Home / Browse projects / Raigarh, Maharashtra / Vatsalya Residency

Registered No litigation declared Residential / Group Housing project

Vatsalya Residency

By VATSALYA DEVELOPER

RG-MH-07350 · RERA P52000055470 · Last updated on MahaRERA portal: 20 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Jun 2028Possession promisedno revision filed
2 of 18Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 80%
173 of 182Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 81 documents Report an error

Vatsalya Residency is a Residential / Group Housing project by VATSALYA DEVELOPER in Raigarh, Maharashtra, registered with MahaRERA as P52000055470 on 1 Apr 2024. Possession is promised by 30 Jun 2028. 9 of the 182 units on this registration are recorded sold or booked, and 2 of 18 construction stages are filed complete.

At a glance

Project

  • NameVatsalya Residency
  • TypeResidential / Group Housing
  • Location
    • Khopoli Road
    • Pen
    • Pen (M Cl)
    • Raigarh
    • 402107
  • Pincode402107
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000055470
  • ReraGenie IDRG-MH-07350

Builder

  • NameVATSALYA DEVELOPER
  • Entity typePartnership
  • PartnersDhiraj Premjibhai Patel, Vatsal Dhiraj Patel

Key dates

this monthRegisteredApr 2024PromisedJun 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on1 Apr 2024
  • Promised completion30 Jun 2028
  • Revised completionNone
  • Buildings2 building records
  • Documents filed81 files

Current status

5%9 of 182 units booked
27.9%Work done, per cost certificate

Figures as on 20 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing A NA121187087
Wing BNA131295095

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 20 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 18 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 80%.

Wing A31%
ActivityProgress
Excavation100%
Basement (if any)Not applicable
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure80%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Wing B0%
ActivityProgress
Excavation0%
Basement (if any)Not applicable
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 20 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingYesNot applicable
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed388

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots388
Closed/Covered218
Open Space170
BuildingClosed/CoveredOpen SpaceTotal
Wing A88170258
Wing B1300130

Land and ownership3

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area4,300 sq m
Land owned byNot the promoter
Named landowners3
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on11 Jul 2025
LandownerVillageDistrict
Tukaram Bhagwan PatilThane (M Corp.)Thane
Santosh Tukaram PatilThane (M Corp.)Thane
Shubhangi Tukaram PatilThane (M Corp.)Thane

Approvals and building plan

Sanctioning authorityPEN MUNICIPAL COUNCIL
Permissible FSI11607.45
Proposed, not sanctioned11,607 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSWASTIK VALUE HEIGHTS, GROUND FLOOR PLOT NO NDR 23, TILAKNAGAR, ADJACENT TO SAHAKAR CINEMA,CHEMBUR MUMBAI MAHARASHTRA 400089
Estimated costRs 32.16 cr
Cost incurredRs 8.97 cr
Work done27.9%
BuildingWingEstimatedIncurred
Wing ANARs 14.95 crRs 8.97 cr
Wing BNARs 14.95 cr-
-NARs 2.25 cr-

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectGruhakalpana
ArchitectGRUHAKALPANA ARCHITECT AND INTERIOR DESIGNER
EngineerHimanshu Shah
EngineerAssociated Consulting Engineers
EngineerMahesh Chopdar
Chartered AccountantKARTIK JAYANTILAL PATEL
Chartered AccountantVELANI AND POKAR
PartnerRole in project
VATSALYA DEVELOPER-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 22 Feb 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 16 Jan 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 18 Dec 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 16 Jan 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2028

Documents filed81

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 81 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Architect Certificate From 31_03_26.pdf20 Apr 2026
Withdrawal Update Form 2File: Form2_Vatsalya Residency_31032026.pdf20 Apr 2026
Withdrawal Update Form 3File: Withdrawal Application Form3 Signed.pdf20 Apr 2026
Withdrawal Update Form 1File: Form 1 - 31122025.pdf14 Jan 2026
Withdrawal Update Form 2File: Form 2 31122025.pdf14 Jan 2026
Withdrawal Update Form 3File: Form 3 Scanned_11zon.pdf14 Jan 2026
Form 2File: Form 2.pdf30 Dec 2025
Form 1File: Form 1.pdf30 Dec 2025
Form 3File: Form 3 ScannedCompressed.pdf30 Dec 2025
Disclosure of Sold and Booked InventoryFile: Inventory Disclosure 31_03_2025.pdf30 Dec 2025
Disclosure of Sold and Booked InventoryFile: Inventory Disclosure 31_03_2025.pdf30 Dec 2025
Form 1File: Architect Certificate _11zon.pdf30 Dec 2025
Form 2File: Form 2.pdf30 Dec 2025
Form 3File: Form 3_31_12_24.pdf30 Dec 2025
Form 1File: Architect Certificate _11zon.pdf30 Dec 2025
Form 2File: Form 2 30092024.pdf30 Dec 2025
Form 3File: Form 3_compressed.pdf30 Dec 2025
Disclosure of Sold and Booked InventoryFile: Inventory Disclosure 31_03_2025.pdf30 Dec 2025
Form 1File: Form 1.pdf30 Dec 2025
Form 2File: Form 2.pdf30 Dec 2025
Form 3File: Form 3.pdf30 Dec 2025
Disclosure of Sold and Booked InventoryFile: Inventory Disclosure 31_03_2025.pdf30 Dec 2025
Building plan approvalFile: Saction Drg 3_11zon.pdf18 Dec 2025
Form 2A (FY 2024-2025)File: Form 2A_Final Signed.pdf22 Nov 2025
Withdrawal Update Form 1File: Architect Certificate Form 1 30_09_2025.pdf16 Oct 2025
Withdrawal Update Form 1File: Architect Certificate Form 1 30_09_2025.pdf16 Oct 2025
Withdrawal Update Form 1File: Architect Certificate Form 1 30_09_2025.pdf16 Oct 2025
Withdrawal Update Form 2File: Engineer Certificate Form-2 30062025.pdf16 Oct 2025
Withdrawal Update Form 2File: Engineer Certificate Form-2 30062025.pdf16 Oct 2025
Withdrawal Update Form 2File: Engineer Certificate Form-2 30062025.pdf16 Oct 2025
Withdrawal Update Form 3File: Withdrawal Application Form3 Scanned.pdf16 Oct 2025
Withdrawal Update Form 3File: Withdrawal Application Form3 Scanned.pdf16 Oct 2025
Withdrawal Update Form 3File: Withdrawal Application Form3 Scanned.pdf16 Oct 2025
Form 5 (FY 2024-2025)File: Form_5_24_25.pdf30 Sep 2025
Withdrawal Update Form 1File: Architech Certificate 30_06_25.pdf19 Jul 2025
Withdrawal Update Form 2File: Engineer Certificate Form-2 30062025.pdf19 Jul 2025
Withdrawal Update Form 3File: CA Certificate Form 3 30062025_11zon.pdf19 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA CERTIFICATE 30_06_2024.pdf2 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Form 2 30_06_24.pdf2 May 2025
Disclosure of sold/ booked inventoryFile: Vatsalya Residency Disclosure of Sold-Unsold Inventory 30-06-2024.pdf2 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate 31_12_24.pdf25 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate 31_03_25.pdf25 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA CERTIFICATE 31_12_2024.pdf25 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA CERTIFICATE 31_03_25.pdf25 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Form 2 31_12_2024.pdf25 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Form 2 31_03_2025.pdf25 Apr 2025
Disclosure of sold/ booked inventoryFile: Vatsalya Residency Disclosure of Sold_Unsold Inventory 31_12_24.pdf25 Apr 2025
Disclosure of sold/ booked inventoryFile: Vatsalya Residency Disclosure of Sold-Unsold Inventory 31-03-2025.pdf25 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 30092024.pdf3 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 30112024.pdf3 Jan 2025
Disclosure of sold/ booked inventoryFile: Vatsalya Residency Disclosure of Sold-Unsold Inventory 30-09-2024.pdf21 Dec 2024
Disclosure of sold/ booked inventoryFile: Vatsalya Residency Disclosure of Sold-Unsold Inventory 30-11-2024.pdf21 Dec 2024
Other - TechnicalFile: Saction Drg 1_11zon (2).pdf28 Mar 2024
Other - TechnicalFile: Saction Drg 2_11zon.pdf28 Mar 2024
Other - TechnicalFile: Saction Drg 3_11zon.pdf28 Mar 2024
Other - LegalFile: Deed of Vatsalya Developer.pdf18 Mar 2024
Other - LegalFile: Partnership Deed.pdf18 Mar 2024
Other - TechnicalFile: Order No 50.pdf16 Mar 2024
Copy of the legal title reportFile: Final Legal Title Report to be upload- Vatsalya Residency.pdf22 Feb 2024
Details of encumbrances concerned to FinanceFile: No Encumbrance concerned to Finance.pdf22 Feb 2024
Details of encumbrances concerned to LegalFile: No Encumbrance concerned to Finance.pdf22 Feb 2024
Declaration in FORM BFile: Form B.pdf22 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate (1)_11zon.pdf22 Feb 2024
Details of encumbrances concerned to FinanceFile: No Encumbrance concerned to Legal.pdf20 Feb 2024
Details of encumbrances concerned to LegalFile: No Encumbrance concerned to Legal.pdf20 Feb 2024
Declaration about Commencement CertificateFile: Format D(32) (2).pdf8 Feb 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Order 34.pdf8 Feb 2024
Building plan approvalFile: Saction Drg.pdf16 Jan 2024
Layout approvalFile: Saction Drg (2).pdf16 Jan 2024
Copy of Layout Approval (in case of layout)File: Saction Drg (2).pdf16 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: Saction Drg.pdf16 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: Full CC Copy.pdf16 Jan 2024
CERSAI detailsFile: Declaration of Cresai.pdf15 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: ilovepdf_merged (1).pdf15 Jan 2024
Deviation Report with respect to Allotment letterFile: Deviation Report of Allotment Letter Vatsalya Residency Ms Vatsalya Developer 18032024 (1)15 Jan 2024
Deviation Report with respect to model copy of AgreementFile: Deviation Report AFS Vatsalya Residency Ms Vatsalya Developer 18032024 (1).pdf15 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Form 1.pdf23 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate.pdf23 Dec 2023
Proforma of Allotment letterFile: Allotment Letter_Vatsalya Residency_Ms Vatsalya Developer_18032024.pdf23 Dec 2023
PAN CardFile: PAN Card Vatsalya Developers.pdf22 Dec 2023

How this compares with Raigarh

5%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Vatsalya Residency on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Pen5,900+ in Raigarh

2 kmVatsalya ResidencyCompleted 1Lapsed / revoked 1Other 2Dot size: filed unitsN

Filed coordinates, straight-line distance. 4 registered projects within 2 km.

Builder: VATSALYA DEVELOPER

VATSALYA DEVELOPER has 1 registration on MahaRERA, including Vatsalya Residency. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if Vatsalya Residency is delayed beyond 30 Jun 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Vatsalya Residency?

The registered promoter entity is VATSALYA DEVELOPER, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Vatsalya Residency?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Vatsalya Residency?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Vatsalya Residency?

The professionals named in the filing: Architect: Gruhakalpana; Architect: GRUHAKALPANA ARCHITECT AND INTERIOR DESIGNER; Engineer: Himanshu Shah; Engineer: Associated Consulting Engineers; Engineer: Mahesh Chopdar; Chartered Accountant: KARTIK JAYANTILAL PATEL. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Vatsalya Residency?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Vatsalya Residency. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Vatsalya Residency to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.