Home / Browse projects / Pune, Maharashtra / VCC VIARA

Registered No litigation declared Others project

VCC VIARA

By SHUBHAM PROPERTIES AND PROMOTERS

RG-MH-05662 · RERA P52100055989 · Last updated on MahaRERA portal: 18 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Apr 2027Possession promisedno revision filed
8 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 90%
178 of 458Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 119 documents Report an error

VCC VIARA is a Others project by SHUBHAM PROPERTIES AND PROMOTERS in Pune, Maharashtra, registered with MahaRERA as P52100055989 on 6 May 2024. Possession is promised by 30 Apr 2027. 280 of the 458 units on this registration are recorded sold or booked, and 8 of 22 construction stages are filed complete.

At a glance

Project

  • NameVCC VIARA
  • TypeOthers
  • Location
    • Survey no 16 hissa no 1 P
    • PUNAWALE
    • Mulshi
    • Pune
    • 411033
  • Pincode411033
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100055989
  • ReraGenie IDRG-MH-05662

Builder

  • NameSHUBHAM PROPERTIES AND PROMOTERS
  • Entity typePartnership
  • PartnersSohanlal Shankarlal Vishnoi, Sheela sohanlal vishnoi

Key dates

this monthRegisteredMay 2024PromisedApr 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on6 May 2024
  • Promised completion30 Apr 2027
  • Revised completionNone
  • Buildings2 building records
  • Documents filed119 files

Current status

61%280 of 458 units booked
40.2%Work done, per cost certificate

Figures as on 18 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A BuildingNA21172324236
B BuildingNA20162184222

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 18 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 90%.

A Building55%
ActivityProgress
Excavation100%
Basement (if any)60%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure90%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B Building36%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)100%
Plinth0%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 18 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed4

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots4
Closed/Covered4
BuildingClosed/CoveredTotal
A Building22
B Building22

Land and ownership3

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area7,550 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
Encumbrance on the landDeclared none
Declared on30 Jul 2025
LandownerVillageDistrict
Dattatray Maruti DhavalePune (M Corp.)Pune
SHOBHA DATTATRAY DHAVALEPune (M Corp.)Pune
Tushar Dttatray DhavalePune (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPimpri Chinchwad Municipal Corporation
Permissible FSI38461.15
Proposed, not sanctioned37,929 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSanghavi Nagar, DP Road, Pune 411007
Estimated costRs 96.15 cr
Cost incurredRs 38.62 cr
Work done40.17%
BuildingWingEstimatedIncurred
A BuildingNARs 57.89 crRs 23.50 cr
B BuildingNARs 32.48 crRs 15.12 cr
-NARs 5.79 cr-

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAnil Pawar and associates
EngineerGensys Lifespaces LLP
Chartered AccountantAmit A. somani
Chartered AccountantPatel & Sharma
Chartered AccountantASAK & Co
Chartered AccountantAgarwal Sarawgi and Associates
Chartered AccountantDipali Namdev Shelar
PartnerRole in project
SHUBHAM PROPERTIES AND PROMOTERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Apr 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 Jun 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Jun 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 27 Jun 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Apr 2027

Documents filed119

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 119 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Final.pdf18 Apr 2026
Withdrawal Update Form 2File: Form 2 Final.pdf18 Apr 2026
Withdrawal Update Form 3File: Form 3 Final.pdf18 Apr 2026
Withdrawal Update Form 1File: Form 1.pdf15 Apr 2026
Withdrawal Update Form 2File: Form 2.pdf15 Apr 2026
Withdrawal Update Form 3File: Form 3 Final.pdf15 Apr 2026
Withdrawal Update Form 1File: Form 1 - Viara Q2.pdf30 Oct 2025
Withdrawal Update Form 2File: Form 2 - Viara Q2.pdf30 Oct 2025
Withdrawal Update Form 3File: Form 3 - Viara Q2_Compressed.pdf30 Oct 2025
Form 5 (FY 2024-2025)File: Form 5 FY 2024-25 Viara signed.pdf30 Sep 2025
Form 1File: Form 1 - Viara.pdf21 Jul 2025
Form 2File: Viara Form-2 30-06-25.pdf21 Jul 2025
Form 3File: Form 3 - Viara.pdf21 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold - Viara.pdf21 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q4 Vantagio.pdf3 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q4 Viara.pdf3 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q4 Viara.pdf3 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q4 Viara.pdf3 May 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Q4 Viara.pdf3 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Viara Final_compressed.pdf24 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Viara.pdf23 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Viara.pdf23 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unsold Viara_compressed.pdf14 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 SPP.pdf26 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 SPP.pdf26 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 SPP.pdf26 Oct 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Viara.pdf26 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Final.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Final.pdf20 Jul 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Final Compress.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Final Compress.pdf20 Jul 2024
Layout approvalFile: MYSCAN_20240621_0001_rotated.pdf27 Jun 2024
Building plan approvalFile: MYSCAN_20240621_0002_rotated.pdf27 Jun 2024
Building plan approvalFile: MYSCAN_20240621_0003_rotated.pdf27 Jun 2024
Building plan approvalFile: MYSCAN_20240621_0004_rotated.pdf27 Jun 2024
Building plan approvalFile: MYSCAN_20240621_0005_rotated.pdf27 Jun 2024
Building plan approvalFile: MYSCAN_20240621_0006_rotated.pdf27 Jun 2024
Building plan approvalFile: MYSCAN_20240621_0007_rotated.pdf27 Jun 2024
Building plan approvalFile: MYSCAN_20240621_0008_rotated.pdf27 Jun 2024
Building plan approvalFile: MYSCAN_20240621_0009_rotated.pdf27 Jun 2024
Building plan approvalFile: MYSCAN_20240621_0010_rotated.pdf27 Jun 2024
Building plan approvalFile: MYSCAN_20240621_0011_rotated.pdf27 Jun 2024
Building plan approvalFile: MYSCAN_20240621_0012_rotated.pdf27 Jun 2024
Building plan approvalFile: MYSCAN_20240621_0013_rotated.pdf27 Jun 2024
Building plan approvalFile: MYSCAN_20240621_0014_rotated.pdf27 Jun 2024
Building plan approvalFile: MYSCAN_20240621_0015_rotated.pdf27 Jun 2024
Copy of Layout Approval (in case of layout)File: MYSCAN_20240621_0001_rotated.pdf27 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: MYSCAN_20240621_0002_rotated.pdf27 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: MYSCAN_20240621_0003_rotated.pdf27 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: MYSCAN_20240621_0004_rotated.pdf27 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: MYSCAN_20240621_0005_rotated.pdf27 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: MYSCAN_20240621_0006_rotated.pdf27 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: MYSCAN_20240621_0007_rotated.pdf27 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: MYSCAN_20240621_0008_rotated.pdf27 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: MYSCAN_20240621_0009_rotated.pdf27 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: MYSCAN_20240621_0010_rotated.pdf27 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: MYSCAN_20240621_0011_rotated.pdf27 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: MYSCAN_20240621_0012_rotated.pdf27 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: MYSCAN_20240621_0013_rotated.pdf27 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: MYSCAN_20240621_0014_rotated.pdf27 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: MYSCAN_20240621_0015_rotated.pdf27 Jun 2024
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate_compressed.pdf27 Jun 2024
Declaration about Commencement CertificateFile: DECLARATION CERT.pdf27 Jun 2024
Proforma of Agreement for saleFile: Agreement to Sale.pdf9 May 2024
Copy of the legal title reportFile: Search Title Final.pdf26 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf26 Apr 2024
Proforma of Agreement for saleFile: Agreement for Sale.pdf26 Apr 2024
Other - TechnicalFile: CC Verification.pdf26 Apr 2024
Other - TechnicalFile: Clarification Club House.pdf26 Apr 2024
Layout approvalFile: 1 Sanctioned Layout Highlighted.pdf12 Apr 2024
Building plan approvalFile: Building Plan-1.pdf12 Apr 2024
Building plan approvalFile: Building Plan-2.pdf12 Apr 2024
Building plan approvalFile: Building Plan-3.pdf12 Apr 2024
Building plan approvalFile: Building Plan-4.pdf12 Apr 2024
Building plan approvalFile: Building Plan-5.pdf12 Apr 2024
Building plan approvalFile: Building Plan-6.pdf12 Apr 2024
Building plan approvalFile: Building Plan-7.pdf12 Apr 2024
Building plan approvalFile: Building Plan-8.pdf12 Apr 2024
Building plan approvalFile: Building Plan-9.pdf12 Apr 2024
Building plan approvalFile: Building Plan-10.pdf12 Apr 2024

How this compares with Pune

61%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep VCC VIARA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PUNAWALE13,700+ in Pune

2 kmVCC VIARACompleted 92Lapsed / revoked 32Other 117Dot size: filed unitsN

Filed coordinates, straight-line distance. 241 registered projects within 2 km.

Builder: SHUBHAM PROPERTIES AND PROMOTERS

SHUBHAM PROPERTIES AND PROMOTERS has 1 registration on MahaRERA, including VCC VIARA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if VCC VIARA is delayed beyond 30 Apr 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VCC VIARA?

The registered promoter entity is SHUBHAM PROPERTIES AND PROMOTERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VCC VIARA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for VCC VIARA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VCC VIARA?

The professionals named in the filing: Architect: Anil Pawar and associates; Engineer: Gensys Lifespaces LLP; Chartered Accountant: Amit A. somani; Chartered Accountant: Patel & Sharma; Chartered Accountant: ASAK & Co; Chartered Accountant: Agarwal Sarawgi and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VCC VIARA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VCC VIARA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VCC VIARA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.