Home / Browse projects / Mumbai Suburban, Maharashtra / Veda

Registration lapsed No litigation declared Others project

Veda

By Srujan Development and Construction Division

RG-MH-10454 · RERA P51800002383 · Last updated on MahaRERA portal: 21 May 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 22 months past the filed date
  • 3 complaints at MahaRERA
  • Completion date moved by 42 months
  • 4 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2024Possession promised22 months past this date
11 of 11Construction stages doneevery applicable stage filed complete
3Complaints at MahaRERAon this registration
Jump to the 100 documents Report an error

Veda is a Others project by Srujan Development and Construction Division in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800002383 on 31 Jul 2017. Possession was promised by 31 Dec 2024 and is now 22 months past that date. The completion date has moved by 42 months from the original filing. 3 complaints are on record with the regulator.

At a glance

Project

  • NameVeda
  • TypeOthers
  • Location
    • Azad Road
    • Gundavli Andheri East
    • Andheri
    • Mumbai Suburban
    • 400069
  • Pincode400069
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800002383
  • ReraGenie IDRG-MH-10454

Builder

  • NameSrujan Development and Construction Division
  • Entity typeOthers
  • Named personUnmesh Diwarkar Raote

Key dates

22 months past promisethis monthRegisteredJul 2017First promiseJun 2021Revised toDec 2024

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on31 Jul 2017
  • Promised completion31 Dec 2024
  • Revised completionRevised to 31 Dec 2024 (originally 30 Jun 2021)
  • Buildings1 building record
  • Documents filed100 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
VedaNA210000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 21 May 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

Veda: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities16

As on 21 May 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable
Swimming Pool and GymnasiumYes0%

Parking filed192

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots192
Closed/Covered192

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area5,413 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Shiv Shivam Developers Private LimitedAndheriMumbai Suburban

Approvals and building plan

Permissible FSI17825.0
Proposed, not sanctioned8,812 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchB N AGRAWAL MARKET, SHYAMKAMAL TRADE CENTRE, VILE PARLE EAST, MUMBAI - 400057

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectUmesh Enterprise Pvt Ltd
EngineerIntegrated Building Services
PartnerRole in project
Srujan Development and Construction Division-

Extensions applied for4

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800013375Jun 2021 → Jun 2023

Reason as filed by the promoterDUE TO COVID-19 AND PERMISSION DELAY THE PROJECT WAS NOT ABLE TO GET COMPLETED ON TIME. WE WOULD LIKE TO REQUEST YOU TO FURTHER GRANT US EXTENSION TILL 30/06/2023 Building work is completed but Fire OC is pending due to installation of alternative meter which is pending due to pending Road digging permission from BMC since 4-5 month Therefore we could not make application for occupation Certificate.

EXT51800009733Jun 2021 → Jun 2022

Reason as filed by the promoterDUE TO COVID-19 AND PERMISSION DELAY THE PROJECT WAS NOT ABLE TO GET COMPLETED ON TIME. WE WOULD LIKE TO REQUEST YOU TO FURTHER GRANT US EXTENSION FOR 12 MONTHS

EXT51800017143Jun 2021 → Dec 2023

Reason as filed by the promoterDUE TO COVID-19 AND PERMISSION DELAY THE PROJECT WAS NOT ABLE TO GET COMPLETED ON TIME. WE WOULD LIKE TO REQUEST YOU TO FURTHER GRANT US EXTENSION TILL 31/12/2023

EXT51800018224Jun 2021 → Dec 2024

Reason as filed by the promoterWE HAVE UPLOADED MAHARERA CHAIRPERSON ORDER VIDE CASE NO.79 of 2023 dated 23.11.2023 which grant extension to our Project RERA Registration from 01.07.2023 to 31.12.2024

Complaints filed with MahaRERA3

Case no.ComplainantRespondentFiled
CC006000000141193MAHESH GOSAMISRUJAN DEVELOPMENT & CONSTRUCTION DIVISION07/10/2019
CC006000000196679Jinesh Mahendra DaveShiv Shivam Developers13/04/2021
CC006000000398096AKSHAY SUNIL MAYEKARShiv Shivam Developers Private Ltd12/11/2023

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 19 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 13 Jun 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 May 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 20 May 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 7 Feb 2025

Documents filed100

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 100 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: architect form 1.pdf21 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: sep 23.pdf8 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: dec 23.pdf8 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: march 24.pdf8 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: june 24.pdf8 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: sep 24.pdf8 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: dec 224.pdf8 Apr 2025
Certificates of CA (Form 3)File: form 3 dec 24.pdf4 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: form 2A 22-23.pdf26 Mar 2025
Declaration in FORM BFile: form b 500 rupees.pdf20 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A 23-24.pdf20 Mar 2025
Certificates of CA (Form 3)File: 2023-24 4th qtr (1).pdf20 Feb 2025
Certificates of CA (Form 3)File: apr to june 24.pdf20 Feb 2025
Certificates of CA (Form 3)File: july to sep 24.pdf20 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1 march 24.pdf12 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1 june 24.pdf12 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1 sep 24.pdf12 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1 dec 24.pdf12 Feb 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: VEDA - OC upto 10th Floor.pdf7 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: form 5 23-24.pdf7 Feb 2025
Certificates of CA (Form 3)File: form 3 sep 23.pdf4 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 01 23.pdf19 Aug 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 04 23.pdf19 Aug 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 06 23.pdf19 Aug 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5.pdf12 Aug 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect form 1.pdf9 Aug 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 Q3.pdf3 Aug 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 Q4.pdf3 Aug 2023
Declaration in FORM BFile: Form B.pdf26 Jul 2023
CERSAI detailsFile: cersai declaration.pdf17 Jul 2023
Declaration about Commencement CertificateFile: CC DECLARATION - 2022.pdf3 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A 19-20.pdf3 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A 20-21.pdf3 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A 21 -22.pdf3 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: form 5 18-19.pdf3 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: form 5 21-22.pdf3 Feb 2023
Disclosure of sold/ booked inventoryFile: inventory.pdf31 Jan 2023
Disclosure of sold/ booked inventoryFile: INVENTORIES march 2022.pdf13 Jan 2023
Disclosure of sold/ booked inventoryFile: INVENTORIES june 2022.pdf13 Jan 2023
Disclosure of sold/ booked inventoryFile: INVENTORIES september 2022.pdf13 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engineer form 2 april 2022.pdf12 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engineer form 2 july 2022.pdf12 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engineer form 2 october 2022.pdf12 Jan 2023
Certificates of CA (Form 3)File: Form-3 CA Certificate-VEDA.pdf12 Jan 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form - 1 VEDA jan to march.pdf7 Jan 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form-1 VEDA april to june.pdf7 Jan 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form - 1 VEDA july to september.pdf7 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: CA FORM 5 20-21.pdf16 Apr 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: CA FORM 5 19-20.pdf15 Apr 2022
Certificates of CA (Form 3)File: CA Cert March 2021.pdf1 Sep 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARC CERT JUNE 2019 New.pdf4 Aug 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Cert DEC 2019.pdf4 Aug 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARC CERT MARCH 2020.pdf4 Aug 2021
Certificates of CA (Form 3)File: JUNE 2020 CA Cert.pdf4 Aug 2021
Certificates of CA (Form 3)File: SEP 2020 CA Cert New.pdf4 Aug 2021
Certificates of CA (Form 3)File: DEC 2020 CA Cert New.pdf4 Aug 2021
Certificates of CA (Form 5)File: Srujan Const Form 5 CERT.pdf31 Jul 2019
Layout approvalFile: Veda 3 to 6 n 9th Floor.pdf13 Jun 2019
Layout approvalFile: Veda 10 to 13 floor plan.pdf13 Jun 2019
Copy of Layout Approval (in case of layout)File: Veda 3 to 6 n 9th Floor.pdf13 Jun 2019
Copy of Layout Approval (in case of layout)File: Veda 10 to 13 floor plan.pdf13 Jun 2019
Building plan approvalFile: Revised IOA VEDA.pdf24 May 2019
Layout approvalFile: Section Plan Veda.pdf24 May 2019
Copy of Layout Approval (in case of layout)File: Section Plan Veda.pdf24 May 2019
Building Plan Approval (IOD)File: Revised IOA VEDA.pdf24 May 2019
Commencement Certificates / NA Order for plotted developmentFile: VEDA New CC 2019.pdf20 May 2019
Details of encumbrancesFile: VEDA SBI Loan Doc.pdf26 Feb 2019
Commencement Certificates / NA Order for plotted developmentFile: VEDA CC Oct 2018.pdf25 Feb 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: VEDA ARCHITECT CERTIFICATE -DEC 2018 SHIV SHIVAM compressed.pdf25 Feb 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: VEDA Engineers_Certificate-DEC 2018-compressed.pdf25 Feb 2019
Certificates of CA (Form 3)File: VEDA CA CERTIFICATE DEC-2018-compressed.pdf25 Feb 2019
Proforma of Allotment letterFile: VEDA Draft-compressed (1).pdf20 Jul 2018
Commencement Certificates / NA Order for plotted developmentFile: veda CC (2).pdf27 Jul 2017
Declaration in FORM BFile: Veda 2-ilovepdf-compressed.pdf27 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Veda Rehab Eng Cert new-ilovepdf-compressed.pdf27 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Veda Sale Eng Cert New-ilovepdf-compressed.pdf27 Jul 2017
Certificates of CA (Form 3)File: VEDA CA new-ilovepdf-compressed.pdf27 Jul 2017
Layout approvalFile: DRG 6-V.pdf19 Jul 2017
Layout approvalFile: DRG 7 V.pdf19 Jul 2017
Layout approvalFile: DRG 8-V.pdf19 Jul 2017

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one moved by 42 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is among them

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Veda on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Gundavli Andheri East6,700+ in Mumbai Suburban

2 kmVedaCompleted 112Lapsed / revoked 58Other 77Dot size: filed unitsN

Filed coordinates, straight-line distance. 247 registered projects within 2 km.

Builder: Srujan Development and Construction Division

Srujan Development and Construction Division has 1 registration on MahaRERA, including Veda. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What does it mean that Veda shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Veda is delayed beyond 31 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Veda?

The registered promoter entity is Srujan Development and Construction Division, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Veda?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Veda?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Veda?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Veda?

The professionals named in the filing: Architect: Umesh Enterprise Pvt Ltd; Engineer: Integrated Building Services. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Veda?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Veda. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Veda to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.