Registered No litigation declared Residential / Group Housing project

VEDANG LAKE CITY

By VEDANG CONSTRUCTION

RG-MH-72140 · RERA P51700049598 · Last updated on MahaRERA portal: 27 Jun 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 36 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedmoved 36 months from the original
16 of 33Construction stages doneacross 3 buildings; furthest along: Sanitary Fittings within the flats /..., 95%
140 of 251Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 94 documents Report an error

VEDANG LAKE CITY is a Residential / Group Housing project by VEDANG CONSTRUCTION in Thane, Maharashtra, registered with MahaRERA as P51700049598 on 15 Feb 2023. Possession is promised by 31 Dec 2028. The completion date has moved by 36 months from the original filing. 111 of the 251 units on this registration are recorded sold or booked, and 16 of 33 construction stages are filed complete.

At a glance

Project

  • NameVEDANG LAKE CITY
  • TypeResidential / Group Housing
  • Location
    • Nr. Arya Gurukul School
    • Nr. RTO Office
    • nandivli tarfe ambarnath
    • Kalyan
    • Thane
    • 421306
  • Pincode421306
  • RERA no.P51700049598
  • ReraGenie IDRG-MH-72140

Builder

  • NameVEDANG CONSTRUCTION
  • Entity typePartnership
  • PartnersHUKMARAM RUGARAMJI DEVASHI, GURUNATH PANDURANG MHATRE

Key dates

this monthRegisteredFeb 2023First promiseDec 2025Revised toDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on15 Feb 2023
  • Promised completion31 Dec 2028
  • Revised completionRevised to 31 Dec 2028 (originally 31 Dec 2025)
  • Buildings3 building records
  • Documents filed94 files

Current status

44%111 of 251 units booked
64.4%Work done, per cost certificate

Figures as on 27 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
VEDANG LAKE CITY VED-1NA9756056
VEDANG LAKE CITY VED-2NA141363063
VEDANG LAKE CITY VED-3NA23221320132

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 27 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

16 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 95%.

VEDANG LAKE CITY VED-182%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
VEDANG LAKE CITY VED-280%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
VEDANG LAKE CITY VED-345%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor50%
Slabs of Super Structure60%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises55%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks70%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.10%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 27 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes50%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed47

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots47
Closed/Covered15
Open Space32
BuildingClosed/CoveredOpen SpaceTotal
VEDANG LAKE CITY VED-113233
VEDANG LAKE CITY VED-213013
VEDANG LAKE CITY VED-3101

Land and ownership13

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,430 sq m
Land owned byThe promoter, with other names on the file
Named landowners13
LandownerVillageDistrict
RAMDAS DINKAR DHONEKATEMANEVALIThane
ROHIDAS DINKAR DHONEnandivli tarfe ambarnathThane
RAJESH DINKAR DHONEnandivli tarfe ambarnathThane
NIRMALA DATTA NAIKnandivli tarfe ambarnathThane
RANJANA RAMESH DHONEnandivli tarfe ambarnathThane
ADESH RAMESH DHONE (MINOR)nandivli tarfe ambarnathThane
RHUTIKA RAMESH DHONE (MINOR)nandivli tarfe ambarnathThane
RIYA RAMESH DHONE (MINOR)nandivli tarfe ambarnathThane
KASTURI RAMESH DHONEnandivli tarfe ambarnathThane
ROSHNA MAHESH MAHULKARnandivli tarfe ambarnathThane
VIKAS DINESH KAVLEnandivli tarfe ambarnathThane
VISHALI MAHESH KOLInandivli tarfe ambarnathThane
SAVITA DINESH KAVLEnandivli tarfe ambarnathThane

Approvals and building plan

Sanctioning authorityKALYAN DOMBIVALI MUNICIPAL CORPORATION
Permissible FSI15436.54
Proposed, not sanctioned15,437 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShop 1-7Sarswati Building, Santoshi Mata Road, Rambaug, Kalyan West
Estimated costRs 50.55 cr
Cost incurredRs 32.56 cr
Work done64.4%
BuildingWingEstimatedIncurred
VEDANG LAKE CITY VED-3NARs 28.00 crRs 11.20 cr
VEDANG LAKE CITY VED-2NARs 11.52 crRs 10.60 cr
VEDANG LAKE CITY VED-1NARs 10.50 crRs 10.50 cr
-NARs 53.50 lakhRs 25.75 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectNIKHIL BORADE
EngineerJ N CHAUDHARI
Chartered AccountantCHANDRAKANT BHOIR
Chartered AccountantKranti Chandrakant bhoir
PartnerRole in project
VEDANG CONSTRUCTION-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA20112518390Dec 2025 → Dec 2028

Reason as filed by the promoterRespected Sir, We, the partners of M/s. Vedang Construction, the Promoter of the project “VEDANG LAKE CITY”, humbly submit this request for extension of the project registration. The project was registered with MahaRERA vide Application No. P51700049598. Sir, we had originally obtained the Commencement Certificate for this project from Kalyan Dombivali Municipal Corporation (KDMC) on 07th December 2022, bearing CC No. KDMC/TPD/BP/27village/2022-23/21. Under this approval, the following buildings were sanctioned: 1. Building No. 01 - Stilt + 07 Floors (Named as Vedang Lake City VED-1 in project

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 14 Jan 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 11 Jun 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 14 Jan 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 11 Jun 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed94

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 94 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: ARCHITECT CERTIFICATE.pdf27 Jun 2026
Withdrawal Update Form 2File: Eengin Form 2 Marc 26.pdf27 Jun 2026
Withdrawal Update Form 3File: Vedang Form 3 March 2026_11zon.pdf27 Jun 2026
Form 2A (FY 2024-2025)File: Form 2A Vedang 2025_11zon.pdf10 Feb 2026
Form 5 (FY 2024-2025)File: Form 5 Ved 2025_11zon (1).pdf5 Feb 2026
Withdrawal Update Form 1File: Form 1 Dec 25.pdf3 Feb 2026
Withdrawal Update Form 2File: FORM 2 DEC 25.pdf3 Feb 2026
Withdrawal Update Form 3File: Adobe Scan 3 Feb 2026 (1)_11zon.pdf3 Feb 2026
Form 1File: F-1 VEd Mar 2025.pdf20 Nov 2025
Form 2File: F-2 Ved Mar 2025.pdf20 Nov 2025
Form 3File: F-3 VEd Mar 2025_11zon.pdf20 Nov 2025
Disclosure of Sold and Booked InventoryFile: F-3 VEd Mar 2025_11zon.pdf20 Nov 2025
Withdrawal Update Form 1File: F-1 VEd June 2025.pdf20 Nov 2025
Withdrawal Update Form 1File: Rera Letter (1).pdf20 Nov 2025
Withdrawal Update Form 2File: June 2025 Vedanga F2.pdf20 Nov 2025
Withdrawal Update Form 2File: F2-vED sEP 2025.pdf20 Nov 2025
Withdrawal Update Form 3File: F3-june 2025_11zon.pdf20 Nov 2025
Withdrawal Update Form 3File: fORM 3 SEP 2025 VC_11zon.pdf20 Nov 2025
Form 1File: 7 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf18 Nov 2025
Form 2File: 6 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf18 Nov 2025
Form 3File: Form 3 Vedang Dec 24.pdf18 Nov 2025
Disclosure of Sold and Booked InventoryFile: Form 3 Vedang Dec 24.pdf18 Nov 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: vedang coustruction DEC.pdf15 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Adobe Scan 26 Feb 2025 (1)_11zon.pdf15 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: VEDANG CONSTRUCTUION (30-12-2024).pdf15 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architecht_11zon.pdf14 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q1_11zon.pdf14 Jul 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold.pdf14 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form - 3.pdf14 Jul 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 vedang_11zon.pdf12 Jun 2024
Layout approvalFile: Plan Layout (1).pdf11 Jun 2024
Layout approvalFile: Plan Layout (1).pdf11 Jun 2024
Copy of Layout Approval (in case of layout)File: Plan Layout (1).pdf11 Jun 2024
Copy of Layout Approval (in case of layout)File: Plan Layout (1).pdf11 Jun 2024
Commencement Certificates / NA Order for plotted developmentFile: Commencement (1).pdf11 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect.pdf13 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineer.pdf13 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Vedang.pdf13 May 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Ved 31-03.pdf13 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf13 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architechr Certificate_11zon.pdf17 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 VEDANG_11zon.pdf17 Feb 2024
Layout approvalFile: BLUE PRINT 3 (1)_11zon.pdf19 Jan 2024
Layout approvalFile: BLUE PRINT 2 (1)_11zon.pdf19 Jan 2024
Layout approvalFile: BLUE PRINT 1 (1)_11zon (1).pdf19 Jan 2024
Copy of Layout Approval (in case of layout)File: BLUE PRINT 3 (1)_11zon.pdf19 Jan 2024
Copy of Layout Approval (in case of layout)File: BLUE PRINT 2 (1)_11zon.pdf19 Jan 2024
Copy of Layout Approval (in case of layout)File: BLUE PRINT 1 (1)_11zon (1).pdf19 Jan 2024
Declaration about Commencement CertificateFile: Ved CC Declaration New_11zon.pdf19 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Adobe Scan 6 Jan 2024 (1).pdf19 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Vedang.pdf19 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM - 3 nEW_11zon.pdf19 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Vedang_11zon.pdf19 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Vedang_11zon (1).pdf19 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: FORM - 3 nEW_11zon.pdf6 Jan 2024
Layout approvalFile: BLUE PRINT 1_11zon.pdf4 Dec 2023
Layout approvalFile: BLUE PRINT 2_11zon.pdf4 Dec 2023
Layout approvalFile: BLUE PRINT 3_11zon.pdf4 Dec 2023
Copy of Layout Approval (in case of layout)File: BLUE PRINT 1_11zon.pdf4 Dec 2023
Copy of Layout Approval (in case of layout)File: BLUE PRINT 2_11zon.pdf4 Dec 2023
Copy of Layout Approval (in case of layout)File: BLUE PRINT 3_11zon.pdf4 Dec 2023
Commencement Certificates / NA Order for plotted developmentFile: SKM_C30823110214470_11zon.pdf4 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engin Cert.pdf4 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECHT.pdf5 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Ref_77_95_900_ R-1_2023_VEDANG CONSTRUCTUION TIWARI NF_(21-06-2022) (1).pdf5 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 New_11zon.pdf5 Sep 2023
Other - TechnicalFile: FORM D Declaration CC.pdf6 Feb 2023
Other - TechnicalFile: Decalration BUilding.pdf31 Jan 2023
Layout approvalFile: HPSC0097_11zon.pdf14 Jan 2023
Layout approvalFile: HPSC0099 eNHANCED.pdf14 Jan 2023
Building plan approvalFile: CC.pdf14 Jan 2023
PAN CardFile: pan Vedang.pdf14 Jan 2023
Copy of the legal title reportFile: Legal Titles Report 1.pdf14 Jan 2023
Copy of the legal title reportFile: Legal Titles Report 2_11zon.pdf14 Jan 2023
Details of encumbrances concerned to FinanceFile: fINANCE ENCUMBRANCE.pdf14 Jan 2023
Details of encumbrances concerned to FinanceFile: LEGAL ENCUMBRANCE.pdf14 Jan 2023
Details of encumbrances concerned to LegalFile: fINANCE ENCUMBRANCE.pdf14 Jan 2023
Details of encumbrances concerned to LegalFile: LEGAL ENCUMBRANCE.pdf14 Jan 2023
Copy of Layout Approval (in case of layout)File: HPSC0097_11zon.pdf14 Jan 2023
Copy of Layout Approval (in case of layout)File: HPSC0099 eNHANCED.pdf14 Jan 2023

How this compares with Thane

44%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 36 months
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep VEDANG LAKE CITY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Nr. RTO Office7,600+ in Thane

Builder: VEDANG CONSTRUCTION

VEDANG CONSTRUCTION has 1 registration on MahaRERA, including VEDANG LAKE CITY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if VEDANG LAKE CITY is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VEDANG LAKE CITY?

The registered promoter entity is VEDANG CONSTRUCTION, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VEDANG LAKE CITY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for VEDANG LAKE CITY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VEDANG LAKE CITY?

The professionals named in the filing: Architect: NIKHIL BORADE; Engineer: J N CHAUDHARI; Chartered Accountant: CHANDRAKANT BHOIR; Chartered Accountant: Kranti Chandrakant bhoir. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VEDANG LAKE CITY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VEDANG LAKE CITY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VEDANG LAKE CITY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.