Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No complaints on record
  • Separate project account declared
Dec 2019Possession promisedmoved 12 months from the original
0 of 16Construction stages donefurthest along: Earth work and other leveling..., 0%
12 of 12Units unsoldnot recorded sold or booked
0Complaints at RERA Karnatakaon this registration
Jump to the 53 documents Report an error

VASUNDHARA is a Residential/Group Housing project by VINIT S AMIN in Udupi, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1273/318/PR/171014/000676 on 14 Oct 2017. Possession is promised by 30 Dec 2019. The completion date has moved by 12 months from the original filing. 0 of the 12 units on this registration are recorded sold or booked, and 0 of 16 construction stages are filed complete.

At a glance

Project

  • NameVASUNDHARA
  • TypeResidential/Group Housing
  • Location
    • Udupi
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1273/318/PR/171014/000676
  • ReraGenie IDRG-KA-53038

Builder

  • NameVINIT S AMIN
  • Other registrations6 more →
  • Past their filed date5
  • Declared earlier projects7 →

Key dates

this monthRegisteredOct 2017First promiseDec 2018Revised toDec 2019

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on14 Oct 2017
  • Promised completion30 Dec 2019
  • Revised completionRevised to 30 Dec 2019 (originally 31 Dec 2018)
  • Buildings1 building record
  • Documents filed53 files

Current status

0%0 of 12 units booked

Figures as on Not stated, this project's latest RERA Karnataka filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
VASUNDHARA---12012

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on Not stated, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 16 construction stages are filed complete. The stage furthest along is Earth work and other leveling preparation work, at 0%.

Building: 0% average across the applicable activities

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)Not applicable
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawingsNot applicable

Progress on shared amenities41

As on Not stated, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsNoNot applicable
Sewage and Drainage SystemYes-
Parks & Tree plantingYes-
Street LightingNoNot applicable
Provision for community buildings and for treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalNoNot applicable
Water conservationNoNot applicable
Energy managementYes-
Fire protection and fire safety requirementsNoNot applicable
Education/Health/Other public amenitiesYes-
Electricity supply transformer and substationYes-
Emergency Evacuation servicesYes-
Storm water drainsYes-
Use of renewable energyNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseNoNot applicable
Community HallYes-
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolYes-
GymYes-
ParksNoNot applicable
Power BackupYes-
GasYes-
Water and SanitationYes-
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesYes-
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesYes-
Provision for lodging of management staff and security staffYes-
Water conservation and renewable energyYes-

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,538 sq m
Land owned byNot the promoter
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 9.00 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMRS. RAMANI HANDE P.S.
EngineerMR. U. RAJENDRA MAIYA

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EX/PRM/KA/RERA/1273/318/PR/220622/000676Dec 2018 → Dec 2019

Reason as filed by the promoterothers

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed53

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1273/318/PR/171014/000676 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect Certificate for Work Completion Schedule till DateFile: Vasundhara - 5 A.PDF-
Engineer Certificate for Work Completion Schedule till DateFile: Vasundhara - 6 E-ilovepdf-compressed.pdf-
CA Certificate for Funds UtilizationFile: Vasundhara - 4 CA-ilovepdf-compressed(1).pdf-
Architect Certificate for Pending Work Completion Schedule.File: Vasundhara - 5 A.PDF-
Engineer Certificate for Pending Work Completion Schedule.File: Vasundhara - 6 E-ilovepdf-compressed.pdf-
CA Certificate for Funds required for Project CompletionFile: Vasundhara - 4 CA-ilovepdf-compressed(1).pdf-
AffidavitFile: form b.pdf-
Consent letter from 2/3rd of AllotteesFile: Occupancy Certificate.pdf-
Details Of Sold/ Un-sold UnitsFile: SoldUnsoldDetails.xlsx-
NOC DetailsFile: Vasundhara Fire Clearence-ilovepdf-compressed.pdf-
CC-
Vasundhara Approved Plan 1-il-
Singl layout-ilo-
DEED OF SALE-
AGREEMENT FOR SALE-
RTC-ilov-
Vasundhara Section Drawing-
vasundhara_elevation-
Vasundhara NOC-ilove-
SPECIFICATIONS-
VASUNDHARA EC-il-
Khat - RTC-
Vasundhara DA-il-
All Document-ilo-
Conversion Certificate-
Vasundhara Fire NOC-ilove-
Vasundhara Mescom-
Vasundhara BSNL NOC-
Unnamed document-
Vasundhara Stability-
Vasundhara Approved Plan 1-il-
Balance Sheet 2015 - 2016File: BALANCE SHEET 2016.jpg-
Balance Sheet 2014 - 2015File: Balance Sheet 2015.jpg-
Balance Sheet 2013 - 2014File: Balance Sheet 2014.jpg-
Audited Profit and Loss Statement 2015 - 2016File: Profit & loss 2016.pdf-
Audited Profit and Loss Statement 2014 - 2015File: Profit & Loss 2015.pdf-
Audited Profit and Loss Statement 2013 - 2014File: Profit & Loss 2014.pdf-
Cash Flow Statement 2015 - 2016File: CASH FLOW.jpg-
Cash Flow Statement 2014 - 2015File: Cash flow 2015.jpg-
Auditor's Report 2015 - 2016File: Report 2016-.pdf-
Auditor's Report 2014 - 2015File: Report 2015-.pdf-
Auditor's Report 2013 - 2014File: Report 2014-.pdf-
Income Tax Return Acknowledgement 2015 - 2016File: AKG 2016.jpg-
Income Tax Return Acknowledgement 2014 - 2015File: 2015.jpg-
Income Tax Return Acknowledgement 2013 - 2014File: 2014 ack.jpg-
form b-
Prospectus/BrochureFile: DSC01255.JPG-
Advertisement Copy 1File: DSC01255.JPG-
Tower Excel SheetFile: PRM_KA_RERA_1273_318_PR_171014_000676.xlsx-
Occupancy CertificateFile: Vasundhara Occupancy Certificate.pdf-
Completion certificateFile: Vasundhara E letter.jpg-
Registered Agreement of SaleFile: Agreement_compressed.pdf-
Registered conveyance deed for an individual unitFile: Sale Deed_compressed.pdf-

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 not delivered by the promised date
ProjectLocationStatusPromisedDelivered
BLUEBERRY WOODS-CompletedJul 2017Not delivered
THE CASTLE-Completed-Not delivered
MEADOWS-Completed-Not delivered

How this compares with Udupi

0%of this project is bookeddistrict median 0%
22%of Udupi projects moved their completion datethis one moved by 12 months
0%of Udupi registrations have lapsed or been cancelledthis one is on the register

Computed across the 260+ Udupi projects on ReraGenie, from their own filings.

Keep VASUNDHARA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Udupi260+ in Udupi

2 kmVASUNDHARAOther 47Dot size: filed unitsN

Filed coordinates, straight-line distance. 47 registered projects within 2 km.

Builder: VINIT S AMIN

VINIT S AMIN has 7 registrations on RERA Karnataka, including RAINTREE and Grasslands - Forest Hills. Its filings disclose 7 earlier RERA Karnataka projects, none completed yet. Read the full track record. See more projects on the Udupi district page.

Frequently asked questions

What are my rights if VASUNDHARA is delayed beyond 30 Dec 2019?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of VASUNDHARA?

The registered promoter entity is VINIT S AMIN. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in VASUNDHARA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at VASUNDHARA?

The professionals named in the filing: Architect: MRS. RAMANI HANDE P.S.; Engineer: MR. U. RAJENDRA MAIYA. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VASUNDHARA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VASUNDHARA. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VASUNDHARA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.