Completed No litigation declared Residential / Group Housing project

VEDANT AMBER

By YASHWANT AJABRAO KHODKE

RG-MH-30445 · RERA P50500048289 · Last updated on MahaRERA portal: 21 Aug 2025

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Dec 2025Possession promisedregistration recorded completed
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
2 of 12Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 108 documents Report an error

VEDANT AMBER is a Residential / Group Housing project by YASHWANT AJABRAO KHODKE in Nagpur, Maharashtra, registered with MahaRERA as P50500048289 on 22 Dec 2022. The registration is recorded completed; possession was promised by 31 Dec 2025. 10 of the 12 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameVEDANT AMBER
  • TypeResidential / Group Housing
  • Location
    • PANDE LAYOUT
    • KHAMLA
    • Nagpur (M Corp.)
    • Nagpur (Urban)
    • Nagpur
    • 440025
  • Pincode440025
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500048289
  • ReraGenie IDRG-MH-30445

Builder

  • NameYASHWANT AJABRAO KHODKE
  • Entity typeIndividual

Key dates

this monthRegisteredDec 2022PromisedDec 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on22 Dec 2022
  • Promised completion31 Dec 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed108 files

Current status

83%10 of 12 units booked
100.0%Work done, per cost certificate

Figures as on 21 Aug 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
VEDANT AMBERNA7612012

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 21 Aug 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

VEDANT AMBER: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 21 Aug 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area441 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityNagpur Minicipal Corporation (NMC)
Permissible FSI1129.0
Proposed, not sanctioned1,129 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPBB RAMDASPETH NAGPUR
Estimated costRs 3.94 cr
Cost incurredRs 3.94 cr
Work done100.0%
BuildingWingEstimatedIncurred
VEDANT AMBERNARs 3.94 crRs 3.94 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectLOKESH KADU EMANATE DESIGN
EngineerARVIND KHODKE
Chartered AccountantANKIT TALREJA GAD AND ASSOCIATES
Chartered AccountantSUMIT SANTOSH AGRAWAL & ASSOCIATES
PartnerRole in project
YASHWANT AJABRAO KHODKE-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12502817Chhaya Kuldeep JainYASHWANT AJABRAO KHODKE12/08/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 24 Nov 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 24 Nov 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 Nov 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 24 Nov 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed108

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 108 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: VEDANT AMBER FORM 1 JUN-25.pdf21 Aug 2025
Withdrawal Update Form 2File: VEDANT AMBER FORM 2 JUN-25.pdf21 Aug 2025
Withdrawal Update Form 3File: VEDANT AMBER FORM 3 JUN-25.pdf21 Aug 2025
Form 5 (FY 2022-2023)File: Vedant Amber_FORM-5 MAR-23.pdf21 Aug 2025
Form 5 (FY 2023-2024)File: FORM-5 MAR-24.pdf21 Aug 2025
Form 1File: FORM 1 DEC-23.pdf20 Aug 2025
Form 2File: Vedant AMBER_Form-2-Engineers Certificate_DEC-23.pdf20 Aug 2025
Form 3File: RERA 3_Dec 2023 Vedant Amber.pdf20 Aug 2025
Disclosure of Sold and Booked InventoryFile: SOLD-UNSOLD DEC-23.pdf20 Aug 2025
Form 1File: FORM 1 DEC-24.pdf20 Aug 2025
Form 2File: Vedant AMBER_Form-2-Engineers Certificate_DEC-24.pdf20 Aug 2025
Form 3File: FORM-3_VEDANT AMBER_DEC-24.pdf20 Aug 2025
Disclosure of Sold and Booked InventoryFile: SOLD-UNSOLD DEC-24.pdf20 Aug 2025
Form 1File: FORM 1 JUN-24.pdf20 Aug 2025
Form 2File: Vedant AMBER_Form-2-Engineers Certificate_JUNE-24.pdf20 Aug 2025
Form 3File: Vedant Amber_FORM-3_June-24.pdf20 Aug 2025
Disclosure of Sold and Booked InventoryFile: SOLD-UNSOLD JUN-24.pdf20 Aug 2025
Form 1File: FORM 1 MAR-24.pdf20 Aug 2025
Form 2File: Vedant AMBER_Form-2-Engineers Certificate_MAR-24.pdf20 Aug 2025
Form 3File: Vedant Amber_FORM-3_Mar-24.pdf20 Aug 2025
Disclosure of Sold and Booked InventoryFile: SOLD-UNSOLD MAR-24.pdf20 Aug 2025
Form 1File: FORM 1 SEPT-24.pdf20 Aug 2025
Form 2File: Vedant AMBER_Form-2-Engineers Certificate_SEP-24.pdf20 Aug 2025
Form 3File: FORM 3 SEPT-24.pdf20 Aug 2025
Disclosure of Sold and Booked InventoryFile: SOLD-UNSOLD SEPT-24.pdf20 Aug 2025
Form 1File: FORM 1 MAR-25.pdf20 Aug 2025
Form 2File: FORM 2 MAR-25.pdf20 Aug 2025
Form 3File: FORM-3_VEDANT AMBER_MAR-25.pdf20 Aug 2025
Disclosure of Sold and Booked InventoryFile: SOLD-M-25.pdf20 Aug 2025
Form 1File: FORM-1 DEC-22.pdf20 Aug 2025
Form 2File: FORM-2 DEC-22.pdf20 Aug 2025
Form 3File: FORM-3_DEC-22.pdf20 Aug 2025
Disclosure of Sold and Booked InventoryFile: SOLD-UNSOLD DEC-22.pdf20 Aug 2025
Form 1File: FORM-1 MAR-23.pdf20 Aug 2025
Form 2File: FORM-2 MAR-23.pdf20 Aug 2025
Form 3File: FORM-3_MAR-23.pdf20 Aug 2025
Disclosure of Sold and Booked InventoryFile: SOLD-UNSOLD MAR-23.pdf20 Aug 2025
Form 1File: FORM 1 JUN-23.pdf20 Aug 2025
Form 2File: FORM 2 JUN-23.pdf20 Aug 2025
Form 3File: FORM-3_JUNE-23.pdf20 Aug 2025
Disclosure of Sold and Booked InventoryFile: SOLD-UNSOLD JUN-23.pdf20 Aug 2025
Form 1File: FORM 1 SEPT-23.pdf20 Aug 2025
Form 2File: FORM 2 SEPT-23.pdf20 Aug 2025
Form 3File: FORM-3_SEP-23.pdf20 Aug 2025
Disclosure of Sold and Booked InventoryFile: SOLD-UNSOLD SEPT-23.pdf20 Aug 2025
Form 5 (FY 2024-2025)File: FORM-5 MAR-25 VEDANT AMBER.pdf12 Aug 2025
Occupational CertificateFile: AMBER OCCUPANCY_merged.pdf27 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: va f1.pdf21 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: va f3.pdf21 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: va f2.pdf21 Apr 2025
Disclosure of sold/ booked inventoryFile: va s uns.pdf21 Apr 2025
Disclosure of sold/ booked inventoryFile: SOLD-inventory.pdf12 Feb 2025
Disclosure of sold/ booked inventoryFile: SOLD-D-23.pdf29 Jan 2025
Disclosure of sold/ booked inventoryFile: SOLD-M-24.pdf29 Jan 2025
Disclosure of sold/ booked inventoryFile: SOLD-j-24.pdf29 Jan 2025
Disclosure of sold/ booked inventoryFile: SOLD-S-24.pdf29 Jan 2025
Disclosure of sold/ booked inventoryFile: SOLD-D-24.pdf29 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3.pdf28 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3_VEDANT AMBER.pdf22 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2.pdf22 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 VEDANT AMBER 02-01-2025.pdf10 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Vedant Amber_Form-3.pdf13 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 Vedant Amber_Mar-24.pdf25 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3_SEP-24.pdf6 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Vedant AMBER_Form-2-Engineers Certificate_SEP-24.pdf6 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 VEDANT AMBER 05-10-2024.pdf20 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Vedant AMBER_Form-2-Engineers Certificate_JUNE-24.pdf2 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Vedant AMBER_Form-2-Engineers Certificate_DEC-23.pdf2 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Vedant AMBER_Form-2-Engineers Certificate_MAR-24.pdf2 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Vedant AMBER_Form-2-Engineers Certificate_JUNE-24.pdf2 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Vedant Amber_FORM-3_June-24.pdf2 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 TVEDANTAMBER 01-07-2024_organized.pdf3 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: vedant amber form 2a.pdf29 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Vedant Amber_FORM-3_Mar-24.pdf20 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Vedant Ambar Form 1.pdf12 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Vedant Amber_FORM-5.pdf4 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA 3_Dec 2023 Vedant Amber.pdf7 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 VEDANT AMBER_DEC-23.pdf18 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_VEDANT AMBER 05-01-2023.pdf2 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2_VEDANT AMBER 07-04-2023.pdf2 Oct 2023

How this compares with Nagpur

83%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one has not
22%of Nagpur registrations have lapsed or been cancelledthis one is completed

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep VEDANT AMBER on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KHAMLA2,800+ in Nagpur

2 kmVEDANT AMBERCompleted 35Lapsed / revoked 20Other 55Dot size: filed unitsN

Filed coordinates, straight-line distance. 110 registered projects within 2 km.

Builder: YASHWANT AJABRAO KHODKE

YASHWANT AJABRAO KHODKE has 1 registration on MahaRERA, including VEDANT AMBER. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if VEDANT AMBER is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VEDANT AMBER?

The registered promoter entity is YASHWANT AJABRAO KHODKE, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VEDANT AMBER?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against VEDANT AMBER?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for VEDANT AMBER?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VEDANT AMBER?

The professionals named in the filing: Architect: LOKESH KADU EMANATE DESIGN; Engineer: ARVIND KHODKE; Chartered Accountant: ANKIT TALREJA GAD AND ASSOCIATES; Chartered Accountant: SUMIT SANTOSH AGRAWAL & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VEDANT AMBER?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VEDANT AMBER. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VEDANT AMBER to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.