Registered No litigation declared Residential / Group Housing project

Rachana Ekaa-2

By Rachana construction Co. (Nagpur) Pvt. Ltd.

RG-MH-97380 · RERA P50500055492 · Last updated on MahaRERA portal: 17 Jul 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 6 other registrations.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
10 of 22Construction stages doneacross 2 buildings; furthest along: Internal walls, 90%
10 of 84Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 89 documents Report an error

Rachana Ekaa-2 is a Residential / Group Housing project by Rachana construction Co. (Nagpur) Pvt. Ltd. in Nagpur, Maharashtra, registered with MahaRERA as P50500055492 on 2 Apr 2024. Possession is promised by 31 Dec 2026. 74 of the 84 units on this registration are recorded sold or booked, and 10 of 22 construction stages are filed complete.

At a glance

Project

  • NameRachana Ekaa-2
  • TypeResidential / Group Housing
  • Location
    • KH.NO.144/2/2
    • C.T.S. No. 514
    • Plot No. 4A2
    • Mouza Chinchbhuvan
    • Nagpur: - 440025
    • Nagpur
    • Nagpur (M Corp.)
    • Nagpur (Urban)
    • 440025
  • Pincode440025
  • RERA no.P50500055492
  • ReraGenie IDRG-MH-97380

Builder

  • NameRachana construction Co. (Nagpur) Pvt. Ltd.
  • Entity typeCompany
  • CINU45201MH2001PTC131790
  • GSTIN27AACCR1666C1ZL
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • Managing DirectorShishir Shanakarrao Diote
  • DirectorsRonak Shishir Diote, Nilima Shishir Diote
  • Other registrations6 more →
  • Completed5 of 7
  • Declared earlier projects3 →

Key dates

this monthRegisteredApr 2024PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on2 Apr 2024
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings2 building records
  • Documents filed89 files

Current status

88%74 of 84 units booked
75.4%Work done, per cost certificate

Figures as on 17 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A wingNA8842042
B WingNA8842042

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 17 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 90%.

A wing75%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%
B Wing75%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%

Progress on shared amenities15

As on 17 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed174

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots174
Closed/Covered41
Open Space133
BuildingClosed/CoveredOpen SpaceTotal
A wing206686
B Wing216788

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,278 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on25 Jun 2025

Approvals and building plan

Sanctioning authorityNagpur Municipal Corporation
Permissible FSI7264.4
Proposed, not sanctioned7,264 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch73,CENTRAL AVENUE FLOOR,GANDHI BAGH,NAGPUR,PIN 440018
Estimated costRs 26.05 cr
Cost incurredRs 19.65 cr
Work done75.42%
BuildingWingEstimatedIncurred
A wingNARs 11.77 crRs 8.75 cr
B WingNARs 11.77 crRs 8.75 cr
-NARs 2.51 crRs 2.15 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectULHAS MUDE and ASSOCIATES ulhas mude
EngineerPranil Kachole
EngineerVinay Kulkarni
Chartered AccountantShirish Bhagat and Company
Chartered AccountantUrja Shekhar Jain
Chartered AccountantHimesh Narayan Demble
PartnerRole in project
Rachana construction Co. (Nagpur) Pvt. Ltd.-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 9 Mar 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 9 Mar 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 9 Mar 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 9 Mar 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed89

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 89 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Architect Ekaa 2 June 2026.pdf17 Jul 2026
Withdrawal Update Form 2File: Engineer Ekaa 2 June 2026.pdf17 Jul 2026
Withdrawal Update Form 3File: CA Ekaa 2 June 26.pdf17 Jul 2026
Withdrawal Update Form 1File: EKAA2 Architect March 2026.pdf16 Apr 2026
Withdrawal Update Form 2File: Ekaa 2 Engg March 2026.pdf16 Apr 2026
Withdrawal Update Form 3File: EKAA 2 CA March 2026.pdf16 Apr 2026
Withdrawal Update Form 1File: Ekaa-2 Architect Dec 2025.pdf13 Jan 2026
Withdrawal Update Form 2File: Ekaa 2 Engineers Dec 2025.pdf13 Jan 2026
Withdrawal Update Form 3File: Ekaa-2 CA Dec 2025.pdf13 Jan 2026
Withdrawal Update Form 1File: Ekaa2 Architecture Certificate Sep 2025.pdf10 Oct 2025
Withdrawal Update Form 1File: Ekaa2 Architecture Certificate Sep 2025.pdf10 Oct 2025
Withdrawal Update Form 1File: Ekaa 2 Architect Sep 2025.pdf10 Oct 2025
Withdrawal Update Form 2File: EKAA 2 Engineer Certificate Sep 2025.pdf10 Oct 2025
Withdrawal Update Form 2File: EKAA 2 Engineer Certificate Sep 2025.pdf10 Oct 2025
Withdrawal Update Form 2File: Ekaa 2 Engineer Sep 2025.pdf10 Oct 2025
Withdrawal Update Form 3File: EKAA2 CA Certificate Sep 2025.pdf10 Oct 2025
Withdrawal Update Form 3File: EKAA2 CA Certificate Sep 2025.pdf10 Oct 2025
Withdrawal Update Form 3File: Ekaa 2 CA Sep 2025.pdf10 Oct 2025
Form 2A (FY 2024-2025)File: EKAA 2 Form 2A anually Sep 2025.pdf30 Sep 2025
Form 5 (FY 2024-2025)File: Ekaa 2 Form 5 CA anual Sep 2025.pdf30 Sep 2025
Withdrawal Update Form 1File: Architect Ekaa 2 June 2025.pdf31 Jul 2025
Withdrawal Update Form 2File: Engineer Ekaa 2 June 2025.pdf31 Jul 2025
Withdrawal Update Form 3File: CA Ekaa 2 Form 3 June 2025_compressed.pdf31 Jul 2025
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Applicaiton from Builder.pdf3 May 2025
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration cum undertaking for Bank Account Change.pdf3 May 2025
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A (2) from Builder.pdf3 May 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B (2) Bank Letter.pdf3 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Ekaa 2 March 25.pdf11 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Ekaa 2 March 2025.pdf11 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer EKaa 2 March 25.pdf11 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold unsold Ekaa 2 March 25.pdf11 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Quality Ekaa 2 March 25.pdf11 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA EKAA 2 Dec 2024 final.pdf11 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Ekaa 2 Dec 2024 final.pdf11 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Ekaa 2 Dec 2024.pdf10 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Ekaa 2 Dec 2024.pdf9 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA EKAA 2.pdf9 Jan 2025
Disclosure of sold/ booked inventoryFile: EKAA 2 sold unsold Dec 2024.pdf9 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: quality EKaa 2 Dec 2024.pdf9 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf30 Dec 2024
Disclosure of sold/ booked inventoryFile: RAchana Ekaa 2 sold unsold sep 2024.pdf22 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: EKAA-2 Architect Certificate September 2024.pdf19 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: EKAA 2 CA Sep 24.pdf19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 EKAA 2 Engineer Sep 24.pdf19 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Ekaa 2 quality Sep 24.pdf19 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ekaa 2 Architect Certificate June 2024.pdf6 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Ekaa 2 Form 2 Engineer certificate June 2024.pdf6 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: EKAA 2 Form 2 A Quality Assurance June 2024.pdf6 Jul 2024
Disclosure of sold/ booked inventoryFile: EKAA 2 Sold Unsold Inventory June 2024.pdf6 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: EKAA 2 CA CERTIFICATE June 2024.pdf6 Jul 2024
Proforma of Agreement for saleFile: Revised ATS EKAA II.pdf12 Apr 2024
CERSAI detailsFile: Undertaking PDF (2) (1).pdf18 Mar 2024
Other - TechnicalFile: Annexure A PDF.pdf16 Mar 2024
Other - TechnicalFile: CC mail (5).pdf14 Mar 2024
Proforma of Agreement for saleFile: Clean ATS EKAA II for uploading.pdf12 Mar 2024
Deviation Report with respect to model copy of AgreementFile: deviation report rachana ekaa 2 (1)_compressed.pdf12 Mar 2024
Layout approvalFile: 1 Copy of Layout Approval (in case of layout) (4).pdf9 Mar 2024
Building plan approvalFile: 1 Building Plan Approval _ NA Order for plotted development.pdf9 Mar 2024
Building plan approvalFile: 2 Building Plan Approval _ NA Order for plotted development (1).pdf9 Mar 2024
Building plan approvalFile: 3 Building Plan Approval _ NA Order for plotted development.pdf9 Mar 2024
Building plan approvalFile: 4 Building Plan Approval _ NA Order for plotted development (1).pdf9 Mar 2024
Building plan approvalFile: 5 Building Plan Approval _ NA Order for plotted development.pdf9 Mar 2024
Building plan approvalFile: 6 Building Plan Approval _ NA Order for plotted development.pdf9 Mar 2024
Building plan approvalFile: 6 Building Plan Approval _ NA Order for plotted development.pdf9 Mar 2024
Building plan approvalFile: 8 Building Plan Approval _ NA Order for plotted development.pdf9 Mar 2024
PAN CardFile: pan card rachana constructions co pvt ltd.pdf9 Mar 2024
Copy of the legal title reportFile: 1 Copy of the legal title report (8).pdf9 Mar 2024
Details of encumbrances concerned to FinanceFile: 1 a Details of encumbrances concerned to Finance (35) (1).pdf9 Mar 2024
Details of encumbrances concerned to LegalFile: 1 a Details of encumbrances concerned to Finance (35) (1).pdf9 Mar 2024
Copy of Layout Approval (in case of layout)File: 1 Copy of Layout Approval (in case of layout) (4).pdf9 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: 1 Building Plan Approval _ NA Order for plotted development.pdf9 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: 2 Building Plan Approval _ NA Order for plotted development (1).pdf9 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: 3 Building Plan Approval _ NA Order for plotted development.pdf9 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: 4 Building Plan Approval _ NA Order for plotted development (1).pdf9 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: 5 Building Plan Approval _ NA Order for plotted development.pdf9 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: 6 Building Plan Approval _ NA Order for plotted development.pdf9 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: 6 Building Plan Approval _ NA Order for plotted development.pdf9 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: 8 Building Plan Approval _ NA Order for plotted development.pdf9 Mar 2024
Commencement Certificates / NA Order for plotted developmentFile: 1 Commencement Certificates _ NA Order for plotted development (3).pdf9 Mar 2024
Declaration about Commencement CertificateFile: 1 Declaration about Commencement Certificate (19).pdf9 Mar 2024

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise2 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Rachana NityaRachana Nitya mouza bhamti landon street road nagpur 44002246CompletedSep 2017Jun 2017
Rachana MeghsparshRachana Meghsparsh mouza bhamti london street road Nagpur 440022146CompletedMar 2016Late, Apr 2016
Rachana Madhukosh BRachana Madhukosh Apartment Plot no 1 to 5 Patil Layout Indraprastha nagar Jaitala Road nagpur 44002224CompletedMay 2014Late, Jun 2014

How this compares with Nagpur

88%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one has not
22%of Nagpur registrations have lapsed or been cancelledthis one is on the register

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Rachana Ekaa-2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Nagpur2,800+ in Nagpur

Builder: Rachana construction Co. (Nagpur) Pvt. Ltd.

Rachana construction Co. (Nagpur) Pvt. Ltd. has 7 registrations on MahaRERA, including Rachana 24 Carat and Rachana Sahira Wing A. Its filings disclose 3 earlier MahaRERA projects: declares 1 of 3 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if Rachana Ekaa-2 is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Rachana Ekaa-2?

The registered promoter entity is Rachana construction Co. (Nagpur) Pvt. Ltd., a company as per the filing. Its CIN U45201MH2001PTC131790 and GSTIN 27AACCR1666C1ZL can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Rachana Ekaa-2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Rachana Ekaa-2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Rachana Ekaa-2?

The professionals named in the filing: Architect: ULHAS MUDE and ASSOCIATES ulhas mude; Engineer: Pranil Kachole; Engineer: Vinay Kulkarni; Chartered Accountant: Shirish Bhagat and Company; Chartered Accountant: Urja Shekhar Jain; Chartered Accountant: Himesh Narayan Demble. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Rachana Ekaa-2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Rachana Ekaa-2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Rachana Ekaa-2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.