Home / Browse projects / Thane, Maharashtra / VASTUKARMA CO-OP. HSG. SOC
VASTUKARMA CO-OP. HSG. SOC
RG-MH-50343 · RERA P51700045201 · Last updated on MahaRERA portal: 25 Jan 2025
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
Nothing adverse is on this record. The buyer report still reads the filed documents themselves.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
VASTUKARMA CO-OP. HSG. SOC is a Others project by SHREE GAJANAN ENTERPRISES in Thane, Maharashtra, registered with MahaRERA as P51700045201 on 10 May 2022. The registration is recorded completed; possession was promised by 31 Dec 2024.
At a glance
Project
- NameVASTUKARMA CO-OP. HSG. SOC
- TypeOthers
- Location
- LOKNAGARI
- SHIVRAM AMBE PATIL NAGAR
- Ambarnath (R)
- Ambarnath
- Thane
- 421501
- Pincode421501
- RERA no.P51700045201
- ReraGenie IDRG-MH-50343
Builder
- NameSHREE GAJANAN ENTERPRISES
- Entity typePartnership
- PartnersDATTATRAY RAGHUNATH KOTEKAR, DIPAK RAMCHANDRA KALVE, VANDANA MANOHAR WALIMBE, SHASHIKANT YASHWANT ZOMAN, OMKAR PRABHAKAR ATHALYE
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on10 May 2022
- Promised completion31 Dec 2024
- Revised completionNone
- Buildings1 building record
- Documents filed59 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| VASTUKARMA CO-OP HOUSING SOCIETY | NA | 8 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 25 Jan 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
3 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 65%.
VASTUKARMA CO-OP HOUSING SOCIETY: 45% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 9% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 65% |
| Sanitary Fittings within the flats / premises | 50% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 25% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 50% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 25 Jan 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| VASTUKARMA CO-OP HSG SOC | Ambarnath (R) | Thane |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | MANOHAR WALIMBE |
| Engineer | ATUL KURTADKAR |
| Chartered Accountant | HAZEL DSOUZA |
| Partner | Role in project |
|---|---|
| SHREE GAJANAN ENTERPRISES | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 4 May 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 14 Oct 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 14 Oct 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 4 May 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 12 Dec 2024
Documents filed59
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Architect’s Certificate on Completion of Project (Form 4)File: Architects Certificates With Promoter stamp Sign.pdf | 25 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificates With Promoter stamp Sign.pdf | 9 Jan 2025 |
| Architect’s Certificate on Completion of Project (Form 4)File: Architects Certificate 08-12-24.pdf | 14 Dec 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Engineering Certificate on Quality Assurance Q2 Ending Sept-2024.pdf | 14 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate 08-12-24.pdf | 12 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineering Certificate.pdf | 12 Dec 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupation Certificate of Vastukarma CHS.pdf | 12 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate of As per rera act Format.pdf | 12 Aug 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECTS CERTIFICATE.pdf | 17 Jun 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineering Certificate of SGE.pdf | 17 Jun 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A as GOM Notification Date 22-12-2021.pdf | 17 Jun 2024 |
| Disclosure of sold/ booked inventoryFile: Discosure of Sold or Book Inventory.pdf | 17 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate of As per rera act_compressed.pdf | 17 Jun 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 FY 2023-24.pdf | 17 Jun 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Re Endorsed बांधकाम परवाना Mar-23.pdf | 4 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECTS CERTIFICATE FORM 1.pdf | 4 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineering Certificate of SGE.pdf | 4 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Quality Assurance Certificate.pdf | 4 May 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold or Book inventory.pdf | 4 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: From 3 CA Certificate.pdf | 4 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: From 3 CA Certificate.pdf | 4 May 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 Annual Report of Statement.pdf | 4 May 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: बांधकाम परवाना Mar-23.pdf | 5 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECTS CERTIFICATE FORM 1.pdf | 5 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineering Certificate of SGE Form 2.pdf | 5 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Quality Assurance Certificate.pdf | 5 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold or Book inventory.pdf | 5 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate and Sold Unsold Inventory.pdf | 5 Apr 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 Annual Report of Statement.pdf | 5 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECTS CERTIFICATE.pdf | 21 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineering Certificate of Shree gajanan Enterprises.pdf | 21 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold or Book inventory.pdf | 21 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate from 3 ( 14-02-24 ).pdf | 21 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold booked inventory.pdf | 9 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate from 3.pdf | 9 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech Certificate 30-09-23.pdf | 25 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineering Certificate 30-09-23.pdf | 25 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate from 3 ( 30-09-23 ).pdf | 25 Oct 2023 |
| Layout approvalFile: Plan for 1st to 7th Floor_.pdf | 14 Oct 2023 |
| Layout approvalFile: Plan for 1st to 7th Floor_.pdf | 14 Oct 2023 |
| Building plan approvalFile: Plan for 1st to 7th Floor_.pdf | 14 Oct 2023 |
| Copy of Layout Approval (in case of layout)File: Plan for 1st to 7th Floor_.pdf | 14 Oct 2023 |
| Copy of Layout Approval (in case of layout)File: Plan for 1st to 7th Floor_.pdf | 14 Oct 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan for 1st to 7th Floor_.pdf | 14 Oct 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: बांधकाम परवाना.pdf | 14 Oct 2023 |
| PAN CardFile: Pancard Of Shree Gajanan Enterprises.pdf | 4 May 2022 |
| Copy of the legal title reportFile: Legal Title Report as per Serculer No 28-2021.pdf | 4 May 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate Form 3 in new format As per Notif No 22Dec21 (1).pdf | 4 May 2022 |
| CERSAI detailsFile: CERSAI Not Applicable Afidavit Due to NO Loan.pdf | 3 May 2022 |
| Building plan approvalFile: layout plan_opt_opt_opt_opt_opt_compressed.pdf | 27 Apr 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: layout plan_opt_opt_opt_opt_opt_compressed.pdf | 27 Apr 2022 |
| Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMENT.pdf | 27 Apr 2022 |
| Layout approvalFile: layout plan_opt_opt_opt_opt_opt_compressed.pdf | 26 Apr 2022 |
| Details of encumbrancesFile: No Encumbrances.pdf | 26 Apr 2022 |
| Copy of Layout Approval (in case of layout)File: layout plan_opt_opt_opt_opt_opt_compressed.pdf | 26 Apr 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE.pdf | 26 Apr 2022 |
| Declaration in FORM BFile: Form B Shree Gajanan Enterprises_opt.pdf | 26 Apr 2022 |
| Proforma of Allotment letterFile: Agreement for sale.pdf | 26 Apr 2022 |
| Proforma of Allotment letterFile: Provisional Allotment Letter.pdf | 26 Apr 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- All 59 filed documents as one ZIP, foldered, with a manifest
Keep VASTUKARMA CO-OP. HSG. SOC on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near SHIVRAM AMBE PATIL NAGAR7,600+ in Thane
CHADHA RESIDENCY
CHADHA DEVELOPERS AND PROMOTERS
KRUSHNA VIHAR - PHASE I
KRUSHAN DHAM BUILDERS & DEVELOPERS
VISHWAJEET MYSPACE
GULABRAO BABURAO KARANJULE PATIL
KHATRI SPARSH
KHATRI REALTY
Tulsi Galaxy
Manas Associates
WALEKAR HOMES
WALEKAR & SON'S DEVELOPERS
See every Thane project, with the district possession charts
Builder: SHREE GAJANAN ENTERPRISES
SHREE GAJANAN ENTERPRISES has 1 registration on MahaRERA, including VASTUKARMA CO-OP. HSG. SOC. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What are my rights if VASTUKARMA CO-OP. HSG. SOC is delayed beyond 31 Dec 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of VASTUKARMA CO-OP. HSG. SOC?
The registered promoter entity is SHREE GAJANAN ENTERPRISES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in VASTUKARMA CO-OP. HSG. SOC?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for VASTUKARMA CO-OP. HSG. SOC?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at VASTUKARMA CO-OP. HSG. SOC?
The professionals named in the filing: Architect: MANOHAR WALIMBE; Engineer: ATUL KURTADKAR; Chartered Accountant: HAZEL DSOUZA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in VASTUKARMA CO-OP. HSG. SOC?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.