Home / Browse projects / Pune, Maharashtra / VAYJANATH
VAYJANATH
RG-MH-30958 · RERA P52100079292 · Last updated on MahaRERA portal: 9 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- All 1 earlier projects delivered on promise
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 35 other registrations.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
VAYJANATH is a Residential / Group Housing project by PANDIT JAVDEKAR ASSOCIATES in Pune, Maharashtra, registered with MahaRERA as P52100079292 on 25 Feb 2025. Possession is promised by 6 Dec 2027.
At a glance
Project
- NameVAYJANATH
- TypeResidential / Group Housing
- Location
- PARVATI
- Pune (M Corp.)
- Pune City
- Pune
- 411009
- Pincode411009
- RERA no.P52100079292
- ReraGenie IDRG-MH-30958
Builder
- NamePANDIT JAVDEKAR ASSOCIATES
- Entity typePartnership
- GSTIN27AAPFK0643Q1ZP
- PartnersSHIVKUMAR ARVIND JAVDEKAR, RAHUL ARUNKUMAR PANDIT, RAHUL ARUNKUMAR PANDIT, SUCHITRA SHIVKUMAR JAVDEKAR, RAHUL ARUNKUMAR PANDIT, SUCHITRA SHIVKUMAR JAVDEKAR, RAHUL ARUNKUMAR PANDIT, SUCHITRA SHIVKUMAR JAVDEKAR, RAHUL ARUNKUMAR PANDIT, SUCHITRA SHIVKUMAR JAVDEKAR
- Other registrations35 more →
- Completed24 of 36
- No longer live1 lapsed, de-registered or revoked
- Past their filed date1
- Declared earlier projects1 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on25 Feb 2025
- Promised completion6 Dec 2027
- Revised completionNone
- Buildings1 building record
- Documents filed66 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| VAYJANATH | NA | 4 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 9 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 0%.
VAYJANATH: 0% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 9 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed24
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership3
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| RAJESH DATTATRAY GHOLAP | Pune (M Corp.) | Pune |
| SHARAD HARIBHAU GHOLAP | Pune (M Corp.) | Pune |
| SANJEEV DATTATRAY GHOLAP | Pune (M Corp.) | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | DASNURKAR ASSOCIATES |
| Engineer | MR UDAY ARADHYE |
| Engineer | Niranjan S Oak |
| Chartered Accountant | NITESH A MUKADAM AND COMPANY CHARTERED ACCOUNTANTS |
| Chartered Accountant | V A Dudhedia & Co |
| Partner | Role in project |
|---|---|
| PANDIT JAVDEKAR ASSOCIATES | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 16 Jan 2025 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 4 Dec 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 10 May 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 10 May 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 6 Dec 2027
Documents filed66
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: Form 1 Q1 Vayjanath.PDF | 9 Jul 2026 |
| Form 2File: Form 2 Q1 Vayjanath.PDF | 9 Jul 2026 |
| Form 3File: Form 3 Q1 Vayjanath.PDF | 9 Jul 2026 |
| Disclosure of Sold and Booked InventoryFile: sold unsold declaration.PDF | 9 Jul 2026 |
| Form 2A (FY 2025-2026)File: Vayjanath 2A 2025-26.PDF | 30 Jun 2026 |
| Form 1File: Form 1 Vayjanath - 31-03-2026.pdf | 27 Apr 2026 |
| Form 2File: Vayjanath Form 2 -31 03 2026.PDF | 27 Apr 2026 |
| Form 3File: Vayjanath From 3 as on 31 03 2026.pdf | 27 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: Vayjanath Sales Disclosure 31 03 2026.PDF | 27 Apr 2026 |
| Form 1File: Form 1 Vayjanath.pdf | 17 Jan 2026 |
| Form 2File: Form 2 Vayjanath.pdf | 17 Jan 2026 |
| Form 3File: Form 3 Vyajanath.pdf | 17 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure Vayjanath.pdf | 17 Jan 2026 |
| Form 1File: Vayjanath Form-1 30-9-25.PDF | 16 Oct 2025 |
| Form 2File: Form 2 Vayjanath-30-9-25.PDF | 16 Oct 2025 |
| Form 3File: Form-3 Vayjanath 30-9-25.pdf | 16 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Sales Disclosure Vayjanath 30-9-25.PDF | 16 Oct 2025 |
| Form 2A (FY 2024-2025)File: Vayjanath 2A - 31.3.2025.PDF | 6 Oct 2025 |
| Form 5 (FY 2024-2025)File: Vayjanath Form 5.PDF | 30 Sep 2025 |
| Form 1File: Form 1 - Vayjanath 30-6-2025.PDF | 11 Aug 2025 |
| Form 2File: Form 2 - Vayjanath 30-06-2025.PDF | 11 Aug 2025 |
| Form 3File: Form 3 - Vayjanath 30-06-2025_compressed.pdf | 11 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Vayjanath Sales Disclosure 30-06-2025.pdf | 11 Aug 2025 |
| Form 1File: Form 1 - Arch Cert - Dasnurkar - 24-25 Q4.pdf | 7 Jul 2025 |
| Form 2File: Form 2 - Engg Cert - Uday Aradhye - 24-25 Q4.pdf | 7 Jul 2025 |
| Form 3File: Form 3 - CA Nitesh Mukadam - 24-25 Q4.pdf | 7 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold and booked inventory - 24-25 Q4.pdf | 7 Jul 2025 |
| Building plan approvalFile: 2ND SANCTION PLAN 1 1 VAYJANATH.pdf | 10 May 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: 2ND SANCTION CC - VAYJANATH.pdf | 10 May 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 2ND SANCTION PLAN 1 1 VAYJANATH.pdf | 10 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Vayjyanath Form - 1 31-03-2025.PDF | 28 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Vayjanath Form - 3 31-03-2025.pdf | 28 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Vayjanath Form - 2 31-03-2025.pdf | 28 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Vayjanath Sales Disclosure 31-03-2025.PDF | 28 Apr 2025 |
| Other - FinanceFile: Declaration regarding land cost zero.pdf | 3 Feb 2025 |
| Copy of the legal title reportFile: 2.pdf | 16 Jan 2025 |
| Other - LegalFile: 2024 Declaration.pdf | 6 Jan 2025 |
| Other - TechnicalFile: Vayjanath - RERA - Annexure A Declaration cum Undertaking - PJA.pdf | 24 Dec 2024 |
| Proforma of Allotment letterFile: AL.pdf | 10 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Final Compressed.pdf | 10 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 10 Dec 2024 |
| Other - LegalFile: PARTNERSHIP DEED.pdf | 10 Dec 2024 |
| Declaration about Commencement CertificateFile: Format D DECLARATION ABOUT COMMENCEMNT CERTIFICATE.PDF | 10 Dec 2024 |
| CERSAI detailsFile: UNDERTAKING.PDF | 10 Dec 2024 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: Format A-4.pdf | 10 Dec 2024 |
| Deviation Report with respect to Allotment letterFile: DEVIATION WRT AL.pdf | 10 Dec 2024 |
| Other - TechnicalFile: MAIL.pdf | 10 Dec 2024 |
| Deviation Report with respect to model copy of AgreementFile: Vayjanath - Deviation of ATS_compressed.pdf | 10 Dec 2024 |
| Proforma of Agreement for saleFile: Agreement.pdf | 10 Dec 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: ANNEXURE A RAP Sign.PDF | 10 Dec 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: ANNEXURE A SSJ Sign.PDF | 10 Dec 2024 |
| Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B.pdf | 10 Dec 2024 |
| Disclosure for secured/unsecured finance availed for the projectFile: Finance Avail Declaration.pdf | 10 Dec 2024 |
| Layout approvalFile: SANCTION PLAN.pdf | 4 Dec 2024 |
| Building plan approvalFile: SANCTION PLAN.pdf | 4 Dec 2024 |
| PAN CardFile: GetUserDocumentFileContent.pdf | 4 Dec 2024 |
| Copy of the legal title reportFile: 1.pdf | 4 Dec 2024 |
| Details of encumbrances concerned to FinanceFile: GetUserDocumentFileContent.pdf | 4 Dec 2024 |
| Details of encumbrances concerned to FinanceFile: Legal Encumbrance.pdf | 4 Dec 2024 |
| Copy of Layout Approval (in case of layout)File: SANCTION PLAN.pdf | 4 Dec 2024 |
| Declaration in FORM BFile: FORM B.pdf | 4 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM1 ARCH.pdf | 4 Dec 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: CC.pdf | 4 Dec 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: SANCTION PLAN.pdf | 4 Dec 2024 |
| Details of encumbrances concerned to LegalFile: GetUserDocumentFileContent.pdf | 4 Dec 2024 |
| Details of encumbrances concerned to LegalFile: Legal Encumbrance.pdf | 4 Dec 2024 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| ISHKRIPA | FP NO 223 PART 3 A CTS NO 773 PART 6A BHAMBURDA SHIVAJINAGAR PUNE | 10 | Completed | Feb 2015 | Feb 2015 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 35 other registrations, which the RERA portal never shows together
- All 66 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep VAYJANATH on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near PARVATI13,700+ in Pune
Sai Towers
CITY ETHERNAL LLP
ARCO SKYLIFE
ARCO ENGINEERS
Shrirang Park
NBC PROJECTS
NYATI EMBLEM
NYATI CONSTRUCTION PRIVATE LIMITED
SHALIMAR
SONIGARA VENTURES
SUMEDHA
SHREE RAM BUILDERS & PROMOTERS
Builder: PANDIT JAVDEKAR ASSOCIATES
PANDIT JAVDEKAR ASSOCIATES has 36 registrations on MahaRERA, including YAMUNA NIWAS and RAJASHREE. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if VAYJANATH is delayed beyond 6 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of VAYJANATH?
The registered promoter entity is PANDIT JAVDEKAR ASSOCIATES, a partnership as per the filing. Its GSTIN 27AAPFK0643Q1ZP can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in VAYJANATH?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for VAYJANATH?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at VAYJANATH?
The professionals named in the filing: Architect: DASNURKAR ASSOCIATES; Engineer: MR UDAY ARADHYE; Engineer: Niranjan S Oak; Chartered Accountant: NITESH A MUKADAM AND COMPANY CHARTERED ACCOUNTANTS; Chartered Accountant: V A Dudhedia & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in VAYJANATH?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback