Registered No litigation declared Others project

ATHARV AARADHYAM

By Atharv Infra LLP

RG-MH-05506 · RERA P51800052443 · Last updated on MahaRERA portal: 5 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 3 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 3 other registrations.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Apr 2028Possession promisedno revision filed
25 of 55Construction stages doneacross 5 buildings; furthest along: Internal walls, 85%
113 of 230Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 119 documents Report an error

ATHARV AARADHYAM is a Others project by Atharv Infra LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800052443 on 28 Aug 2023. Possession is promised by 30 Apr 2028. 117 of the 230 units on this registration are recorded sold or booked, and 25 of 55 construction stages are filed complete.

At a glance

Project

  • NameATHARV AARADHYAM
  • TypeOthers
  • Location
    • Chandrashekhar CHSL Swami Nityanand Marg
    • VILE PARLE EAST
    • Andheri
    • Mumbai Suburban
    • 400069
  • Pincode400069
  • RERA no.P51800052443
  • ReraGenie IDRG-MH-05506

Builder

  • NameAtharv Infra LLP
  • Entity typePartnership
  • PartnersShailesh Nagindas Shah, Sachin Harishchandra Gunjal
  • Other registrations3 more →
  • Completed2 of 4
  • Declared earlier projects4 →

Key dates

this monthRegisteredAug 2023PromisedApr 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on28 Aug 2023
  • Promised completion30 Apr 2028
  • Revised completionNone
  • Buildings5 building records
  • Documents filed119 files

Current status

51%117 of 230 units booked
78.6%Work done, per cost certificate

Figures as on 5 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
T1NA141237744
T2NA141246046
T3NA141247047
T5NA141247047
T4NA141246046

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building5

As on 5 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

25 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Internal walls, at 85%.

T174%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises85%
Sanitary Fittings within the flats / premises15%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks75%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.75%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.65%
T274%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises85%
Sanitary Fittings within the flats / premises15%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks75%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.75%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.65%
T374%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises85%
Sanitary Fittings within the flats / premises15%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks75%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.75%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.65%
T574%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises85%
Sanitary Fittings within the flats / premises15%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks75%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.75%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.65%
T474%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises85%
Sanitary Fittings within the flats / premises15%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks75%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.75%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.65%

Progress on shared amenities15

As on 5 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes75%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes80%
Storm Water DrainsYes80%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes75%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes80%
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed295

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots295
Closed/Covered295
BuildingClosed/CoveredTotal
T15959
T25959
T35959
T55959
T45959

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area5,997 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on27 Mar 2026
LandownerVillageDistrict
Chandrashekhar CHS. Ltd.GundavaliMumbai Suburban

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI19150.43
Proposed, not sanctioned19,150 sq m
Buildings approved5
Buildings sanctioned5

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNEHRU ROAD VILE PARLE EAST MUMBAI 57
Estimated costRs 116.55 cr
Cost incurredRs 91.57 cr
Work done78.57%
BuildingWingEstimatedIncurred
T1NARs 23.31 crRs 18.31 cr
T2NARs 23.31 crRs 18.31 cr
T3NARs 23.31 crRs 18.31 cr
T5NARs 23.31 crRs 18.31 cr
T4NARs 23.31 crRs 18.31 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
Architectthe desing studio
Architectthe design studio
EngineerShrikhande and Shrikhande
Chartered AccountantMr Amish H Shah & Associates
PartnerRole in project
Atharv Infra LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 3 Aug 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 Mar 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 28 Mar 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 10 Aug 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Apr 2028

Documents filed119

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 119 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form-1-31- 3-2026.pdf5 May 2026
Withdrawal Update Form 2File: Form-2-31-3-2026 (1).pdf5 May 2026
Withdrawal Update Form 3File: Form-3-31-3-2026 (1).pdf5 May 2026
Withdrawal Update Form 1File: FROM-1.pdf7 Apr 2026
Withdrawal Update Form 2File: Form-2-31-12-25-AA (1).pdf7 Apr 2026
Withdrawal Update Form 3File: Form 3 (1).pdf7 Apr 2026
Withdrawal Update Form 1File: Form 1 AA 31 10 25.pdf4 Apr 2026
Withdrawal Update Form 2File: Form 2-3-10-2025.pdf4 Apr 2026
Withdrawal Update Form 3File: Form 3 Atharv Aaradhyam 2-10-2025_11zon.pdf4 Apr 2026
Withdrawal Update Form 1File: Form-1-30-6-25.pdf3 Apr 2026
Withdrawal Update Form 2File: Form-2-30-6-25 (1).pdf3 Apr 2026
Withdrawal Update Form 3File: Form-3-30-06-2025_compressed.pdf3 Apr 2026
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1-31-3-25.pdf15 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3-31-3-25_compressed.pdf12 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2-31-3-25.pdf12 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form-2A-31-3-25.pdf12 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1-31-12-24 -AA.pdf21 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3-31-12-24.pdf18 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2- 31-12-24.pdf18 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3-30-9-24.pdf18 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2-30-9-24.pdf18 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form-5-30-9-24.pdf16 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AA-FORM-1.pdf10 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1-30-6-24.pdf19 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2-30-6-24.pdf19 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FROM-2A-30-6-24.pdf19 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: AA-FORM-3.pdf19 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1-31-3-24.pdf23 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2-31-3-24-AA.pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3-31-3-24-AA_compressed.pdf20 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Atharv Aradhyam Form 1 31122023.pdf30 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Aradhyam 31-12-2023.pdf30 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Aradhyam 31-12-2023_compressed (1).pdf30 Mar 2024
Layout approvalFile: Final IOD DRAWING -29-12-2023_1-5.pdf28 Mar 2024
Layout approvalFile: Final IOD DRAWING -29-12-2023_6-end.pdf28 Mar 2024
Copy of Layout Approval (in case of layout)File: Final IOD DRAWING -29-12-2023_1-5.pdf28 Mar 2024
Copy of Layout Approval (in case of layout)File: Final IOD DRAWING -29-12-2023_6-end.pdf28 Mar 2024
Building plan approvalFile: Final IOD CERTIFICATE- 29-12-2023.pdf27 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: Final IOD CERTIFICATE- 29-12-2023.pdf27 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form- 1-30-9-23.pdf3 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2-30-9-23.pdf3 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf3 Nov 2023
Declaration about Commencement CertificateFile: Decl-CC-21-8.pdf21 Aug 2023
Details of encumbrances concerned to FinanceFile: FIN-ENCUM-18-8.pdf18 Aug 2023
Details of encumbrances concerned to FinanceFile: LEGAL-ENCUM-18-8.pdf18 Aug 2023
Details of encumbrances concerned to LegalFile: FIN-ENCUM-18-8.pdf18 Aug 2023
Details of encumbrances concerned to LegalFile: LEGAL-ENCUM-18-8.pdf18 Aug 2023
Other - FinanceFile: NO SALE-DECL-18-8.pdf18 Aug 2023
Proforma of Agreement for saleFile: AFS -14-8-23.pdf14 Aug 2023
Deviation Report with respect to model copy of AgreementFile: Deviation report-14-8-23_compressed.pdf14 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: S22C-114062010420_compressed.pdf12 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: NO SALE-DECL-10-8.pdf11 Aug 2023
Other - TechnicalFile: Note Sheet of E E.pdf11 Aug 2023
Details of encumbrances concerned to FinanceFile: No encum.pdf10 Aug 2023
Details of encumbrances concerned to LegalFile: No encum.pdf10 Aug 2023
Commencement Certificates / NA Order for plotted developmentFile: Note Sheet of E E.pdf10 Aug 2023
Commencement Certificates / NA Order for plotted developmentFile: First CC.pdf10 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2 Aradhyam.pdf10 Aug 2023
CERSAI detailsFile: CERSAI_Search_Report_200277031213_For_Asset_Based_Search_10_08_2023_11_57_52_169.pdf10 Aug 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: SG.pdf5 Aug 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: SHAILESH SHAH-DIS-INT.pdf5 Aug 2023
Layout approvalFile: IOD Drawing -1.pdf4 Aug 2023
Layout approvalFile: IOD Drawing (23-01-2022)-2.pdf4 Aug 2023
Layout approvalFile: IOD Drawing (23-01-2022)-3.pdf4 Aug 2023
Layout approvalFile: IOD Drawing (23-01-2022)-4.pdf4 Aug 2023
Layout approvalFile: IOD Drawing (23-01-2022)-5.pdf4 Aug 2023
Layout approvalFile: IOD Drawing (23-01-2022)-6.pdf4 Aug 2023
Layout approvalFile: IOD Drawing (23-01-2022)-7.pdf4 Aug 2023
Layout approvalFile: IOD Drawing (23-01-2022)-8.pdf4 Aug 2023
Layout approvalFile: IOD Drawing (23-01-2022)-9.pdf4 Aug 2023
Layout approvalFile: IOD Drawing (23-01-2022)-10.pdf4 Aug 2023
Layout approvalFile: IOD Drawing (23-01-2022)-11.pdf4 Aug 2023
Layout approvalFile: IOD Drawing (23-01-2022)-12.pdf4 Aug 2023
Layout approvalFile: IOD Drawing (23-01-2022)-13.pdf4 Aug 2023
Layout approvalFile: IOD Drawing (23-01-2022)-14.pdf4 Aug 2023
Layout approvalFile: IOD Drawing (23-01-2022)-15.pdf4 Aug 2023
Layout approvalFile: IOD Drawing (23-01-2022)-16.pdf4 Aug 2023
Layout approvalFile: IOD Drawing (23-01-2022)-17.pdf4 Aug 2023
Layout approvalFile: IOD Drawing (23-01-2022)-18.pdf4 Aug 2023
Layout approvalFile: IOD Drawing (23-01-2022)-19.pdf4 Aug 2023

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 delivered on promise
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Atharv Navasamajp51800032316Final Plot No. 297 TPS II CTS No 1215 1216 1217 1218 1218/1 1218/2 1218/3 1220(part), Gujarat Society Road, Vile Parle East, Andheri, Andheri, Mumbai Suburban, 400057, MAHARASHTRA--CompletedDec 2026Apr 2024
ATHARVMURLIP51800032937VILE PARLE EAST, Mumbai Suburban-Feb 2022CompletedDec 2026Feb 2024
Atharv SaraswatiAtharv Saraswati Chittaranjan Road Vile Parle East Mumbai 400 05731-CompletedDec 2022Jan 2022

How this compares with Mumbai Suburban

51%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ATHARV AARADHYAM on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near VILE PARLE EAST6,700+ in Mumbai Suburban

Builder: Atharv Infra LLP

Atharv Infra LLP has 4 registrations on MahaRERA, including Atharv Navasamaj and ATHARVMURLI. Its filings disclose 4 earlier MahaRERA projects: declares 4 of 4 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if ATHARV AARADHYAM is delayed beyond 30 Apr 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ATHARV AARADHYAM?

The registered promoter entity is Atharv Infra LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ATHARV AARADHYAM?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ATHARV AARADHYAM?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ATHARV AARADHYAM?

The professionals named in the filing: Architect: the desing studio; Architect: the design studio; Engineer: Shrikhande and Shrikhande; Chartered Accountant: Mr Amish H Shah & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ATHARV AARADHYAM?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ATHARV AARADHYAM. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ATHARV AARADHYAM to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.