_compressed.pdf17 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf17 Oct 2024
Disclosure of sold/ booked inventoryFile: sold Unsold.pdf17 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf7 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5.pdf7 Oct 2024
Copy of the legal title reportFile: Legal Title Report TP.pdf25 Jul 2024
Copy of the legal title reportFile: ilovepdf_merged_compressed.pdf25 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf20 Jul 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_compressed.pdf20 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf20 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf20 Apr 2024
Disclosure of sold/ booked inventoryFile: Sold unsold.pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_compressed.pdf20 Apr 2024
Proforma of Agreement for saleFile: Palacia A (1).pdf15 Apr 2024
Deviation Report with respect to model copy of AgreementFile: Deviation Report Apr Palacia A Wing.pdf15 Apr 2024
Disclosure of sold/ booked inventoryFile: sold unsold for.pdf27 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 1520_compressed.pdf27 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_compressed (1).pdf20 Jan 2024
Disclosure of sold/ booked inventoryFile: sold unsold_compressed (1).pdf20 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3_compressed.pdf20 Jan 2024
Disclosure of sold/ booked inventoryFile: sold booked _compressed.pdf27 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_compressed.pdf20 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf20 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_compressed.pdf20 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: form 5 REVISED.pdf20 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A.pdf17 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf29 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE_compressed.pdf27 Sep 2023
Layout approvalFile: Layout.PDF20 Jul 2023
Copy of Layout Approval (in case of layout)File: Layout.PDF20 Jul 2023
Other - TechnicalFile: DECLARATION (1).pdf20 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf19 Jul 2023
Declaration about Commencement CertificateFile: Wing A.pdf12 Jul 2023
Copy of the legal title reportFile: Legal_3_merged.pdf11 Jul 2023
Commencement Certificates / NA Order for plotted developmentFile: Palacia Revised CC.pdf11 Jul 2023
Declaration about Commencement CertificateFile: Format D CC declaration.pdf11 Jul 2023
OtherFile: Decleration-A 52.pdf11 Jul 2023
Layout approvalFile: PALACIA CC 10-11-2022_page-A WING_compressed.pdf9 Jun 2023
Copy of Layout Approval (in case of layout)File: PALACIA CC 10-11-2022_page-A WING_compressed.pdf9 Jun 2023
Commencement Certificates / NA Order for plotted developmentFile: KDMC Sanction.PDF8 Jun 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold A wing Palicia.PDF3 May 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 A wing Palicia.PDF3 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_compressed.pdf24 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.PDF24 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.PDF24 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: form 5 REVISED.pdf24 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A.pdf21 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5.PDF21 Apr 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: BABK DECLARATION.PDF21 Mar 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A WING A_compressed.pdf27 Dec 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5_0001-1.pdf27 Dec 2022
Declaration about Commencement CertificateFile: form D.PDF17 Nov 2022
OtherFile: Declaration 1_compressed.pdf17 Nov 2022
OtherFile: Others.pdf17 Nov 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_compressed.pdf6 Sep 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_compressed.pdf6 Sep 2022
OtherFile: DECLARATION FOR LITIGATION.PDF19 May 2022
OtherFile: DECLARATION A_compressed.pdf15 Mar 2022
OtherFile: PLAN_compressed.pdf15 Mar 2022
OtherFile: SALE AREA STATEMENT.pdf15 Mar 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 A wing_compressed.pdf28 Jan 2022
OtherFile: DECLARATION FOR LITIGATION.PDF28 Jan 2022
Copy of the legal title reportFile: LEGAL TITLE REPORT_compressed.pdf27 Jan 2022
Commencement Certificates / NA Order for plotted developmentFile: CC_compressed.pdf27 Jan 2022

How this compares with Thane

52%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 2 months
23%of Thane registrations have lapsed or been cancelledthis one is among them

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Vedant Palacia Phase III Wing A-AETIUS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near GHANDHARE7,600+ in Thane

Builder: THARWANI PROPERTIES

THARWANI PROPERTIES has 5 registrations on MahaRERA, including Vedant Palacia Phase I Wing A1 PROPSERA and Vedant Palacia Phase II Wing A2-PROTICA. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 3 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What does it mean that Vedant Palacia Phase III Wing A-AETIUS shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Vedant Palacia Phase III Wing A-AETIUS is delayed beyond 30 Sep 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Vedant Palacia Phase III Wing A-AETIUS?

The registered promoter entity is THARWANI PROPERTIES, a partnership as per the filing. Its GSTIN 27ABJFS2357J1ZS can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Vedant Palacia Phase III Wing A-AETIUS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Vedant Palacia Phase III Wing A-AETIUS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Vedant Palacia Phase III Wing A-AETIUS?

The professionals named in the filing: Architect: ARCHITECT INC; Engineer: AVANISH & ASSOCIATES; Engineer: Epicons Consultants Pvt.Ltd; Chartered Accountant: ASL LALCHANDANI & ASSOCIATES; Chartered Accountant: VERHANI & CO; Chartered Accountant: Atul A Shetye. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Vedant Palacia Phase III Wing A-AETIUS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Vedant Palacia Phase III Wing A-AETIUS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Vedant Palacia Phase III Wing A-AETIUS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.