VEDANT NAKSHATRA WING J PHASE VI
RG-MH-30709 · RERA P51700031084 · Last updated on MahaRERA portal: 9 Apr 2025
Source: official MahaRERA filing
Red flags
- Completion date moved by 2 months
- 2 extensions taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
VEDANT NAKSHATRA WING J PHASE VI is a Residential / Group Housing project by MOHAN HARDASMAL THARWANI in Thane, Maharashtra, registered with MahaRERA as P51700031084 on 5 Oct 2021. The registration is recorded completed; possession was promised by 21 Feb 2025. The completion date has moved by 2 months from the original filing.
At a glance
Project
- NameVEDANT NAKSHATRA WING J PHASE VI
- TypeResidential / Group Housing
- Location
- BADLAPUR
- Badlapur (M Cl)
- Ambarnath
- Thane
- 421503
- Pincode421503
- RERA no.P51700031084
- ReraGenie IDRG-MH-30709
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on5 Oct 2021
- Promised completion21 Feb 2025
- Revised completionRevised to 21 Feb 2025 (originally 31 Dec 2024)
- Buildings1 building record
- Documents filed81 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| VEDANT NAKSHATRA WING J PHASE VI | NA | 19 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 9 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
7 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 95%.
VEDANT NAKSHATRA WING J PHASE VI: 72% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 95% |
Progress on shared amenities15
As on 9 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed1
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | ARCHITECT INC |
| Engineer | AVANISH & ASSOCIATES |
| Chartered Accountant | ASL & ASSOCIATES |
| Chartered Accountant | Verhani & Co |
| Partner | Role in project |
|---|---|
| MOHAN HARDASMAL THARWANI | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterPROJECT IS COMPLETED AND WE HAVE APPLIED OF FOR OC AND COPY OF APPLICATION OF ACKNOWLEGMENT IS ATTACHED WITH THE SAME AND SO WE REQUIORED EXTENSION FOR 1 MONTH, TILL DATE WE WILL GET OC OF WING J.
Reason as filed by the promoterThis is to inform you that our completion date of the above mentioned project was 31.01.2025. We have completed our project in all aspects and we have also received the occupation certificate for building name Vedant Nakshatra Wing J Phase VI for 18th Floors as mentioned registration application on 21.02.2025 As per the order no 24/2021 A (ii) promoter has to apply for an extension which will be valid upto the date of the occupation certificate, post facto extension may be granted. Hence we have applied for a Post facto extension, we request you to approve our Post facto extension upto the dat
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 25 Jul 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 25 Apr 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 25 Apr 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 30 Sep 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 25 Feb 2025
Documents filed81
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 81 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Declaration in FORM BFile: UPDATED FORM B.pdf | 9 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf | 28 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_compressed.pdf | 28 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 28 Mar 2025 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC J wing.pdf | 25 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 17 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_compressed.pdf | 17 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 17 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Sold unsold.pdf | 17 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 8 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_compressed.pdf | 17 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 17 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold.pdf | 17 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf | 7 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5.pdf | 7 Oct 2024 |
| Copy of the legal title reportFile: ilovepdf_merged (1)_compressed.pdf | 25 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 19 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 19 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Sold unsold.pdf | 19 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf | 19 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 20 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 20 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold.pdf | 20 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_compressed.pdf | 20 Apr 2024 |
| Proforma of Agreement for saleFile: Nak J (1).pdf | 15 Apr 2024 |
| Deviation Report with respect to model copy of AgreementFile: Deviation Report APR J WING.pdf | 15 Apr 2024 |
| OtherFile: Other Dec_compressed.pdf | 20 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_compressed.pdf | 17 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2_compressed (1).pdf | 17 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: Sol Unsold_compressed.pdf | 17 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_compressed.pdf | 17 Jan 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Scan_20231110_142458_compressed.pdf | 10 Nov 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Declaration_compressed.pdf | 10 Nov 2023 |
| Disclosure of sold/ booked inventoryFile: sold booked inventory_compressed.pdf | 27 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_compressed.pdf | 27 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_compressed.pdf | 20 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf | 20 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: form 2 (A).pdf | 20 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: form 5 Nak J wing .pdf | 20 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: disclosure of sold wing j.pdf | 26 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 5 Aug 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_compressed.pdf | 5 Aug 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form no 3_compressed.pdf | 5 Aug 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: J WING.PDF | 21 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 WNG J.PDF | 20 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate J Wing_compressed.pdf | 28 Nov 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A J WING 31 MARCH 22_compressed.pdf | 10 Nov 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_compressed (1).pdf | 10 Nov 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: J WING FORM 2_compressed.pdf | 27 Oct 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 J-WING.pdf | 17 May 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 j wing_compressed.pdf | 17 May 2022 |
| Layout approvalFile: layout_compressed_compressed_compressed_compressed_compressed.pdf | 25 Apr 2022 |
| Building plan approvalFile: Floor Plan-compressed_compressed (1)_compressed.pdf | 25 Apr 2022 |
| Building plan approvalFile: Floor plan 1_compressed.pdf | 25 Apr 2022 |
| Copy of Layout Approval (in case of layout)File: layout_compressed_compressed_compressed_compressed_compressed.pdf | 25 Apr 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Floor Plan-compressed_compressed (1)_compressed.pdf | 25 Apr 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Floor plan 1_compressed.pdf | 25 Apr 2022 |
| OtherFile: J-WING 25-4-2022.pdf | 25 Apr 2022 |
| OtherFile: J WING REVISED AREA_compressed (1).pdf | 25 Apr 2022 |
| OtherFile: ENCUMBRANCE CERTIFICATE WING J.PDF | 7 Apr 2022 |
| Declaration about Commencement CertificateFile: DECLARATION OF CC_compressed.pdf | 26 Mar 2022 |
| OtherFile: DECLARATION WING J_compressed.pdf | 26 Mar 2022 |
| Layout approvalFile: LAYOUT PLAN SHEET 1_compressed (1)-compressed - Copy.pdf | 30 Sep 2021 |
| Building plan approvalFile: WING J SHEET.pdf | 30 Sep 2021 |
| Building plan approvalFile: WING J SHEET 3 (1).pdf | 30 Sep 2021 |
| Building plan approvalFile: WING J SHEET 4 (1).pdf | 30 Sep 2021 |
| Copy of the legal title reportFile: Title Certificate and Flow of the Titile Said Property_compressed (1).pdf | 30 Sep 2021 |
| Copy of Layout Approval (in case of layout)File: LAYOUT PLAN SHEET 1_compressed (1)-compressed - Copy.pdf | 30 Sep 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: WING J SHEET.pdf | 30 Sep 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: WING J SHEET 3 (1).pdf | 30 Sep 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: WING J SHEET 4 (1).pdf | 30 Sep 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: VEDANT NAKSHATRA J K WING CC.pdf | 30 Sep 2021 |
| Declaration about Commencement CertificateFile: Declaration Of Commencement Certificate.pdf | 30 Sep 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 J Wing_compressed.pdf | 22 Sep 2021 |
| Proforma of Allotment letterFile: Allotment of Flat J_compressed (1).pdf | 22 Sep 2021 |
| Proforma of Allotment letterFile: NAKSHATRA-j.pdf | 22 Sep 2021 |
| PAN CardFile: PAN Card.pdf | 21 Sep 2021 |
| Details of encumbrancesFile: Declaration Of Non-Encumbrance (J).pdf | 21 Sep 2021 |
| Declaration in FORM BFile: Form B(3 (4)_compressed.pdf | 21 Sep 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate J Wing_compressed (1).pdf | 21 Sep 2021 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| VEDANT MILLENIA PHASE 1 | BEHIND MAHAGANPATI MANDIR TITWALA WEST | 402 | Completed | Mar 2016 | Late, Jul 2016 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 18 other registrations, which the RERA portal never shows together
- All 81 filed documents as one ZIP, foldered, with a manifest
Keep VEDANT NAKSHATRA WING J PHASE VI on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near BADLAPUR7,600+ in Thane
PRADHAN MANTRI AWAS YOJANA - URBAN
KULGAON BADLAPUR MUNICIPAL COUNCIL
Mohan Alcoves I
MOHAN LIFESPACES LLP
MANOHAR VIKAS SHREEJI PARAISO PHASE - 2
DEEPLAXMI DEVELOPERS
SHREEJI MILESTONE
DEEP LAXMI ASSOCIATES
Mohan Willows III
MOHAN LIFESPACES LLP
SHREEJI SQUARE PHASE I
SHREEJI DEVELOPERS
See every Thane project, with the district possession charts
Builder: MOHAN HARDASMAL THARWANI
MOHAN HARDASMAL THARWANI has 19 registrations on MahaRERA, including vedant nakshatra ABC phase 1 and vedant nakshatra M phase 2. Its filings disclose 4 earlier MahaRERA projects: declares 0 of 4 past projects completed on time. Litigation is declared on 3 of its registrations. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What are my rights if VEDANT NAKSHATRA WING J PHASE VI is delayed beyond 21 Feb 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of VEDANT NAKSHATRA WING J PHASE VI?
The registered promoter entity is MOHAN HARDASMAL THARWANI, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in VEDANT NAKSHATRA WING J PHASE VI?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for VEDANT NAKSHATRA WING J PHASE VI?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at VEDANT NAKSHATRA WING J PHASE VI?
The professionals named in the filing: Architect: ARCHITECT INC; Engineer: AVANISH & ASSOCIATES; Chartered Accountant: ASL & ASSOCIATES; Chartered Accountant: Verhani & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in VEDANT NAKSHATRA WING J PHASE VI?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback