Home / Browse projects / Nagpur, Maharashtra / VED OCSP 5

Registered No litigation declared Others project

VED OCSP 5

By PRAFULVED INFRA & PRAFUL DESHMUKH ASSOCIATES 5 LLP

RG-MH-40742 · RERA P50500055838 · Last updated on MahaRERA portal: 30 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Jan 2031Possession promisedno revision filed
15 of 55Construction stages doneacross 5 buildings; furthest along: Slabs of Super Structure, 50%
33 of 167Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 107 documents Report an error

VED OCSP 5 is a Others project by PRAFULVED INFRA & PRAFUL DESHMUKH ASSOCIATES 5 LLP in Nagpur, Maharashtra, registered with MahaRERA as P50500055838 on 23 Apr 2024. Possession is promised by 11 Jan 2031. 134 of the 167 units on this registration are recorded sold or booked, and 15 of 55 construction stages are filed complete.

At a glance

Project

  • NameVED OCSP 5
  • TypeOthers
  • Location
    • Plot No. 05 ORANGE CITY STREET
    • KHAMLA NAGPUR
    • Nagpur (M Corp.)
    • Nagpur (Urban)
    • Nagpur
    • 440025
  • Pincode440025
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500055838
  • ReraGenie IDRG-MH-40742

Builder

  • NamePRAFULVED INFRA & PRAFUL DESHMUKH ASSOCIATES 5 LLP
  • Entity typePartnership
  • PartnerPRAFUL NARENDRA DESHMUKH

Key dates

this monthRegisteredApr 2024PromisedJan 2031

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on23 Apr 2024
  • Promised completion11 Jan 2031
  • Revised completionNone
  • Buildings5 building records
  • Documents filed107 files

Current status

80%134 of 167 units booked
55.0%Work done, per cost certificate

Figures as on 30 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Tower 1NA141132133
Tower 2NA141132234
Tower 3NA141133033
Tower 4NA141133134
Tower 5NA141133033

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building5

As on 30 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

15 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Slabs of Super Structure, at 50%.

Tower 135%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises25%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.10%
Tower 235%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises25%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.10%
Tower 335%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises25%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.10%
Tower 435%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises25%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.10%
Tower 535%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises25%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.10%

Progress on shared amenities15

As on 30 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed1199

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1,199
Closed/Covered1,199
BuildingClosed/CoveredTotal
Tower 1240240
Tower 2240240
Tower 3240240
Tower 4240240
Tower 5239239

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area7,534 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on18 Jul 2025
LandownerVillageDistrict
NAGPUR MUNICIPAL CORPORATIONNagpur (M Corp.)Nagpur

Approvals and building plan

Sanctioning authorityNagpur Municipal Corporation
Permissible FSI34113.61
Proposed, not sanctioned34,114 sq m
Buildings approved5
Buildings sanctioned5

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch199 Cement Road Shivaji Nagar Nagpur
Estimated costRs 145.00 cr
Cost incurredRs 79.75 cr
Work done55.0%
BuildingWingEstimatedIncurred
Tower 1NARs 29.00 crRs 15.95 cr
Tower 2NARs 29.00 crRs 15.95 cr
Tower 3NARs 29.00 crRs 15.95 cr
Tower 4NARs 29.00 crRs 15.95 cr
Tower 5NARs 29.00 crRs 15.95 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPranav Lakhotiya
EngineerSuresh Maraskolhe
EngineerRakesh Maraskolhe
Chartered AccountantCA NACHIKET DHANDEKAR
Chartered AccountantSuresh Kewalramani
Chartered AccountantShikha Kodwani
PartnerRole in project
PRAFULVED INFRA & PRAFUL DESHMUKH ASSOCIATES 5 LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 1 Apr 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 15 Feb 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 15 Feb 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 1 Apr 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 11 Jan 2031

Documents filed107

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 107 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2025-2026)File: Form 5_FY 2025-26.pdf30 May 2026
Withdrawal Update Form 1File: Form 1_Q4_25-26.pdf30 Apr 2026
Withdrawal Update Form 2File: Form 2_Q4_25-26.pdf30 Apr 2026
Withdrawal Update Form 3File: Form 3_Q4_25-26.pdf30 Apr 2026
Withdrawal Update Form 1File: Form 1_Q3_2025-26.pdf22 Jan 2026
Withdrawal Update Form 2File: Form 2_Q3_2025-26.pdf22 Jan 2026
Withdrawal Update Form 3File: Form 3_Q3_2025-26.pdf22 Jan 2026
Form 2A (FY 2025-2026)File: Form 2A_FY 2025-26.pdf9 Jan 2026
Form 2A (FY 2024-2025)File: Form 2A_FY_2024-25.pdf8 Jan 2026
Form 1File: Form 1_Q1_2024-25.pdf26 Dec 2025
Form 2File: Form 2_Q1_2024-25.pdf26 Dec 2025
Form 3File: Form 3_Q1_2024-25.pdf26 Dec 2025
Disclosure of Sold and Booked InventoryFile: Disc of Inventory_Q1_2024-25.pdf26 Dec 2025
Form 1File: Form 1_Q2_2024-25.pdf26 Dec 2025
Form 2File: Form 2_Q2_FY_2024-25.pdf26 Dec 2025
Form 3File: Form 3_Q2_FY 2024-25.pdf26 Dec 2025
Disclosure of Sold and Booked InventoryFile: Disc of Inventory_Q2_2024-25.pdf26 Dec 2025
Form 1File: Form 1_Q3_2024-25.pdf26 Dec 2025
Form 2File: Form 2_Q3_2024-25.pdf26 Dec 2025
Form 3File: Form 3_Q3_FY 2024-25.pdf26 Dec 2025
Disclosure of Sold and Booked InventoryFile: Disc of Inventory_Q3_2024-25.pdf26 Dec 2025
Form 1File: Form 1_Q4_2024-25.pdf26 Dec 2025
Form 2File: Form 2_Q4_2024-25.pdf26 Dec 2025
Form 3File: Form 3_Q4_2024-25.pdf26 Dec 2025
Disclosure of Sold and Booked InventoryFile: Disc of Inventory_Q4_2024-25.pdf26 Dec 2025
Form 5 (FY 2024-2025)File: Form 5_FY 2025.pdf26 Dec 2025
Withdrawal Update Form 1File: Form 1_Q2_2025-26.pdf7 Nov 2025
Withdrawal Update Form 1File: Form 1_Q2_2025-26.pdf7 Nov 2025
Withdrawal Update Form 2File: Form 2_Q2_2025-26.pdf7 Nov 2025
Withdrawal Update Form 2File: Form 2_Q2_2025-26.pdf7 Nov 2025
Withdrawal Update Form 3File: Form 3_Q2_2025-26.pdf7 Nov 2025
Withdrawal Update Form 3File: Form 3_Q2_2025-26.pdf7 Nov 2025
Withdrawal Update Form 1File: Form 1_Q1_25-26.pdf9 Sep 2025
Withdrawal Update Form 2File: Form 2 Q1 25-26.pdf9 Sep 2025
Withdrawal Update Form 3File: Form 3_Q 1_25-26.pdf9 Sep 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Architect Certificate Sep-24.pdf26 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Architect Certificate Dec-24.pdf26 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1 Architect Certificate Mar-25.pdf26 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Architect Certificate June-24.pdf26 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 31122024.pdf26 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 30092024.pdf26 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 30062024.pdf26 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 31032025.pdf26 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sold Unsold 31122024.pdf26 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sold Unsold 30092024.pdf26 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sold unsold 30062024.pdf26 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer certificate 30062024.pdf26 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer certificate 30092024.pdf26 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer certificate 31122024.pdf26 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer certificate 31032025.pdf26 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold unsold 30062024.pdf26 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold 30092024.pdf26 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold 31122024.pdf26 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold 31032025.pdf26 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form-2A Engineer Certificate Mar-25.pdf26 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 2024-25.pdf26 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: VED OSCP 5 Form 3 22042024.pdf22 Apr 2024
Other - LegalFile: Form B Landowner Given by Nagpur Municipal Corporation POA N A.pdf9 Apr 2024
Copy of the legal title reportFile: Corrected Search Report Update.pdf1 Apr 2024
Commencement Certificates / NA Order for plotted developmentFile: 7 Corrected Permit CC.pdf1 Apr 2024
Other - LegalFile: Corrected Agreement of Development with Stamp Duty - compressed.pdf1 Apr 2024
Layout approvalFile: plot 5 site plan sanction.pdf15 Feb 2024
Building plan approvalFile: plot 5 site plan sanction.pdf15 Feb 2024
Building plan approvalFile: 1 plot 5 B1.pdf15 Feb 2024
Building plan approvalFile: 2 plot 5 B2 B3.pdf15 Feb 2024
Building plan approvalFile: 3 plot 5 ground floor.pdf15 Feb 2024
Building plan approvalFile: 4 plot 5 1st floor plan.pdf15 Feb 2024
Building plan approvalFile: 5 plot 5 2nd floor plan Highlighted.pdf15 Feb 2024
Building plan approvalFile: 6 plot 5 3rd floor.pdf15 Feb 2024
Building plan approvalFile: 7 plot 5 ty4-5-6-8-9pical floor plan.pdf15 Feb 2024
Building plan approvalFile: 8 plot 5 7th floor plan.pdf15 Feb 2024
Building plan approvalFile: 9 plot 5 10th floor plan.pdf15 Feb 2024
Building plan approvalFile: 10 plot 5 11th floor plan.pdf15 Feb 2024
Building plan approvalFile: 11 plot 5 Elevation plan.pdf15 Feb 2024
Building plan approvalFile: 12 plot 5 section plan.pdf15 Feb 2024
Copy of Layout Approval (in case of layout)File: plot 5 site plan sanction.pdf15 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: plot 5 site plan sanction.pdf15 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: 1 plot 5 B1.pdf15 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: 2 plot 5 B2 B3.pdf15 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: 3 plot 5 ground floor.pdf15 Feb 2024

How this compares with Nagpur

80%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one has not
22%of Nagpur registrations have lapsed or been cancelledthis one is on the register

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep VED OCSP 5 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KHAMLA NAGPUR2,800+ in Nagpur

2 kmVED OCSP 5Completed 33Lapsed / revoked 13Other 52Dot size: filed unitsN

Filed coordinates, straight-line distance. 98 registered projects within 2 km.

Builder: PRAFULVED INFRA & PRAFUL DESHMUKH ASSOCIATES 5 LLP

PRAFULVED INFRA & PRAFUL DESHMUKH ASSOCIATES 5 LLP has 1 registration on MahaRERA, including VED OCSP 5. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if VED OCSP 5 is delayed beyond 11 Jan 2031?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VED OCSP 5?

The registered promoter entity is PRAFULVED INFRA & PRAFUL DESHMUKH ASSOCIATES 5 LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VED OCSP 5?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for VED OCSP 5?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VED OCSP 5?

The professionals named in the filing: Architect: Pranav Lakhotiya; Engineer: Suresh Maraskolhe; Engineer: Rakesh Maraskolhe; Chartered Accountant: CA NACHIKET DHANDEKAR; Chartered Accountant: Suresh Kewalramani; Chartered Accountant: Shikha Kodwani. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VED OCSP 5?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VED OCSP 5. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VED OCSP 5 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.